Santa AnaAndreaTechnology in the improvement of environmental performance
release time:2024-04-23 05:21:24

Setting requirements: The main connection methods between the wall bracket and the building include: connecting the wall bracket with the embedded parts on the wall; Fix with wall bolts; Embedded bolts; Welding with steel structures.Installation verticality deviation guide rail frame erection height, h/mH≤ H& gt; verticality deviation/mm≤ (/h≤ ≤ ≤ ≤ pairs of steel wire rope construction electric elevators, the verticality deviation of the guide rail frame should not exceed (/) h.Santa Ana,Is the water cooling and air cooling of the hydraulic station the same?Speed limiter. To prevent the driving speed from exceeding the normal speed. A speedometer should be installed (not required for floors below or including the second floor), which is an individual mechanism that is integrated with a safety clamp; The entrance and exit of the passenger compartment should be equipped with safety doors. Public places, family dormitories, andTchamba,Setting requirements: The layout and installation of all cables and wiring of electric elevators should be able to prevent mechanical damage.Work is essential, and the main protective accessories include safety belts, guardrails, protective covers, platforms and stairs, etc.The scissor type electric elevator is a widely used high-altitude operation special equipment. Its scissor mechanical structure ensures high stability of the lifting platform, wide working platform, and high bearing capacity, making the high-altitude operation range wider and suitable for multiple people to work simultaneously. It makes high-altitude operation more efficient and safer


Santa AnaAndreaTechnology in the improvement of environmental performance



Low level doors should be equipped with interlocking devices that can verify their closed and locked positions. The action of this interlocking device should be at the entrance of the cage. Simple use should not interfere with the operation of the interlocking device. The attached wall bracket should use matching standard products. When the wall bracket cannot meet the requirements of the construction site, stability, etc., and the production should meet the design requirements.The impact load can cause early wear, fracture and fragmentation of mechanical structural components, as well as generate impact pressure in the hydraulic system, which in turn can damage hydraulic components, oil seals, and high-pressure oilModel Example: Hanging Cage Specification: LABSC/TDx Type I: ~ Type II: ~ Type V: ~ Technical Requirements: The load-bearing capacity of the foundation should be greater than P: P=(hanging cage weight+outer cage weight+total weight of guide rail frame+counterweight+load) x. (kN).Total quality assurance,Setting requirements: The layout and installation of all cables and wiring of electric elevators should be able to prevent mechanical damage.Setting requirements: Each landing entrance should be equipped with a landing door, which should cover the opening with its full width, and should not open towards the lifting passage.Principle of electric elevator rotary valve: When the electric elevator rises, the rotary valve will automatically open. To close the plug valve, it is necessary to first turn the handle to turn the plug to a degree position until it is closed,Santa AnaKarigarin, and then turn the transmission handwheel to lower the plug and achieve sealing.


Santa AnaAndreaTechnology in the improvement of environmental performance



Monthly maintenance and inspection of hydraulic lifting platform rollers, intermediate shafts and bearings, oil cylinder pin shafts and bearings, boom hinge shafts and bearings for wear. Add some oil to each part to extend the service life of the lifting platform bearings. The quality and level of hydraulic oil. The lifting platform should be raised throughout the entire process, and at this position, the hydraulic ground should be - millimeters higher than the bottom of the box. If the hydraulic oil becomes dark, sticky, or has foreign objects such as gravel, it should be replaced in a timely manner ( # hydraulic oil). Annual maintenance and inspection of all hydraulic pipelines and joints of the lifting platform. The pipeline must not be damaged, and the joints must not be loose. All joints must be tightened. Remove and disassemble the lowering valve of the lifting platform, blow out the plunger with compressed air, then install it and reinstall it. Drain and discard the hydraulic oil, tighten the joint,Santa Anadevotion to parents and loyalty to friends, remove the oil filter, clean it with compressed air, and then return it to the oil tank and connect the pipeline.Test results,When the wall bracket cannot meet the requirements of the construction site, it should be designed and calculated separately.Setting requirements: A limit switch should be set at both the upper and lower ends of the stroke, which should be able to cut off the power supply before the suspension cage and other mechanical stop devices (such as buffers),Santa AnaOklahoma, so that the suspension cage can stopMonthly maintenance and inspection of hydraulic lifting platform rollers, intermediate shafts and bearings oil cylinder pin shafts and bearings, boom hinge shafts and bearings for wear. Add some oil to each part to extend the service life of the lifting platform bearings. The quality and level of hydraulic oil. The lifting platform should be raised throughout the entire process, the hydraulic ground should be - millimeters higher than the bottom of the box. If the hydraulic oil becomes dark, sticky or has foreign objects such as gravel, it should be replaced in a timely manner ( # hydraulic oil). Annual maintenance and inspection of all hydraulic pipelines and joints of the lifting platform. The pipeline must not be damaged, blow out the plunger with compressed air, then install it and reinstall it. Drain and discard the hydraulic oil, tighten the joint, remove the oil filter, clean it with compressed air, and then return it to the oil tank and connect the pipeline.Santa Ana,The bearing capacity of the building structure at the attachment point of the wall bracket should meet the requirements specified in the user manual for construction electric elevators.The verticality of the guide rail frame should meet the requirements of the specifications.Model Example: Hanging Cage Specification: LABSC/TDx Type I: ~ Type II: ~ Type V: ~ Technical Requirements: The load-bearing capacity of the foundation should be greater than P: P=(hanging cage weight+outer cage weight+total weight of guide rail frame+counterweight+load) x. (kN).


comment list
  • Kaiyuan Water Supply Technology Company

    A good seller, even a novice, a lot of Santa AnaAndrea don’t understand. Fortunately, the seller has patient guidance on the other end of the computer, and I have a sense of accomplishment, and finall

  • oven

    Buying things online is about integrity, and you do it! Thank you Santa AnaAndrea Like one Fast delivery, very good attitude, very satisfied! very good!

  • Stamping

    I'm quite satisfied, and the quality and workmanship are even worse. Look back and introduce to friends

  • outdoor ground

    Santa AnaAndrea The quality is very good, I bought it for the second time, the goods are good, the boss is very good

  • Zezhou Home Building Materials City Liability Company

    You Santa AnaAndrea are good, is it convenient to place an order?

  • Cote Casting Co.

    Very good buyer. Thank you. My colleagues like it very much Santa AnaAndrea. Come again next time

©2009-2024Industrial Microblog  Sitemap