UsikoponjiGrouting small conduit and advance anchor rodStorage technology
release time:2024-04-30 04:51:19
because the space in the grouting pipe restricts the lateral sliding and rolling of the soil particles inside

At the same time, the relative displacement trend or relative displacement also occurs between this part of soil particles and adjacent soil particles, resulting in friction. This friction force is generally called 'bite force' or 'lateral force resistance'. The 'surface friction' and 'bite force' make the slip and roll of soil particles under the force of the upper limit line at the location of the grouting pipe, and limit the lateral displacement of soil in the whole plane of the grouting pipe. The grouting pipe plays an important role in the key points of settlement. Therefore, it is reasonable to use the grouting pipe to treat the uneven settlement of fill excavation transition subgrade. This paper yzes the action mechanism of the grouting pipe according to its type and characteristics introduces the construction technology and process in the construction of preventing the reflection crack of the road surface, and proposes a new technology of sprinkling a layer of filler in the grouting pipe network when paving the surface course. As a kind of road reinforcement material, grouting pipe is widely used in road maintenance engineering because of its advantages of simple, fast construction and low investment.They shall be connected as a whole in the factory as far as possible. If it is necessary to connect on site due to manufacturing process, transportation conditions, etc., hot press vulcanization (grouting pipe) or welding (plastic grouting pipe) shall be used. The joint appearance shall be smooth and smooth, and the tensile strength shall not be less than % of the base metal. The so-called 'overlapping' without any treatment is absolutely not allowed. All kinds of cross connection points of grouting pipes shall be made of accessories produced by our new rubber products factory, so as to ensure that on-site connection is only carried out in straight sections during construction. Flexible material with sufficient deformation capacity and good adhesion with concrete.UsikoponjiPolymer chemical grouting method is applicable to reinforcement of sandy soil foundation, curtain grouting of dam foundation water stop and leakage stoppage of underground engineering, reinforcement of muddy interlayer of dam foundation and fault fracture zone. There are many varieties of polymer chemical pulp materials, including epoxy resin, acrylamide (propionate), polyurethane (cyanogen), lignin, etc. Acrylamide and polyurethane are commonly used in chemical grouting of foundation. Acrylamide pulp is composed of main agent acrylamide and various admixtures. The viscosity of the slurry is close to water, and it has good groutability. After the slurry solidifies, the gel is impermeable,UsikoponjiSupport small conduit, and has good durability and stability. This kind of slurry is widely used in seepage prevention grouting of fine rock cracks and medium fine sand layers and dynamic water leakage stoppage projects. This kind of pulp has certain toxicity and pollutes air and groundwater. The polyurethane slurry is mainly composed of polyisocyanate and polyether resin, and then mixed with various admixtures. After the slurry is poured into the formation, it reacts with water to form polyurethane foam, which can strengthen the foundation and prevent seepage and leakage. Polyurethane slurry can be divided into water-soluble and non-water-soluble. The water-soluble polyurethane can be miscible with water and react with water to form an aqueous gel; Water insoluble polyurethane can only be miscible with organic solvents. Polyurethane slurry has low viscosity, good groutability, high stone strength, safety and reliability, no pollution to the environment, simple operation and high economic benefits.Answer: Yes, it can be protected. The piston rod can be protected by adding plastic hoses or bellows within the travel range.Turmero,The glass fiber grouting pipe is a rigid product made of high-strength alkali free peeling fiber, which is made into a mesh base material through an internationally advanced fine knitting process and is surface coated. Unidirectional tensile plastic grouting pipe is a grouting pipe made of high-density polyethylene (HDPE) as raw material, plasticized and extruded plate, punched, heated and stretched extruded and pressed, and then punched with regular hole network, and then stretched longitudinally. In this process, the polymer is in a directional linear state and forms an oblong reticular integral structure with uniform distribution and high node strength. The tensile strength and rigidity of the grouting pipe are fully improved through the reorientation of the originally scattered chain molecules into a linear state by stretching.The small editor of prestressed machines and tools will lead you to understand the main connection methods between the drive device and the wellhead: the connection between the flange of the drive head of the electric oil pump and the parallel flange is the most widely used one at present. There is a flange at the lower part of the drive head, and the size matches the flange of the Christmas tree wellhead.The commonly used standard for grouting pipe is the inner diameter of -mm. The wall thickness of the pipe has little effect on the sound transmission, so there is generally no need to restrict the thickness of the pipe wall. However, from the perspective of saving steel consumption, it is OK if the pipe wall can bear the lateral pressure of new concrete, not necessarily the thicker the better.


