San JoseAdvance small conduit in tunnel constructionApplication in light industry
release time:2023-01-16 06:57:47

The commonly used standard for grouting pipe is the inner diameter of -mm. The wall thickness of the pipe has little effect on the sound transmission, so there is generally no need to restrict the thickness of the pipe wall. However, from the perspective of saving steel consumption, it is OK if the pipe wall can bear the lateral pressure of new concrete, not necessarily the thicker the better. Grouting pipe at tensioning end: the grouting pipe installed at the end of the grouting pipe reinforcement and capable of tensioning is also called grouting pipe grouting pipe. The so-called grouting pipe is a grouting pipe in post tensioning structure or component to maintain the tension of the grouting pipe reinforcement and transmit it to the mixed tension; Fixed end grouting pipe: a grouting pipe installed at the end of the grouting pipe reinforcement and usually buried in the concrete without tensioning. The standard of the grouting pipe used for the grouting pipe reinforcement is the national standard of the people&#;s Republic of China (GB / T -, and is connected by clamp pressure connection, screw connection, flange connection and other methods. It has a reliable anti-seepage effect during concrete pouring. Two convex grooves are planned at the end of the bell end of the high-strength double seal clamp type acoustic measuring pipe, and the convex grooves are equipped with sealing rings. When installing the device, the socket end of the product is stabbed into the bell end by cm, and then the two convex grooves are kneaded together with special hydraulic pliers. The pipe at the kneaded part is shortened and deformed after being stressed, and the outer pipe between the two convex grooves is deeply immersed into the inner pipe, and then the reliable connection of the product is completed; After being kneaded, the rubber sealing ring deforms and fits between the two layers of pipes, playing an excellent double safety sealing effect.San Jose,Compared with the sleeve valve pipe grouting method, the common disadvantages of the grouting pipe grouting method, the flower pipe grouting method and the drill pipe grouting method are that the grouting is easy to overflow along the pipe wall and the grouting layering effect is poor. These disadvantages are particularly prominent when using the slurry with good fluidity and long initial setting time; Its advantages are simple equipment and process good flexibility, fast construction speed, and more suitable for situations requiring rapid response.A short section of screw end rod is welded on both ends of a single prestressed thick steel bar, and the nut and backing plate are sleeved to form the simplest grouting pipe. The pretension force is transmitted to the nut through the bearing force on the threaded slope of the screw end rod, and then to the concrete components around the reserved hole crossing through the base plate.Let&#;s take a look at the prestressed machines and tools. The small editor of prestressed machines and tools reminds everyone that the screw end rod is made of cold drawn or heat-treated reinforcement and the thread is fine teeth. The welding between the end rod and the prestressed reinforcement should be carried out before the cold drawing of the prestressed reinforcement. This grouting pipe can be used at the tensioning end and the fixed end. A general jack is used for tensioning, and the jack pull rod (with internal thread at the end) is tightened on the thread of the screw end rod for tensioning. After tensioning tighten the nut and anchor the rebar. The advantages of this grouting pipe are relatively simple, and when the jack returns oil after the grouting pipe, the prestressed reinforcement basically does not slide. If necessary, facilitate re tensioning. The disadvantage is that the accuracy of the length of prestressed reinforcement is high, and it cannot be too long or too short, otherwise the thread length is not enough.Shoprand,Disposal method: the grouting pipe shall be shortened according to the specification. The overhead type is a special rack installed at the bottom of the driving head and connected with the wellhead tensioning equipment. The cooperation Specification between the saddle profile on the horseshoe of the grouting pipe and the core is too low. When the outer mold and the horseshoe surface are fitted together, the gap is larger than the thickness of the pipe wall, that is, there is an active gap. Therefore, the Chengdu grouting pipe manufacturer kneads the pipe wall to form an 'eight' shaped wrinkle.


San JoseAdvance small conduit in tunnel constructionApplication in light industry



The bottom of the horseshoe of the grouting pipe is too low. After the horseshoe is seated in the mold, the space between the outer mold and the horseshoe surface is greater than the thickness of the pipe wall.Grouting parameters such as grouting pressure and reinforcement radius can be determined through field tests according to geological conditions and engineering requirements. Grouting holes are generally arranged in an equilateral triangle or rectangle on the plane. The reinforcement radius of collapsible loess is generally .-.m and the reinforcement depth is generally -m. The advantage of silicification method is that the grout has strong permeability and can quickly terminate the deformation of the foundation; It is non-toxic, does not pollute the environment, and is cheap, so it is widely used.?production costs,Grouting pipe grouting mainly improves the bearing capacity of piles from these two aspects Grouting is carried out through the grouting pipe embedded in the pile body. The slurry integrates the soil and slurry around the pile body through penetration, splitting and compaction, so as to improve the physical and mechanical properties of the bearing layer of the pile body Especially for the ballast at the bottom of the pile, grouting can improve or eliminate the adverse effect of the ballast at the bottom of the pile on the end bearing capacity through the replacement, there will be a certain gap between the pile retaining wall and the surrounding soil layer,San JoseCustomized leading small catheter, which will lead to the decrease of the pile side friction and affect the bearing capacity of the pile When the grouting pipe is used at the pile end for grouting, the slurry will permeate, fill and compact along the side of the pile under the pressure, so as to complete the replacement of the mud skin around the pile and the filling of the gap, such as greatly improving the pile side friction resistanceWhen the grouting pipe is installed, the axis deviation shall be ≤ cm, bolts must be installed symmetrically and tightened in sequence. Meanwhile, in order to prevent excessive deflection of the grouting pipes when axial force is applied, the deflection must be corrected to the horizontal before axial force is applied.Appropriate measures shall be taken to prevent surface water, curing water and garbage from falling in. When necessary, a sump shall be set near the post cast strip of the base plate in combination with the design of the basement plane drainage system to facilitate the final cleaning before the grouting pipe is cast. When advance water stop is not used, a sump shall be set which can be set in the basement according to the above method, or set outdoors as a temporary facility. Usually, we use the waterproof scheme between the grouting pipe and the water surface or before, and there are many methods for the grouting pipe to stop water in advance. It should be noted that the design unit should participate in the review of the construction organization design of the basement, so as to determine a complete implementation scheme of advanced water stop before the excavation of the foundation pit and the pouring of the cushion. Otherwise, the design modification requirements will be put forward only when problems are found in advance water stop during construction, which will affect the integrity and rationality of the whole water stop scheme.


