Nicosia42 * 4 small conduitSeveral main reasons for obstruction
release time:2024-03-24 04:06:02

The arrangement of the strain gauge shall be installed before the prestressing force is applied, and the bracket shall be fully cooled when the initial reading is measured; If the prestress has been applied, it must be noted in the report that the supporting axial force data reflects the change of the stress of the grouting pipe after the prestress is applied.When the pipe cannot be connected due to serious blockage, the following treatment principles must be followed: when it is the first pile of a certain bridge, core drilling detection must be carried out; when it is not the first pile of a certain bridge, the construction unit shall apply for changing the detection method The low strain reflection wave method or high strain strain strain measurement method shall be used and signed by the supervisor&#;s representative and the person in charge of quality supervision before implementation; In case of pipe blockage of a bridge for many times, core drilling inspection shall be carried out in due time. Common problems and answers of grouting pipe what is the pressure inside the grouting pipe?NicosiaProcess flow: the drilling machine is in place → drilling → mud injection → casing running → continuing drilling → slag removal → hole cleaning → lifting and placing the reinforcement cage → bottom cleaning by water injection → inserting the concrete conduit → pouring concrete → pulling out the conduit → inserting the pile top reinforcement. There are single liquid silicification, double liquid silicification, aerated silicification and electric double liquid silicification. The wellhead clamp head is connected to the lower clamp head of the drive head. Some driving of grouting pipe.Leirvik, performance of grouting pipe the grouting pipe is light in weight, has strong bite force with soil or gravel, is acid-base resistant, corrosion-resistant, and it can also be overlapped (the grouting pipe with overlapping buckle has been developed and can be connected without other materials), and the bending effect during construction is small. However, the grouting pipe has low hardness, poor mechanical damage resistance, which will reduce the overall mechanical properties of the grouting pipe and the grouting pipe.If any crack is found, it shall be repaired in time, when the joint is deformed and subjected to water pressure, the ability of the grouting pipe to resist external forces will be greatly reduced. When positioning the grouting pipe, it must be kept flat at the interface, and the grouting pipe must not be allowed to roll or kink. If it is found that there is no twist, it should be adjusted in time. When casting and fixing the grouting pipe, the deviation of the grouting pipe shall be prevented so as not to shorten one side and affect the water stop effect. When pouring and tamping the concrete, it must be vibrated sufficiently to prevent the poor combination of the grouting pipe and the concrete from affecting the water stop effect. The grouting pipe joint must be well bonded. If the construction site conditions are available, the method of hot vulcanization connection can be used.?A short section of screw end rod is welded on both ends of a single prestressed thick steel bar, and the nut and backing plate are sleeved to form the simplest grouting pipe. The pretension force is transmitted to the nut through the bearing force on the threaded slope of the screw end rod, and then to the concrete components around the reserved hole crossing through the base plate.Let&#;s take a look at the prestressed machines and tools. The small editor of prestressed machines and tools reminds everyone that the screw end rod is made of cold drawn or heat-treated reinforcement, and the thread is fine teeth. The welding between the end rod and the prestressed reinforcement should be carried out before the cold drawing of the prestressed reinforcement. This grouting pipe can be used at the tensioning end and the fixed end. A general jack is used for tensioning, and the jack pull rod (with internal thread at the end) is tightened on the thread of the screw end rod for tensioning. After tensioning, tighten the nut and anchor the rebar. The advantages of this grouting pipe are relatively simple, and when the jack returns oil after the grouting pipe, the prestressed reinforcement basically does not slide. If necessary, facilitate re tensioning. The disadvantage is that the accuracy of the length of prestressed reinforcement is high, otherwise the thread length is not enough.


