AachenTwo layers of hydraulic lifting cargo elevatorPublish Operation Guide
release time:2024-04-25 20:44:49

Before the elevator manufacturer connects the motor to the elevator, please make the keyway of the motor shaft perpendicular to the tightening bolt. In order to ensure uniform force, please screw on the mounting bolts at any diagonal position first,AachenElevator enterprise, but do not tighten them tightly, then screw on the other two mounting bolts at diagonal positions and then tighten the four mounting bolts one by one. Finally, tighten the tension bolts. All tightening bolts need a torque wrench to fix according to the marked fixed torque data and check whether the lift and lifting platform are used.How should we check the construction site of the construction hoist? you know?Before the elevator manufacturer connects the motor to the elevator, please make the keyway of the motor shaft perpendicular to the tightening bolt. In order to ensure uniform force, please screw on the mounting bolts at any diagonal position first, but do not tighten them tightly, then screw on the other two mounting bolts at diagonal positions, and then tighten the four mounting bolts one by one. Finally tighten the tension bolts. All tightening bolts need a torque wrench to fix according to the marked fixed torque data and check whether the lift and lifting platform are used.How should we check the construction site of the construction hoist? you know?Aachen,Now we have more and more demands for elevators, we should often carry out inspection, which will not only prolong the service life of the guide rail type elevator, but also make it work more powerfully! For example, there should be enough oil in the transmission part, and the wearing parts must be checked, repaired or replaced frequently. For mechanical bolts, especially parts that vibrate frequently, such as slewing rings and lifting arm connecting bolts, check whether they are loose. Loose must be tightened or replaced. The steps of maintenance are introduced below: important maintenance work of the rail-type elevator. Regularly check the tire pressure of the rail-type elevator and whether the condition of the bearing is normal; regularly check whether the structure of the bracket and the panel is in good condition. Grease is added once a month; the wearing parts must be checked, repaired or replaced frequently, such as bolts and slewing bearings, should be checked for looseness. If they are loose, they must be tightened or replaced immediately.Always check all wires and cables for damage. The damaged part should be bandaged and replaced in time.Bahau,Walking: assisted self-propelled, two-wheel traction, self-driving, and car modified.Prepare the foundation according to the foundation plan, pay attention to the alignment, leveling, and alignment to ensure the level of the foundation and various requirements for use.In the construction elevator, the switch box also has leakage protection equipment. Its wires and cables are well insulated, without leakage, and the metal threaded is not rusted, and its damage is close to zero. His steel wire rope should comply with the corresponding configuration requirements, and there is no problem of broken strands and diameter reduction. Of course, the number of broken wires should not exceed the corresponding standard. His pulley movement is very flexible.


AachenTwo layers of hydraulic lifting cargo elevatorPublish Operation Guide



Today, the editor will talk about a series of safety devices and their uses on the guide rail hydraulic lifting platform.: High-pressure water abrasive derusting. Using the impact of high-pressure water jets and abrasives to polish and remove rust on the screw elevator, the advantage is that the damage to the material is small, but the water has certain damage to the electronic equipment and it is suitable for the detachable type of screw elevator.Before using the aerial work platform, it is necessary to confirm whether the outriggers are well supported, refer to the level beads on the equipment to judge and debug, and then proceed with the operation; the rollers and slideways confirm whether the roller slideways of the hydraulic lifting platform are dry, and if there is When drying the site, an appropriate amount of butter should be added to ensure the smoothness during operation and to avoid head-to-head wear between mechanical parts.Latest quotation,Guide rail lift (also known as freight elevator) is a non-scissor hydraulic lifting platform, which is mainly used in industrial plants, restaurants, warehouses, docks, workshops and other places that need to move goods vertically between high-rise buildings above the second floor. The low height is especially suitable for sites where the site is not suitable for digging pits. What problems do we need to pay attention to in these places where elevators are used?Precautions for using guide rail elevators Precautions for using guide rail elevators: It is strictly forbidden to overload, transport flammable and explosive products and other products.Use Hydraulic lifts are widely used in various industrial enterprises and production lines such as automobiles, containers, mold manufacturing,AachenElevating cargo elevator, wood processing, chemical filling, etc., to meet the lifting needs of different operating heights, and can be equipped with various table forms (such as balls, rollers Turntable, steering, tilting, telescopic), with various methods (separate, linkage, explosion-proof), with the characteristics of stable and accurate lifting, frequent starting, large load capacity, etc., effectively solving the difficulties of various lifting operations in industrial enterprises, so that Production operations freely. The professional elevator factory has advanced technology, strict testing, more affordable prices, and more discounts are in progress, welcome to consult.


AachenTwo layers of hydraulic lifting cargo elevatorPublish Operation Guide



The scissor-type fixed lifting platform is a kind of transportation and handling equipment for transporting goods from a certain height to another height. After the operation is completed, the platform is level with the ground,Prepare the foundation according to the foundation plan, pay attention to the alignment, leveling, and alignment to ensure the level of the foundation and various requirements for use.After the inspection, the elevator manufacturer reminds you to use a compressed air machine to dry all the electrical connection parts inside the head compartment, so as to avoid corrosion caused by moisture accumulation in the electrical connection parts.What is the new price of fixed lifts? Fixed lifts are currently very popular in the market. Due to different manufacturers, different materials, different rated loads, and different brand awareness, the prices are also different. The current price of fixed lifts produced in the domestic market: rated load - tons, height of meters, table size mm *mm the price is about - yuan; the rated load is - tons, the height is meters, the table size is mm*mm, the price is about yuan. Rated load, lift height, table size of each fixed liftDifferent. (Specific bearing capacity and rising height can be customized according to user requirements)Aachen,Correct construction elevator site inspection First of all,AachenHydraulic lifting cargo elevator, we need to check the foundation to see if there is any water accumulation, and check whether the grounding system meets the requirements. We also need to check how the structural bolts of the frame are fastened and whether there are any cracks in the welds. We need to follow the instructions to set it up. In mechanical transmission, it can be divided into two types: open type and closed type. Of course, the lift also has a lot of safety equipment.The hydraulic lifting platform is mainly the pressure transmission of hydraulic oil to realize the lifting function. Its scissor mechanical structure makes the lift stable, and the wide operating platform and high carrying capacity make the high-altitude operation wide and suitable for many people work at the same time. It makes high-altitude operations efficient and secure.Pay attention to check whether there are any broken wires and loose strands in the wire ropes of each part. If it exceeds the relevant regulations, it must be replaced immediately. The maintenance of the wire rope should be strictly in accordance with regulations.


comment list
©2009-2024Industrial Microblog  Sitemap