New OrleansDuplex villas stacked with household elevatorsPursue a diversified industry model
release time:2024-04-25 23:10:54

The shaft for updating the old elevator: The measurement of the shaft for the old elevator is the same as the shaft that has just been constructed. When the old elevator is not yet in use, try to obtain relevant data outside the shaft, such as the size of the machine room, floor height, and net size of the door opening. There are two situations when the old elevator is not yet in use: a. When the old elevator can start: in this case, paying attention to recording the pit size and the wall structure of the first floor, such as whether the hall door is centered, whether there are special structures on the shaft wall, the spacing between ring beams, and the position of embedded parts. Then, the measuring personnel and elevator technicians take the elevator to the top floor. After measuring the machine room, the measuring personnel, go up to the car roof and start the elevator at a maintenance speed. When the car roof is slightly lower than the sill of the second floor hall door, the parking lot stops. During this process, the measuring personnel observe and measure the full travel of the shaft from the top floor, mainly the height of the floor, while recording the measurement (safety must be paid attention to, and special attention should be paid to moving parts such as counterweights and wire ropes).Attention: The elevator consists of two main parts: mechanical and electrical. If the elevator is not maintained on a daily basis its safety cannot be guaranteed. If the elevator needs to be refueled without refueling, it will cause wear and tear on the mechanical components of the elevator, greatly shortening its service life and preventing normal use of the elevator.New Orleans,. Different types of civil engineering traction elevators, screw elevators and hydraulic elevators have different requirements for civil engineering. Common traction elevators require a certain amount of hoistway space, which can be made of concrete, steel structure hoistways, and glass curtain walls to create sightseeing elevators; The depth of the pit should be at least cm or more; Additionally, there are certain requirements for the height of the top floor.When the normal power supply is cut off,New OrleansAluminum alloy mast type lifting platform, the lighting inside the non fire elevator has no power, while there is still lighting inside the fire elevator.Souk Ahras,The effective support width of the upper and lower support beams should be greater than the width of the escalator truss, and there should be embedded steel plates.During the use of elevators, even the responsible unit cannot be found. If the maintenance is carried out by elevator manufacturers or qualified professional companies, on the one hand, the maintenance technology and quality are guaranteed, and on the other hand, if any problems occur, someone is also responsible.The effective support width of the upper and lower support beams should be greater than the width of the escalator truss, and there should be embedded steel plates.


New OrleansDuplex villas stacked with household elevatorsPursue a diversified industry model



The basic content of escalator shaft measurement is to measure the lifting height. The same as measuring the height of a straight ladder, the lifting height of a ladder is the vertical distance between the finished ground at the upper and lower support beams. When using the suspension line method to measure attention should be paid to whether there is a drop between the positioning point of the line drop and the decoration surface of the lower support beam of the ladder.Will the elevator quickly fall during a power outage& mdash;& mdash; Some movies and TV dramas often mislead the public into thinking that if the elevator loses its power, it will lose control and engage in falling movements.The requirement for the shaft is that it should not be plastered, which is beneficial for reducing noise, but there should be no protruding foreign objects.Good reputation,Measurement of elevator shafts in new construction projects under different on-site conditions: When the building design is not yet completed, the operator only needs to provide the user with the standard elevator layout of the required elevator specifications, and the user entrusts the design department to design the elevator shaft. When the architectural design has been completed, and the site has not yet been constructed, is under construction, or has been completed, it must be determined based on the current construction or measured dimensions. If the original civil design of the shaft needs to be modified,New OrleansNew type of small elevator for household villas, the user should entrust the architectural design department to make the shaft design modification based on the layout provided by the elevator.Tower style residential buildings above; Residential units and corridors with twelve or more floors; Other Class II public buildings with a building height exceeding meters; High rise buildings with elevators exceeding meters in height; The functional fire elevator has a front room. The area of the independent fire elevator front room is: the front room area of the residential building is greater than square meters; The front room area of public buildings and high-rise factory (warehouse) buildings is greater than square meters. When the front room of the fire elevator is shared with the smoke proof staircase, its area is: the area of the shared front room in residential buildings is greater than square meters, and the area of the shared front room in public buildings and high-rise factory (warehouse) buildings is greater than square meters.When the normal power supply is cut off, the lighting inside the non fire elevator has no power, while there is still lighting inside the fire elevator.


New OrleansDuplex villas stacked with household elevatorsPursue a diversified industry model



Measure the beam edge distance between the upper and lower support beams. The measurement is to suspend the line from the upper support point to the ground for positioning, and then measure the horizontal distance from the positioning point to the edge of the lower support beam.target,The beam edge distance is too small: The method of shortening the lower platform is to shorten the total length of the escalator,New OrleansSelf propelled aluminum alloy elevator, but note that the range of shortening is very limited, generally not exceeding mm. Generally, the platform cannot be shortened because it contains equipment such as cabinets and motors. Change the angle of the escalator from degrees to degreesMine elevators are used for transporting personnel and goods in mines. Special elevators are designed for special environmental conditions, such as explosion-proof, anti-corrosion, and heat-resistant elevatorsElectrical safety. Faulty elevators have multiple safety devices, but there are also many places where problems can occur. Some people have been caught due to abnormal door opening and closing, while others have encountered situations where elevator buttons malfunction and the display screen is black, making it difficult to see the floor clearly. Some have experienced the danger of falling straight several floors. Although there may not have been any personal injury taking the elevator is not about finding or acting in a movie. The real life is disturbed by the frequent elevator accidents, which make my heart feel uneasyNew Orleans,The beam edge distance is too small: The method of shortening the lower platform is to shorten the total length of the escalator, but note that the range of shortening is very limited, generally not exceeding mm. Generally, the platform cannot be shortened because it contains equipment such as cabinets and motors. Change the angle of the escalator from degrees to degreesMeasure the beam edge distance between the upper and lower support beams. The measurement is to suspend the line from the upper support point to the ground for positioning, and then measure the horizontal distance from the positioning point to the edge of the lower support beam.The requirement for the shaft is that it should not be plastered, which is beneficial for reducing noise, but there should be no protruding foreign objects.


comment list
©2009-2024Industrial Microblog  Sitemap