AitosHigh overload capacity distribution transformerThe recent market price rebound
release time:2024-03-28 16:27:49

Power transformers are used in all walks of lifeThe time difference between different steps of three-phase power switch of switching power supply shall be less than ms, the closing shall be maintained by high-voltage arrester, and the neutral line of transformer shall be reliably grounded (it shall be grounded immediately).Aitos,During the operation of the transformer, the resistance value of the grounding wire shall be measured accurately every two years.Common problems of tap changer of power transformerBisceglie,Fault judgment of power transformerWhat is the wiring mode of dry-type transformer?& ldquo; of wiring transformer; Enter & rdquo; And & ldquo; Output & rdquo; Use a megger to test the grounding resistance between the terminal and the ground wire. When accurately measured by V megger, which can control the oscillation below .%, and then reduce the building structure noise transmitted by dry-type transformer oscillation.Precautions for trial operation of power transformer manufacturersWhen the power transformer operates at full load, it needs a large reactive load. This reactive load shall be provided by the power supply and distribution system. If the transformer volume is too large, but also make the transformer operate at full load or load for a long time, expand the proportion of full load loss, reduce power factor and increase Internet loss. Such operation is neither economic development nor scientific.Inspection basis,If the volume of power transformer is too small, the transformer will be overloaded for a long time and it is easy to destroy machinery and equipment. Therefore, the rated capacity of the transformer should be selected according to the power consumption,AitosTechnical parameters of power transformer,AitosPower transformer installation picture, which is not suitable for too large or too small.When the power transformer operates at full load, it needs a large reactive load. This reactive load shall be provided by the power supply and distribution system. If the transformer volume is too large, it will not only increase the initial project investment,AitosInstallation drawing of dry-type transformer, but also make the transformer operate at full load or load for a long time, expand the proportion of full load loss, reduce power factor and increase Internet loss. Such operation is neither economic development nor scientific.The insulating layer shaft and the connecting articles between the bell jar and the core shall be removed. If it is a hanging bell inspection, the oil shall be pumped into the bottom of the bell jar before the bell jar can be removed.


AitosHigh overload capacity distribution transformerThe recent market price rebound



Power transformer is one of the key equipment in power station and substation. The function of power transformer is in all aspects. It can not only raise the voltage and send electromagnetic energy to the power consumption area, but also reduce the voltage to each application voltage so as to meet the needs of power consumption. In short, voltage transformation and blood pressure reduction must be carried out by the transformer.Home page recommendationAfter the test, connect the data signal contact of the automobile relay with the alarm circuit, the pull-in contact with the opening circuit, and adjust the overcurrent protection value.At rated power, i.e. & ETA; Is the efficiency of the transformer; P is the input power and P is the output power.Noise solution of dry-type transformerAitosIt will also produce many faults, effectively deal with various faults of oil immersed transformer, make full use of the performance indicators and advantages of oil immersed transformer, and continuously improve the safety factor of oil immersed transformer. Ignition is a common fault of oil immersed transformer. The key fault of oil immersed transformer is short-circuit fault, and short-circuit fault is more general.kV and above & plusmn; No load of rated voltage; Part of the circuit breaker of the tap power switch is installed in the phenolic resin insulating paper cylinder, and the insulating paper cylinder is installed on the wooden frame. The actual operation rocker is connected with the dynamic circuit breaker of the tap power switch according to the wooden insulating rod. The on load tap off power switch is insulated from the ground by the insulating paper cylinder of the power switch itself and the insulating limit.When the screw of the through core extruder holding the iron core of the transformer is loose, there are screw cap parts left on the iron core, or small metal materials fall into the transformer, the transformer will send out & ldquo; Ding Ding Dang & rdquo; Or & ldquo; Call & hellip; Call & hellip& rdquo; Blowing sound and its & ldquo; Squeak, squeak & rdquo; It's like a magnet sucking a small washer, while the working voltage, current and temperature of the transformer are all normal. Such conditions generally do not endanger all normal operation of the transformer, and can be solved until power failure.

comment list
  • Heat pump drying equipment

    AitosHigh overload capacity distribution transformer The delivery is fast and the quality is good, but the logistics is a bit slow. Overall it is good, continue to support!

  • fire extinguisher

    AitosHigh overload capacity distribution transformer Tell me a price, is there a detailed price for the parameter?

  • Gottwain

    Although AitosHigh overload capacity distribution transformer has not yet arrived, I am looking forward to it, and the inquiry is still in transit.

  • Ruishun Real Estate Brokerage Company

    Good seller, AitosHigh overload capacity distribution transformer things are very good. Come back in the future. You can buy with confidence.

©2009-2024Industrial Microblog  Sitemap