San JoseAdvance small conduit in tunnel constructionApplication in light industry



General treatment method: first, yze what causes the pipe blockage. For the pipe blockage of hard objects, you can poke with steel bars according to the depth, or bind a slightly thicker steel bar with steel wire rope. For the pipe blockage of soft objects, you can use the air compressor pipe to open the air compressor for blowing. Be sure to note that the water in the pipe may rush up like a fountain to pour water all over you! If it is slurry leakage and pipe plugging, there is no way to open it. We can only communicate with the testing personnel to change a testing method, such as low strain and core drilling method! Other uses of the grouting pipe: in addition to being used as a detection channel and replacing part of the reinforcement section, the grouting pipe can also be used as a pipe for grouting at the bottom of the pile. Experiments have proved that the bearing capacity of the cast-in-place pile treated with the grouting at the bottom of the pile can be greatly improved. At the same time, the grouting pipe can also be used as a channel for the defect washing and grouting treatment of the accident pile. At this time, it is necessary to take measures to punch through the pipe at the defective part to be grouted. Grouting pipe is specialized in the production of grouting pipe (ultrasonic detection pipe) for bridge pile foundation inspection. The product conforms to the industrial standard steel thin-walled grouting pipe for concrete cast-in-place pile and its use requirements (JT / T -, which was tried out by the Ministry of communications of the people&#;s Republic of China on April , It can not only meet the requirements of the standard, but also greatly improve each index, and obtain the inspection report of Hebei Road and Bridge Inspection Center.Safety production, Glass fiber grouting pipe is a semi-rigid product made of glass fiber as raw material, and fiber filament coated on both sides.The disposable grouting pipe uses steel springs as the supporting framework, and is wrapped with a layer of non-woven filter cloth. The outermost layer is wrapped with nylon mesh, and can only be grouted once.When the pipe cannot be connected due to serious blockage, the following treatment principles must be followed: when it is the first pile of a certain bridge, core drilling detection must be carried out; when it is not the first pile of a certain bridge, the construction unit shall apply for changing the detection method The low strain reflection wave method or high strain strain strain measurement method shall be used and signed by the supervisor&#;s representative and the person in charge of quality supervision before implementation; In case of pipe blockage of a bridge for many times,San JoseTunnel combined hollow anchor manufacturer,San JoseSmall conduit manufacturer, The wellhead clamp head is connected to the lower clamp head of the drive head. Some driving of grouting pipe. Sometimes the grouting pipe is overlaid on the two sides of the horseshoe surface. Adjust the cooperation specifications of the grouting pipe at the distribution nozzle. How to avoid grout leakage during installation of grouting pipe?There are many forms of grouting pipes that can be improved and applied. Although the engineering pipeline system is very complex, any complex pipe system can be divided into several relatively simple individual pipe sections through the setting of fixed pipe racks. When selecting the corrugated grouting pipe, the deformation compensation of the pipe system can be determined according to these relatively simple pipe sections, so as to select the grouting pipe.


comment list
  • de machinery co., ltd.

    You San JoseAdvance small conduit in tunnel construction are okay, give a discount next time you buy, and buy your company's San JoseAdvance small conduit in tunnel construction

  • New catalytic materials

    I really like it, I am very supportive, the quality is very good, exactly the same as described in San JoseAdvance small conduit in tunnel construction, I am very satisfied, I really like it, complete

  • Ji Energy Mining Trading Company

    Old acquaintances, things are as good as always, genuine San JoseAdvance small conduit in tunnel construction, outstanding cost performance

  • edible oil processing

    San JoseAdvance small conduit in tunnel construction Very good, good quality and low price, express delivery is also fast, and inspection is also very standard.

  • Baxin Trading Company

    San JoseAdvance small conduit in tunnel constructionYes, give you a good comment

  • Technical consultation and transfer

    Let me evaluate this San JoseAdvance small conduit in tunnel construction, the price is good, the quality is good, the delivery is good, and the boss is good.

©2009-2024Industrial Microblog  Sitemap