Macao6-meter aluminum alloy lifting platformVariables during tightening
release time:2024-05-10 20:08:36
MacaoMobile boarding bridge,

Lifting and loweringRegularly check all wires and cables for damage. Timely bandage and replace damaged parts.Macao,However, large welded structural components have the characteristics of complex morphology, large weight, large differences in residual stress size and distribution, and it is difficult to achieve good results using ordinary vibration aging technology. Therefore, it is crucial to develop a reasonable process. Therefore, they found Nanjing Juhang and our JH- vibration aging equipment, and requested us to develop a complete vibration aging process.Check all standard sections and diagonal support connection points. Check the fastening bolts of the gear rack and ensure that the motor cooling wing plate and organization are cleanAcharnes,Manganese steel is generally used as the primary profile for warehouse cargo elevators. In order to achieve better anti-corrosion effect, a layer of rust resistant primer is usually applied, which effectively blocks air and prevents premature corrosion of the steel. Below, Ruilong hydraulic press will explain the role of rust resistant primer.Check if the usage period of the speed limiter has expired. If it exceeds the usage period, it is necessary to send it to a qualified professional unit for inspection and calibration. What are the functions of the lifting stage device?The wear rate is fast, and due to factors such as processing, and adjustment of new machine components, the friction surface is rough, the mating surface area is small, and the surface pressure condition is uneven. During the operation of the machine, the concave and convex parts on the surface of the parts are intertwined and rubbed against each other. The metal debris that falls off from the grinding process, in turn, acts as abrasive and continues to participate in friction, further accelerating the wear of the mating surface of the parts. Therefore, during the running-in period, it is easy to cause wear on components (especially the mating surface), with a fast wear rate. At this point, if overloaded, it may cause damage to the components and lead to early failures.


Macao6-meter aluminum alloy lifting platformVariables during tightening



Please refer to the instruction manual for the maintenance and maintenance of the elevator to check the braking torque of the brakePower supply voltage: Motor power: Lifting: Rocker self reset switch operation Overload protection: Over current relay.How to maintain and maintain the stage? When using the lifting stage in daily life, there should be no dirt present, and any dirt must be washed off with gasoline or thinner. Pay attention to checking each steel wire rope for broken wires and loose strands. If it exceeds the relevant regulations, it must be replaced immediately. Professional elevator manufacturers have a complete range of products, welcome to inquireProcess inspection,Weekly maintenance: According to the operation instructions ensure that the elevator is inspected and smooth every dayQuarterly maintenance: Check the items checked each month  