Nicosia42 * 4 small conduitSeveral main reasons for obstruction



Appropriate measures shall be taken to prevent surface water, curing water and garbage from falling in. When necessary, a sump shall be set near the post cast strip of the base plate in combination with the design of the basement plane drainage system to facilitate the final cleaning before the grouting pipe is cast. When advance water stop is not used, a sump shall be set, which can be set in the basement according to the above method, or set outdoors as a temporary facility. Usually, we use the waterproof scheme between the grouting pipe and the water surface or before, and there are many methods for the grouting pipe to stop water in advance. It should be noted that the design unit should participate in the review of the construction organization design of the basement, so as to determine a complete implementation scheme of advanced water stop before the excavation of the foundation pit and the pouring of the cushion. Otherwise, the design modification requirements will be put forward only when problems are found in advance water stop during construction, which will affect the integrity and rationality of the whole water stop scheme.Development trend editor since the advent of Portland cement in , cement grouting has been the main grouting method in engineering. However, ordinary cement can only be filled with sand gravel or pores with a diameter greater than . ~ .mm due to its coarse particles. Therefore, improving the fineness of cement particles has become the main way to improve the groutability of cement slurry. Some countries have developed a kind of ultra-fine cement, which can pour fine sand with permeability coefficient of - ~ -cm / s and micro cracks in rocks. It is a promising granular grouting material. Propionate is a kind of water-soluble polymer chemical slurry, whose viscosity is close to that of water. It is widely used in anti-seepage grouting and dynamic water plugging of fine rock cracks and medium fine sand layers. However, this kind of pulp material is toxic and pollutes the air and groundwater, so most of them have stopped production and use. In , AC slurry was developed in the United States, and in , ac-ms slurry was developed in China. The toxicity of this kind of slurry is very small (only % of the toxicity of propionate). It is an ideal anti-seepage slurry. The non alkaline silicate slurry developed in Japan has no alkaline pollution to groundwater, low viscosity, high gel strength good durability and does not change the pH value of groundwater. [] Grouting method is divided into ceramic process grouting and construction engineering grouting. Ceramic process grouting is the process of using the prepared mud injection in ceramic production. Construction engineering is to use appropriate methods to inject some curable grout into the cracks or pores of the rock and soil foundation, and to improve its physical and mechanical properties through replacement, filling, extrusion and other methods to make ceramic bodies suitable for processing.Make it into a certain shape, size and specification. Seepage prevention Water plugging Among the many imported projects, Germany, Italy, Britain and other countries, up to now, domestic manufacturers have introduced more than sealing strip production lines. In addition to pure rubber sealing strips, sealing strips of various composite structures, metal skeleton and various rubber composite sealing strips, rubber and plastic composite sealing strips can be produced. At present, the overall level of China&#;s sealing strip production technology has basically reached the level of foreign countries in the s, and has become a grouting pipe. Because some projects are not easy to detect when they are manufactured, and the quality of the grouting pipe as a channel for testing instruments has become crucial. If the quality of the grouting pipe is poor, it will bring many hidden dangers. Steel grouting pipe material which has the characteristics of thin pipe wall,NicosiaAdvance support of small conduit, steel saving impermeability, pressure resistance and high strength, is generally used for post tensioned reserved holes in prestressed structures. When the grouting pipe is used, it can be directly bound to the reinforcement framework. Because the grouting pipe is very light, it is very convenient to operate. However, attention should be paid to the balance of its axis during installation.Total quality assurance,The important reason for the stability of the grouting pipe reinforced soil subgrade is to further verify the main principle of the grouting pipe reinforced soil subgrade treatment technology. It is to place various types of grouting pipe products inside, on the surface of the soil mass or between the layers of soil mass. Relying on the tensile characteristics of the grouting pipe, the distribution of the internal stress field and displacement field of the reinforced soil mass is changed through the friction and embedment between the grouting pipe and the surrounding soil mass. Sometimes the grouting pipe is overlaid on the two sides of the horseshoe surface. Adjust the cooperation specifications of the grouting pipe at the distribution nozzle. How to avoid grout leakage during installation of grouting pipe? performance of grouting pipe the grouting pipe is light in weight, is acid-base resistant, corrosion-resistant, aging resistant and easy to construct. It has high tensile strength (- times higher than that before stretching) and low elongation (only % - % of that before stretching). It is easy to cut and connect on site (polyethylene rope or connecting rod can be used for connection), and it can also be overlapped (the grouting pipe with overlapping buckle has been developed and can be connected without other materials), and the bending effect during construction is small. However, the grouting pipe has low hardness, poor mechanical damage resistance, and mechanical scars such as scratches and crushed stones will produce stress concentration, which will reduce the overall mechanical properties of the grouting pipe and the grouting pipe.


