Ivano frankovskDry type transformer testFactors affecting use
release time:2024-04-27 18:27:36
there must be a strong line breaking component, so that sliding flash charge and discharge may occur at a lower current. In order to better solve this disadvantage, the appearance of the insulating parts between the winding and the iron yoke should be the same as that of the medium horizontal plane of the winding to the iron yoke insulation as far as possible, so as to reduce the electric field component intersecting with the insulating parts.Ivano frankovsk,The secondary inductive equipment of the distribution station (such as transformer, voltage transformer, automobile relay, AC, etc.) operates normally. According to the AC current, the winding transformer core will send out a symmetrical rhythm and a certain tone & ldquo; Buzz, buzz & rdquo; Sound. The operation staff of the transformer manufacturer should understand and grasp the characteristics of the noise. When the equipment has common faults, there will be noise and even & ldquo; Crackle & rdquo; The charging and discharging sound can distinguish the generation and characteristics of common equipment faults according to the music law and sound transformation when everything is normal and abnormal.Wiring mode of dry-type transformer:RecifeTherefore, in the operation prevention and regulation of relay protection dry-type transformer, it is necessary to find the short-circuit fault point according to the fault situation, lock the fault point, and analyze the short-circuit fault types of relay protection dry-type transformer. At the same time, if all fields are clear disconnect the switching power supply at the fault point,Ivano frankovskScb11 three-phase distribution dry-type transformer, the maintenance work of employees will be carried out smoothly, and the harm will not expand to a greater extent.If the power transformer stops running for more than h (if the allowable time should be reduced when the ambient humidity is & amp; gt; %), it should be insulated before putting into use, and accurately measured with a V grounding megger. The insulation resistance from the primary side to the secondary side and the ground should be ^ mfl, the insulation resistance from the secondary side to the ground should be ^ mh, and the insulation resistance from the iron core to the ground should be & amp; gt; mfl (note that the grounding device piece should be removed).Operation of oil immersed transformer


Ivano frankovskDry type transformer testFactors affecting use



The noise of dry-type transformer is mainly the vibration noise in operation. This vibration noise is caused by multiple positions, rats, snakes, cats, birds and other animals, resulting in vicious common faults such as short-circuit fault and power failure, and provide a safe natural barrier for the energized part. If the transformer equipment must be outdoors, IP protective casing can be adopted, which can avoid being equally divided with the above IP protective effects However,Ivano frankovsk15KVA control transformer, IP casing will reduce the refrigeration capacity of the transformer, so pay attention to the reduction of its operating volume.The noise of dry-type transformer belongs to low-frequency noise. In a small area, most of it is scattered according to the building structure. This kind of low-frequency noise is scattered to the household house according to the house building, and then causes gas vibration noise, which is then scattered to the ears of consumers. Although the amount of noise is not very large, the dispersion spacing and adverse effects are very large.Good reputation,& ldquo; of wiring transformer; Enter & rdquo; And & ldquo; Output & rdquo; Use a megger to test the grounding resistance between the terminal and the ground wire. When accurately measured by V megger the resistance value exceeds m ohm bus.The no-load impulse closing working voltage shall not exceed % of the working voltage marked on the gear of the transformer, the delay time after power receiving shall not be less than min the closing frequency shall be times, and the time interval of each closing shall not be less than min.In the whole process of transmitting electromagnetic energy in the power supply system, it will inevitably cause the loss of voltage and output power. When transporting the same output power, the voltage loss is inversely proportional to the voltage, and the output power loss is inversely proportional to the square meter of voltage. The transformer is used to increase the voltage and reduce the closing damage.


Ivano frankovskDry type transformer testFactors affecting use



kV and above & plusmn; No load of rated voltage; Part of the circuit breaker of the tap power switch is installed in the phenolic resin insulating paper cylinder, and the insulating paper cylinder is installed on the wooden frame. The actual operation rocker is connected with the dynamic circuit breaker of the tap power switch according to the wooden insulating rod. The on load tap off power switch is insulated from the ground by the insulating paper cylinder of the power switch itself and the insulating limit.Excellent service,After no-load test run is normal for h, it can be transferred to on-load operation, % and % by grade.Transformer manufacturers said that at this stage, China's energy-saving distribution transformer market is relatively scattered, coupled with the constraints of factors such as low threshold in the field, uneven companies, lack of evaluation and specifications, and inadequate technical innovation, resulting in slow marketing of energy-saving transformers.The long-term overload of power transformer will slowly cause the scalding and insulation aging of solenoid coil, resulting in short circuit between coils, two-color short circuit or short circuit on the ground, resulting in the ignition of power transformer. Therefore,Ivano frankovskSpecification of oil immersed transformer, the insulation compressive strength of power transformer shall be tested before installation and operation, and overload is not allowed in the whole process of operation.Ivano frankovsk,& ldquo; YN, D & rdquo;, in which indicates that when the working voltage phasor of the primary side line, as the minute hand, refers to the position at o'clock, the phase voltage phasor of the secondary side is at o'clock. That is, the phase voltage UAB of the secondary side lags degrees behind the working voltage uab of the primary side line (or degrees ahead).The power transformer conductor refers to the connecting transmission line between each electromagnetic coil, between the electromagnetic coil and the group outlet pipe, and between the electromagnetic coil and the tap changer.For the leakage that has already occurred, find the leakage point first, which can not be ignored. For the position with serious leakage, shovel or sharp punch can be selected. The leakage point can be riveted with special tools for metal materials. After manipulating the leakage, the treatment surface shall be cleaned and tidy. Polymer composite materials are mostly selected for dry consolidation. After dry consolidation, the goal of long-term treatment of leakage can be achieved.

comment list
©2009-2024Industrial Microblog  Sitemap