EggerCangzhouMarket price quotation
release time:2024-04-26 21:23:48

When the door is closed, except for the gap between the lower part of the door that should not exceed mm, any through-hole and opening size related to the distance between any door and adjacent moving parts, as well as the gap around the door or the gap between parts should comply with the provisions of Table of GB -.After the electric elevator passes the inspection, the user unit shall organize the leasing unit, installation unit, and supervision unit to conduct acceptance. For the implementation of construction general contracting,EggerDijon, the acceptance shall be organized by the construction general contracting unit. The acceptance form should be signed by the relevant responsible person.Egger,The installation position of the lower limit switch. The installation position of the lower limit switch should ensure that the contact plate triggers the switch when the rated load of the suspension cage decreases, causing the suspension cage to stop. At this time, the contact plate should also be close to the triggering of the lower limit switchSteel wire ropes, pulleys, and counterweight steel wire ropes shall comply with the following regulations: the characteristics of steel wire ropes shall comply with the requirements of General Purpose Steel Wire Ropes GB/T; Maintenance, wear, deformation, and corrosion of steel wire ropesSanta Ana,Setting requirements: The landing door should be standardized and tooled.Work is essential, and the main protective accessories include safety belts, guardrails,EggerPoitiers, protective covers, platforms and stairs, etc.Secondly, the lifting platform is driven by electrical energy and lifted by the hydraulic system. During operation, it is necessary to avoid irregular operations. To ensure the normal and orderly operation of the lifting platform and achieve the ideal unloading level, it will take on the function of raising or lowering. In order to prevent the lift car from crashing or sinking, stage equipment should be dismantled with over travel switches that can cut off power and cannot be automatically reset, and installed in the machine room, rather than in the shaft; A buffer should be installed that can absorb the energy of the moving mechanism and reduce impact.Greater than .s; When the hydraulic buffer is used, the oil level shall be checked, and the action of the hydraulic buffer shall be monitored by the Electrical safety switch. When the hydraulic buffer is compressed, the cage shall notPrinciple of electric elevator rotary valve: When the electric elevator rises, the rotary valve will automatically open. To close the plug valve, it is necessary to first turn the handle to turn the plug to a degree position until it is closed, and then turn the transmission handwheel to lower the plug and achieve sealing.Design brandThe verticality of the guide rail frame should meet the requirements of the specifications.Then, the lifting platform platform platform that carries the load needs to be balanced, and no deviation of one side is allowed. The lifting of goods does not allow people to stand on both sides of the platform, and the lifting of goods should try to maintain a stable and uniform speed.It is reported that a fixed electric elevator has good lifting stability and can only be used for fixed operations, making high-altitude operations easier


EggerCangzhouMarket price quotation



The setting of the cable guide frame should comply with the user manual and regulatory requirements.Finance Department, we should observe whether there is any damage to the electric elevator. We can conduct a no-load test to raise and lower it. If there are any damaged parts,EggerMatsalka, they should be replaced in a timely manner to prevent major accidents.The full height landing door should meet the following requirements: the net height of the landing door opening should not be less than m. In special circumstances, when the net height of the building entrance is less than m, it is allowed to lower the height of the lower door opening, but in any case, the net height of the lower door opening is not less than m. (Article of GB-)Egger,Setting requirements: The main connection methods between the wall bracket and the building include: connecting the wall bracket with the embedded parts on the wall; Fix with wall bolts; Embedded bolts; Welding with steel structures.After the electric elevator passes the inspection the user unit shall organize the leasing unit, installation unit, and supervision unit to conduct acceptance. For the implementation of construction general contracting, the acceptance shall be organized by the construction general contracting unit. The acceptance form should be signed by the relevant responsible person.Then, the lifting platform platform platform that carries the load needs to be balanced, and no deviation of one side is allowed. The lifting of goods does not allow people to stand on both sides of the platform, and the lifting of goods should try to maintain a stable and uniform speed.


comment list
©2009-2024Industrial Microblog  Sitemap