Guayabal de yateras, Rio de JaneiroSteel pipeworking principle
release time:2024-04-26 11:00:42

Special slings shall be used for the lifting of horizontal members such as laminated plates, and the stress at each lifting point shall be uniform to avoid fracture due to uneven stress of members. Grouting method is to put some solidified slurry into the cracks or pores of rock foundation in order to improve its physical and mechanical properties. Professional grouting pipe,Guayabal de yateras, Rio de JaneiroPrecision tube, steel flower pipe, advance small pipe, high-pressure grouting pipe, pipe shed pipe, grouting pipe factory, high price, on-site settlement and honest management! The purpose of grouting is to prevent seepage, stop leakage, strengthen and correct the deflection of buildings.Process flow: drill in place → Drilling → Mud injection → Run casing → Continue drilling → Slag removal → Hole cleaning → Hoist the reinforcement cage → Water jetting and bottom cleaning → Concrete conduit → Placing concrete → Catheter & rarr; The pile top reinforcement can be divided into single liquid silicification method, double liquid silicification method,Guayabal de yateras, Rio de JaneiroSteel pipe, aerated silicification method and electric double liquid silicification method.

Guayabal de yateras, it plays a guiding role in drilling. During grouting, it is used to install orifice closure device to prevent slurry leakage.A -m long orifice pipe is installed at the opening of the grouting hole to prevent possible hole collapse. At the same time, it plays a guiding role in drilling. During grouting, it is used to install orifice closure device to prevent slurry leakage.Guayabal de yateras, Rio de JaneiroSteel pipeworking principle,2024-04-2611:00:38Process flow: drill in place → Drilling → Mud injection → Run casing → Continue drilling → Slag removal → Hole cleaning → Hoist the reinforcement cage → Water jetting and bottom cleaning → Concrete conduit → Placing concrete → Catheter & rarr; The pile top reinforcement can be divided into single liquid silicification method,Guayabal de yateras, Rio de JaneiroSeamless pipe, double liquid silicification method, aerated silicification method and electric double liquid silicification method.The secondary grouting pipe can only be grouted once and cannot be reused.</p><p><p><img src=


The grouting mechanism includes filling grouting, infiltration grouting, compaction grouting and splitting grouting. Grouting materials include granular slurry and chemical slurry. Granular slurry is mainly cement slurry, and chemical slurry includes silicate (water glass) and high slurry. Silicification method, alkali solution method, high chemical grouting method and cement grouting method.Push the rock powder and sundries that are not washed, remain at the hole bottom, or stick to the hole wall out of the grouting range, so as to improve the bonding strength and impermeability between the slurry stone body and the fracture surface.Guayabal de yateras, Rio de Janeiro,Riohacha,● features: the grouting pipe is divided into secondary grouting pipe (ccll-y grouting pipe qdm-it grouting pipe, ccll-y full section grouting pipe) and repetitive grouting pipe (ccll-d grouting pipe, ccll-d full section grouting pipe)

comment list
©2009-2024Industrial Microblog  Sitemap