QinghaiElectric cargo elevatorLevel optimization measures
release time:2024-06-24 22:26:15

Stage equipment safety door. To prevent personnel from extending their heads, hands, and feet out of the shaft and objects from falling into the vertical shaft. Its vertical position should be closed,QinghaiElectric tripod elevator, its cabin should be full of doors, and the height of the hoistway (hall door) should not be less than meters; The electric door opening and closing switches should be removed from the vertical and passenger compartment doors. In order to prevent accidents caused by vertical, passenger car doors, and car roof doors not being closed.; Door interlocks should be installed on both the vertical and passenger compartment doors.The net height of the landing door opening should not be less than m, and the difference between the net width and the outlet width of the cage door should not exceed mm. When the floor door is closed, the size of any through-hole and opening related to the distance between any door and adjacent moving parts, as well as the gap around the door or between parts, should comply with the provisions of Table of 'Mechanical Safety - Safety Distance to Prevent Upper and Lower Limbs from Touching Dangerous Areas' GB-.Qinghai,The body in the lateral adjustment device of the driving plate should ensure a compressed state, so that the gear has a certain radial constraint, and ensure that the gear and rack always mesh well throughout the entire operation.Many theaters use a lifting platform as a vertical transportation tool for goods. The rear of the main stage or the end of the side stage in many theaters are equipped with a set container transportation lifting platform, etc.Berrechid,The scaffolding of the parking platform should be laid tightly and firmly.Setting requirements: For construction electric elevators that operate in multiple shifts, the handover system should be implemented, and drivers should fill out the handover record form according to the standard requirements. The driver should conduct a pre shift inspection and confirm that there are no errors before starting the machine for operation.The spacing between wall brackets and the height of guide rails above the high attachment point should comply with the requirements of the user manual.


QinghaiElectric cargo elevatorLevel optimization measures



The safety bulletin board for construction electric elevators should be hung at the protective shed of the electric elevator, with a size of meters by meters.In addition to fixed modes, there are also types of car mounted mobile devices. As the name suggests, this type of lifting device is a combination of lifting equipment and car mounted systems. It is very flexible to move, and of course, it is better to use it. For example, there are such lifting devices in airports, and car stations or sports stadiums may also be equipped with such devices, as they can be moved, So the scope of the operation is not limited to a specific place, but can be used wherever lifting operations are required. For example, when installing outdoor advertisements,QinghaiFixed electric hydraulic elevator,QinghaiElectric barrier free elevator, some advertisements are relatively high in height. At this time, mobile lifting equipment can be used to transport billboards or staff to the designated height for work. This type of equipment can also be divided into two types based on the driving mode: hydraulic lifting and electric lifting. The so-called hydraulic lifting is the use of hydraulic oil to drive and reach a specified height. The electric mode is driven by a motor or teeth to lift to a certain height. However, currently, hydraulic lifting platforms are more widely used.During the use period, the user unit should organize professional technical personnel to inspect the construction electric elevator monthly according to the standard requirements, and record the inspection results.Scheme customization,Setting requirements: For construction electric elevators with foundations installed on roof slabs, floors, or other lower suspended structures, the bearing capacity of the foundation support structure should be checked. Click here to download the construction technical information for free. Basic drainage facilities should be installed.Speed limit wire rope switch. When the speed limit wire rope trips or breaks. Make the electric elevator unable to start.The safety bulletin board for construction electric elevators should be hung at the protective shed of the electric elevator, with a size of meters by meters.


QinghaiElectric cargo elevatorLevel optimization measures



The motor of the hydraulic guide rail lifting platform is set around the wellbore, occupying a relatively small area improving the utilization rate of the wellbore area.Credit guarantee,The function of the lifting platform in a theater is roughly as follows: the main lifting platform arranged in the main performance area of the stage is mainly used to quickly change the scenery. Typically, with&quo; Product; In the music and dance theater stage arranged in a zigzag pattern, the lifting platform, side car platform, rail type and scissor type (curved arm type) to distinguish between overload or equipment malfunction. Fixed types include: scissor lift cargo elevator, chain electric elevator, and installationHigh lifting height, using side mounted oil cylinders, stable operation noise free, easy maintenance and longer service life.Qinghai,Model Example: Hanging Cage Specification: LABSC/TDx Type I: ~ Type II: ~ Type V: ~ Technical Requirements: The load-bearing capacity of the foundation should be greater than P: P=(hanging cage weight+outer cage weight+total weight of guide rail frame+counterweight+load) x. (kN).The entrance of each landing platform must be equipped with a landing door, which must open towards the landing platform side, and the door bolt must be set on the side next to the construction electric elevator.Model Example: Hanging Cage Specification: LABSC/TDx Type I: ~ Type II: ~ Type V: ~ Technical Requirements: The load-bearing capacity of the foundation should be greater than P: P=(hanging cage weight+outer cage weight+total weight of guide rail frame+counterweight+load) x. (kN).


comment list
©2009-2024Industrial Microblog  Sitemap