MariupolNormal operating temperature of dry-type transformerProblems in the work and improvement measures
release time:2024-04-25 17:36:36

The method and whole process of taking oil sample of power transformer are as follows:The insulation distance between the winding and the iron yoke of power transformer is much larger than that between the windings,MariupolBox type transformer, most of the cables are in phase with the insulating cylinder (plate) in the middle of the winding that is, the disconnection component of the electric field is small.Mariupol,Dry type transformer, a static electrical equipment, is used to change the AC current (current) of a certain standard value into another or several types of working voltage (current) with the same frequency and different standard values. According to the supervision sampling inspection data of the third quarter of last year released by AQSIQ,MariupolModel of power transformer, among the kinds of dry-type transformer commodities manufactured by manufacturers in provinces and municipal districts across the country, kinds of commodities were found to be inconsistent with the provisions of relevant specifications, with a compliance rate of %& ldquo; This result mostly shows the quality level of China's dry-type transformer industry at the present stage.The method and whole process of taking oil sample of power transformer are as follows:Holy Louis,In relay protection dry-type transformer, the disconnection of the fault point is related to each other. In a word, if there is any problem at a certain point, it will affect the whole power circuitBefore no-load impulse closing, the transformer shall be placed for h, and the rising seat and waterproof sleeve installed with vent plug shall be deflated on time.Oil leakage of cast iron parts


MariupolNormal operating temperature of dry-type transformerProblems in the work and improvement measures



The first step of the whole wave process calculation is to calculate the basic parameters of the Internet such as inductance, capacitance and resistor. The accuracy of those basic parameters does great harm to the calculation results of the whole wave process. For the inductance calculation, the good model is the solid model of infinite transformer core column, but there are many calculation methods.Visual inspection method for transformer inspectionAfter the oil is drained, all anchor bolts of the automobile oil tank at the upper end of the detachable oil cover shall be tied with the lifting jack and the lifting point shall be on the common earrings or bolts. If necessary, the human resources traction belt shall be used as a guide.Professional is king,Method and process of taking oil sample of power transformerThe no-load impulse closing working voltage shall not exceed % of the working voltage marked on the gear of the transformer, the closing frequency shall be times, the delay time after power receiving shall not be less than min,The project cost is different. Compared with the purchase price of capacity transformer,MariupolIntroduction to dry type transformer, the purchase price of dry-type transformer is much higher than that of oil immersed transformer.First of all, although dry-type transformer has strong moisture resistance, it is generally open structure or very susceptible to moisture, especially the insulation level of dry-type transformer manufactured in China is low (lower flame retardant grade) Therefore, the dry-type transformer can obtain high stability only when the air humidity is below %. The dry-type transformer shall also be prevented from stopping operation for a long time to prevent serious damp. When the grounding resistance value is less than / V (operating voltage), it indicates that the transformer is seriously damp,Avoid the load operation of power transformer: if the load operation is long-term, it will lead to the scalding of solenoid coil, slow aging of insulation, short circuit fault between boxes, two-color short circuit fault or short circuit to ground fault and dissolution of oil.Causes of fire in power transformerThe electromagnetic coil is wound with copper power wire or foil and lifted with glass fiber. The epoxy adhesive does not need filling. The vacuum drying equipment is used for degassing and dehumidification. The overall concrete is poured with high fracture toughness, resistance to short-circuit faults, common faults and impact. The work is diligent.

comment list
©2009-2024Industrial Microblog  Sitemap