Macao6-meter aluminum alloy lifting platformVariables during tightening



What are the functions of anti rust primer for warehouse cargo elevators?Market trend,Monthly maintenance: View weekly inspection itemsJinchuang lifting platform product feature is mainly used for high-altitude cargo transportation between floors. With a load capacity of - tons and a lifting height of - meters, a guide rail elevator, also known as a hydraulic elevator, can be installed indoors and outdoors. The lifting height is high and uses a side mounted oil cylinder, which runs smoothly, has low noise, is convenient for maintenance, and has a long service life. In case of power outage, which is safe, convenient, fast and practical. The pit depth is generally cm-cm, and the top layer height is not affected,MacaoSelf walking scissor fork lifting platform, The pump station can be customized according to the on-site environment, suitable for - floors of steel structures or concrete factories. Both the internal and external parts can be used. The pump station adopts a joint venture pump station and an imported pump station from Italy. If the speed requirement is too high, a joint venture customized pump station can be used to meet the ideal delivery requirements. The oil cylinder and seals are made of imported components, solving the problem of unstable oil pressure for customers, The oil leakage problem of components . The oil cylinder is built into the platform . The heavy-duty steel wire rope wheel or weighted special chain ensures safety . The automatic insurance during the lifting process ensures vehicle safety . The synchronous device during the lifting process ensures that the vehicle may not overturn . The alarm setting before falling to the ground ensures the safety of the operator . The chain or steel wire rope fracture protection device . The hydraulic system pressure loss explosion-proof protection device . The elevator special flat permanent magnet switch is selected, The leveling effect is good. . The distance between heavy and empty loads is small, and the leveling accuracy is high. . Standard elevator boards, LCD display call boxes, relevant wiring harnesses, and connectors are selected. Beautiful appearance, easy operation,MacaoOblique hanging obstacle free lifting platform, visual display of the position of the elevator car on the floor, wiring harness connected using connectors with automatic and manual options.With the continuous development of the economy, meeting the needs of society, and increasing productivity, hydraulic cargo elevators play an important role in high-altitude operations. Hydraulic cargo elevators operate up and down, and can provide us with a safe and stable platform. We can provide security for our safety when working at heights.Macao,The frequency conversion system circuit of the construction elevator is mainly composed of two parts: the main circuit and the circuit. The main circuit is mainly composed of a construction lifting cargo elevator (hereinafter referred to as the lifting cargo elevator) driven by a more complex rectifier. Before installation, all the eccentric roller shafts of the lifting cage and driving mechanism are loosened or adjusted to a large eccentricity. The lifting cage and driving mechanism are installed in the guide rail frame respectively, and the two are connected. Starting from adjusting the driving mechanism, power on the suspension cage to lift it m above the ground or detach it from the ground buffer spring (or support). The adjustment and sequence are as follows: . Use a special wrench to rotate the lower double (single) pendulum eccentric shaft to adjust the eccentricity to ensure that the installation plate surface of the driving mechanism is perpendicular to the horizontal plane, and ensure that the upper and lower pendulum wheels evenly guide the rails at the same time. Use your hand to move each wheel body and check if it evenly presses the rails; . Use a special wrench to rotate the eccentric shaft of the gear rack back pressure wheel to adjust the side clearance during gear rack meshing. When adjusting, use a feeler gauge to measure the side clearance to .; Between .mm, each pressing wheel should evenly press on the back of the rack. Move each wheel body by hand to check if it evenly presses against the tooth back. Similarly, adjust the guide rollers on both sides of the guide rail. The adjustment key is to adjust the guide wheel on one side of the guide rail to lightly press it onto the guide rail. When moving the wheel body by hand, it should be possible to rotate but there should be obvious obstruction; The roller on the other side should maintain a clearance of .-. ram with the guide rail; . Adjust the lifting cage according to the above and sequence. If the driving mechanism and the lifting cage are integrated into the lifting cargo elevator, the lifting cage should be adjusted according to the and sequence of adjusting the driving mechanism. Conduct a visual inspection of the operation of each roller, and use the lead pressing method and coloring method to check the meshing of the gear pair; Fine tune pairs of unsatisfactory parts. The key point is to carefully adjust the meshing status of the gear pair: when the spots shown in appear on the surface of the gear rack, it indicates that the driving mechanism is tilted towards the side of the guide rail. At this time, the lower swing wheel (single or double wheel) should be adjusted to move the lower part of the driving mechanism towards the direction of the guide rail until the area of the spots reaches more than % of the surface of the gear rack. The smaller the area, the easier it is to damage the gears and racks.The wear rate is fast, and due to factors such as processing, assembly, and adjustment of new machine components the friction surface is rough, the mating surface area is small, and the surface pressure condition is uneven. During the operation of the machine, the concave and convex parts on the surface of the parts are intertwined and rubbed against each other. The metal debris that falls off from the grinding process, acts as abrasive and continues to participate in friction, further accelerating the wear of the mating surface of the parts. Therefore, during the running-in period, it is easy to cause wear on components (especially the mating surface), with a fast wear rate. At this point, if overloaded it may cause damage to the components and lead to early failures.The cleaning oil for the hydraulic system must use hydraulic oil of the same brand as the system used, with an oil temperature between and ℃. Use a large flow rate to remove impurities from the system as much as possible. The hydraulic system needs to be cleaned repeatedly three times or more. After each cleaning, fully drain the system while the oil is hot.


comment list
  • Early childhood education equipment

    Yes, I hope to cooperate next time. Thank you boss~~ Fast delivery, Macao6-meter aluminum alloy lifting platform basically satisfied.

  • Jia Yao Wire Mesh Products Co., Ltd.

    The packaging Macao6-meter aluminum alloy lifting platform looks very good, the packaging is very careful, I believe the goods must be very good, thank you! Good value, huh, come again next time.

  • Kaiban Building Materials Liability Company

    After receiving the goods, I feel that the quality Macao6-meter aluminum alloy lifting platform is still relatively good, consistent with the seller’s description, very satisfied, the delivery speed i

  • Siyuan Technology Co., Ltd.

    Macao6-meter aluminum alloy lifting platform Not bad, the price is worth it, just right.

©2009-2024Industrial Microblog  Sitemap