Karlovo Model of power transformerMain materials for industry construction
release time:2024-03-28 18:03:22
Karlovo Overload capacity and time of oil immersed transformer,

& ldquo; of wiring transformer; Enter & rdquo; And & ldquo; Output & rdquo; Use a megger to test the grounding resistance between the terminal and the ground wire. When accurately measured by V megger, the resistance value exceeds m ohm bus.The power transformer is composed of two or more electromagnetic coils wound around the same transformer core. The winding resistance is connected according to the alternating electromagnetic field and works according to the basic principle of magnetic effect of current. The installation position of power transformer shall be considered to be conducive to operation, maintenance and transportation, and a reliable area shall be selected at the same time. The rated capacity of the transformer must be effectively used when applying the transformer.Karlovo ,The fundamental reason for this kind of inaccuracy is that when the transformer & ldquo; Dalar trolley & rdquo; is considered according to the size of capacity utilization rate, the high-capacity transformer must be replaced by the small-capacity transformer with high utilization rate, and then the iron loss is considered and the copper loss is ignored. In fact, for a certain load, the active power loss of small capacity exceeds that of large capacity The active power loss of the transformer, so it consumes electromagnetic energy.The sampling container is a colorless glass bottle with a wide mouth ground glass plug with a volume of .kg or kg. - bottles shall be collected at a time for analysis and experiment. Labels shall be attached during sampling. Pay attention to the name, source, sampling person,Karlovo On load voltage regulating power transformer, weather conditions and other materials of the oil sample.Al QuraynIn fact, ground wire is not only a kind of grounding protection. The following describes in detail that ground wire is the general name of grounding system. Ground wire is divided into protective grounding and safety factor grounding device. Among them, safety factor grounding device can be divided into grounding protection, anti electric shock grounding device and anti electromagnetic wave radiation grounding device. Protective grounding is to use it for loop to make the facilities achieve the grounding wire specified by the function.The heat discharge pipe of heat pipe radiator is generally made of slotted seamless steel pipe after flattening by stamping die. When the heat discharge pipe is bent and welded by electric welding, oil leakage is often caused. This is due to the supporting force on the surface of the pipe and the working pressure on the inner cavity when stamping the heat discharge pipe.After no-load test run is normal for h, it can be transferred to on-load operation, and the load shall be gradually increased from %, % and % by grade.


Karlovo Model of power transformerMain materials for industry construction



Oil leakage of cast iron partsIn fact,Karlovo Difference between box transformer and transformer, apart from the application of the Finance Bureau, the industry has been trying to formulate and upgrade transformer commodities according to the specifications, so as to promote the improvement of energy consumption level of transformer commodities.When we apply oil immersed transformer, we all know that it works with the help of oil. What if the oil immersed transformer is on fire? What countermeasures should we do?production costs,When leaving the factory, the production and processing are not smooth and the sealing is poor. The common fault of oil leakage will be caused after the oil transformer is sealed for a period of time.(III) dry type transformers of KVA and below can be installed on poles. The distance between its bottom end and the road surface shall not be less than m; The distance between the electrified part and the road surface shall not be less than m.The insulating layer in the middle of the silicon steel plate is aging, the anchor bolt cover with the iron core is damaged, resulting in heat, temperature rise, and the aging of the insulating layer is accelerated. The core insulation compressive strength of power transformer must be measured on time and accurately. If it is found that the insulation compressive strength is less than the index value, please remove and replace the anchor bolt cover or carry out insulation for the copper core cable.


Karlovo Model of power transformerMain materials for industry construction



On load commissioning:Industry management,The method and whole process of taking oil sample of power transformer are as follows:Relevant responsible persons of the transformer Federation of China Household Appliance Industry Association show that the development prospect of transformers in China in the future is still the development trend of environmental protection, low noise, fire safety and explosion-proof and high reliability. There are two key development prospects: one is the development trend of high voltage and high voltage, and the latter key is applied to the substation project route in big cities.If the volume of power transformer is too small energy conservation and miniaturization. The former key is applied to the long-distance substation project route, the transformer will be overloaded for a long time and it is easy to destroy machinery and equipment. Therefore, the rated capacity of the transformer should be selected according to the power consumption, which is not suitable for too large or too small.Karlovo How to reduce the failure of dry-type transformer?The flange surface is uneven, the tightening bolts are loose, and the installation and processing process is wrong, so that the bolts are not tightened well, resulting in oil leakage.Gradually, high-frequency vibration damping mechanical equipment, such as low-frequency vibration damping platform, is installed at the bottom of the dry-type transformer, which can reduce the downward dispersion of the vibration of the dry-type transformer. Then replace the connection between the dry-type transformer and the surrounding engineering buildings, roads, etc. with flexible connection, or use elastic yellow shock absorption mechanical equipment to prevent the vibration from spreading according to the rigid connection. If possible, the dry-type transformer room can also be soundproofed and decorated, and sound-absorbing plates and silencing shutters can be used to improve the soundproofing capacity of the dry-type transformer room.

comment list
  • kai tong plastic products co., ltd.

    Karlovo Model of power transformerHow is the quality? Do you have it in stock?

  • Changyou Manufacturing Service Liability Company

    It is still affordable to buy things online, Karlovo Model of power transformer I signed for two days late, but the things are really good, and the boss is good. The speed of transportation is also ve

  • Lime and Gypsum Manufacturing

    Support each other! Seeing you Karlovo Model of power transformer, we are preparing to place an order and hope to ship on time.

  • railway accessories

    Your company Karlovo Model of power transformer has a very good service attitude, thank you, and like you.

  • car sales

    Karlovo Model of power transformer Arrived, yes, this new model is indeed up to standard, very good

  • Baimiaozi Foundry Company

    Since searching and shopping online, you never have to go out and wander around. Your Karlovo Model of power transformer quality is guaranteed, logistics and delivery are fast, big brands are better t

©2009-2024Industrial Microblog  Sitemap