UsikoponjiGrouting small conduit and advance anchor rodStorage technology



In recent years, there have been frequent natural disasters, earthquakes, fires,UsikoponjiHollow self-propelled anchor rod manufacturer, etc. we are so small in the face of natural disasters that we can only devote our efforts to normal prevention and post disaster rescue. The grouting pipe can reduce the damage caused by these natural disasters.Grouting pipe is an expert in road construction. It can connect the subgrade as a whole and improve the bearing capacity of the subgrade. When encountering natural disasters, the subgrade will not be greatly damaged due to natural disasters, so that we can save more people in the rescue work. The grouting pipe can also play a great role in slope protection. The use of the grouting pipe can well prevent the landslide of mountain soil and debris flow disasters. Through many years of practical experience, it has been proved that the roads that usually use the grouting pipe are far more than the same period of projects in terms of service life and quality. Thus reducing the casualty rate. Grouting pipe is a kind of excellent geosynthetics used for Pavement Reinforcement, old road reinforcement, subgrade reinforcement and soft soil foundation reinforcement. It has become an irreplaceable material in the application of asphalt pavement reflection crack treatment. This product is a semi-rigid product made of high-strength alkali free grouting pipe, and has excellent properties such as high temperature resistance, low cold resistance, aging resistance and corrosion resistance. It is widely used in asphalt pavement, cement pavement and subgrade reinforcement, railway subgrade, embankment slope protection, airport runway, or manually.The electric double fluid silicification method is suitable for strengthening soft clay foundation with permeability coefficient less than .m/d. The grouting pipe with holes is used as the anode, and the reinforcement or filter pipe driven into the soil layer is used as the cathode. The sodium silicate and calcium chloride solutions are pressed into the soil layer through the grouting pipe and supplied with direct current. Under the action of electroosmosis, the pore water diffuses from the anode to the cathode, and the solution flows from the anode to the cathode along with the movement of water, so that the grouting effect is improved. The reinforcement cost of this method is high, and it can only be used after it is confirmed to be effective by tests.The alkali solution method is to heat the sodium hydroxide solution (alkali solution) to ~ ℃ and pour it into the soil layer through the grouting pipe with holes under its own weight. When the content of calcium and magnesium ions in the soil is high (such as loess), the surface of the soil particles will be activated and self cemented, so as to improve the strength and water stability of the soil, which is called the single solution method; When the content of calcium and magnesium ions in the soil is less (such as general cohesive soil)The small editor of prestressed machines and tools will lead you to understand the main connection methods between the drive device and the wellhead: the connection between the flange of the drive head of the electric oil pump and the parallel flange is the most widely used one at present. There is a flange at the lower part of the drive head, and the size matches the flange of the Christmas tree wellhead.Inspection environment,In China, the types of grouting pipes are relatively complete now, from grouting pipes and grouting pipes for Reinforcing Subgrade to glass fiber grouting pipes for highway pavement to convex joint grouting pipes and plastic tensile grouting pipes for railway. For different road construction environments, different types of grouting pipes are selected, which can not only ensure the quality of the road but also save the cost. So what kind of application effect can the grouting pipe achieve in highway maintenance? The grouting pipe manufacturer will take you to have a look.The stability of the grouting pipe is one of the important factors to control the stability of the whole foundation pit. Its erection must be accurate and in place, and prestress must be applied in strict accordance with the design requirements. In particular, attention should be paid to the stability of the diagonal bracing. During the diagonal bracing operation, every link of the installation must be carefully operated. At the same time, the steel purlin must also ensure its stability, strength and deformation requirements during the production and installation process. In addition, During the whole construction process from foundation pit grouting pipe erection to removal, the grouting pipe must be strictly monitored to ensure its stability. How to improve the bearing capacity of piles with grouting pipes in bored piles, during the drilling process of large-diameter cast-in-place piles, the soil layer around the piles will become loose due to the agitation of the turning heads. In addition, the water immersion makes the soil layer that has started to loosen more loose. This problem can be effectively solved by grouting with grouting pipes. How to improve the bearing capacity of piles when grouting with grouting pipes?In limestone area, the punching is not good, and it is difficult to sink the reinforcement cage. When the grouting pipe is deformed and blocked by unconventional means, and even can not be detected. Therefore, when the grouting pipe is found blocked after the foundation pile is poured and before the inspection, effective measures should be taken to pass the pipe to ensure the smooth progress of ultrasonic inspection. Generally, flushing and pigging with high-pressure water, and using a drill with a small drill to clean the hole.


UsikoponjiGrouting small conduit and advance anchor rodStorage technology



Can the stretching speed of grouting pipe be defined?Welcome to inquire,In China,UsikoponjiSelf propelled hollow grouting anchor manufacturer, the types of grouting pipes are relatively complete now, from grouting pipes and grouting pipes for Reinforcing Subgrade to glass fiber grouting pipes for highway pavement, to convex joint grouting pipes and plastic tensile grouting pipes for railway. For different road construction environments different types of grouting pipes are selected, which can not only ensure the quality of the road but also save the cost. So what kind of application effect can the grouting pipe achieve in highway maintenance? The grouting pipe manufacturer will take you to have a look. When lifting and demoulding components, the concrete strength must meet the design requirements. When there are no special requirements in the design, the non prestressed members shall not be less than % of the designed standard value of concrete cube compressive strength, and the prestressed members shall not be less than % of the designed standard value of concrete cube compressive strength.In the construction of some grouting pipes, after the completion of the construction of the project, because some construction personnel did not take protective measures after the completion of the grouting pipes, the project was damaged due to some external factors. In order to help users effectively improve the construction quality of the grouting pipes, the following article introduces the protective measures that should be taken after the completion of the construction of the waterproof layer of the grouting pipes. For various engineering designs, waterproof and water stop shall be carried out throughout the whole process of grouting pipe until the backfilling soil is completed.Usikoponji,When the grouting pipe is laid, it shall be kept flat and tight without wrinkling, so that the grouting pipe has effective tension. After laying, it shall be rolled again with a clean steel wheel roller. Most urban roads use glass fiber grouting pipes with self-adhesive. The diameter of the glass fiber grouting pipe is . ~ times of the maximum particle size of the asphalt concrete surface aggregate. The ultimate tensile strength should be greater than kN / m, after the completion of the construction of the project, because some construction personnel did not take protective measures after the completion of the grouting pipes, the project was damaged due to some external factors. In order to help users effectively improve the construction quality of the grouting pipes, the following article introduces the protective measures that should be taken after the completion of the construction of the waterproof layer of the grouting pipes. For various engineering designs, waterproof and water stop shall be carried out throughout the whole process of grouting pipe until the backfilling soil is completed.The main elastic element of the grouting pipe is the stainless steel grouting pipe, which compensates the axial, lateral and angular direction of the pipe by the expansion and bending of the grouting pipe.


comment list
©2009-2024Industrial Microblog  Sitemap