Nicosia42 * 4 small conduitSeveral main reasons for obstruction



If any crack is found, it shall be repaired in time, the ability of the grouting pipe to resist external forces will be greatly reduced. When positioning the grouting pipe when the joint is deformed and subjected to water pressure, it must be kept flat at the interface, and the grouting pipe must not be allowed to roll or kink. If it is found that there is no twist, it should be adjusted in time. When casting and fixing the grouting pipe, the deviation of the grouting pipe shall be prevented, so as not to shorten one side and affect the water stop effect. When pouring and tamping the concrete, it must be vibrated sufficiently to prevent the poor combination of the grouting pipe and the concrete from affecting the water stop effect. The grouting pipe joint must be well bonded. If the construction site conditions are available, the method of hot vulcanization connection can be used.?Product survey,The commonly used standard for grouting pipe is the inner diameter of -mm. The wall thickness of the pipe has little effect on the sound transmission, so there is generally no need to restrict the thickness of the pipe wall. However, from the perspective of saving steel consumption, it is OK if the pipe wall can bear the lateral pressure of new concrete, not necessarily the thicker the better.Grouting pipe is a kind of embedded grouting pipe system, which is used for permanent sealing of construction joints, cold joints, pipe seepage joints and gaps between ground walls in concrete. It is very important to install grouting pipes between the joints of new and old concrete. When water seeps into the joint, the PVC end grouting pipe merchants set on the surface can choose to ship at a fair price to reduce the purchase when the future market trend is not clear, and the inventory of grouting pipes has decreased slightly. Affected by insufficient demand, the transaction has been tepid and the daily turnover is basically below tons. At present, the steel price may have reached the bottom, and there is limited room for decline in the later period. The future price may still be dominated by maintaining stability. Affected by the fact that Bagang has delivered less resources recently, some local specifications are out of stock, and businesses are also reluctant to sell. However, the overall structural adjustment pressure of the steel industry is obvious, the overall performance of the manufacturing industry is still relatively sluggish,NicosiaExpanded shell hollow grouting anchor manufacturer, and the price policy of first-line steel mills in October also maintained a stable but declining tone. At present, the overall fundamentals of the steel market remain negative. Near the end of the month, the pressure of the grouting pipe steel traders to withdraw funds and the tightening tone of the central bank&#;s monetary policy kept the overall liquidity tight. In addition, the differentiation of cold and hot-rolled price trends combined with the decline of the overall profitability of the current steel industry will make steel mills or increase their power to produce current star products. Therefore, we still need to be vigilant about the hot-rolled market, and there will not be much reversal in the short term. From the performance of the internal and external markets, the game between the long and short sides is prominent, and the short side increases the price, which makes the iron ore market rise and touch the wall. It is expected that the iron ore will maintain the interval fluctuation state in the near future, and the fluctuation space of the grouting pipe is limited. This method can seal the joint. The grouting time can be selected after the concrete curing. Leakage joints can also be permanently sealed in this way. Manufacturing method of fast cutting device in the hole of underground grouting pipe [Patent Abstract] the utility model discloses a fast cutting device in the hole of underground grouting pipe which is mainly composed of a fixed cutting device , a tension blade device and a cutting rotation device . The tension blade device is sleeved in the cutting rotation device. The tension blade device and the cutting rotation device are connected by threads, A blade tightening nut is arranged at one end of the tightening blade device extending out of the cutting rotating device. The cutting blade and pulley are fixed and installed on both sides of the cutting rotating device. The utility model is arranged in the grouting pipe, which reduces the operating intensity of workers by using the lead screw principle. The rotary cutting in the casing reduces the quantities of clearing the tunnel floor; The cutting depth can also be adjusted at will according to the actual situation of the roadway. The working efficiency is - times higher than that of manual cutting, which can greatly reduce the labor intensity of workers.The main elastic element of the grouting pipe is the stainless steel grouting pipe, which compensates the axial, lateral and angular direction of the pipe by the expansion and bending of the grouting pipe.Nicosia,The stability of the grouting pipe is one of the important factors to control the stability of the whole foundation pit. Its erection must be accurate and in place, and prestress must be applied in strict accordance with the design requirements. In particular, attention should be paid to the stability of the diagonal bracing. During the diagonal bracing operation, every link of the installation must be carefully operated. At the same time, the steel purlin must also ensure its stability, strength and deformation requirements during the production and installation process. In addition, During the whole construction process from foundation pit grouting pipe erection to removal, the grouting pipe must be strictly monitored to ensure its stability. How to improve the bearing capacity of piles with grouting pipes in bored piles, the soil layer around the piles will become loose due to the agitation of the turning heads. In addition, the water immersion makes the soil layer that has started to loosen more loose. This problem can be effectively solved by grouting with grouting pipes. How to improve the bearing capacity of piles when grouting with grouting pipes?The important reason for the stability of the grouting pipe reinforced soil subgrade is to further verify the main principle of the grouting pipe reinforced soil subgrade treatment technology. It is to place various types of grouting pipe products inside, on the surface of the soil mass or between the layers of soil mass. Relying on the tensile characteristics of the grouting pipe, the distribution of the internal stress field and displacement field of the reinforced soil mass is changed through the friction and embedment between the grouting pipe and the surrounding soil mass. It is a thermoplastic material, which can be processed and formed many times, providing convenience for hot melting and electrofusion connection of pipes.


comment list
©2009-2024Industrial Microblog  Sitemap