GroningenKasselThe following issues should be paid attention to during the construction process
release time:2024-04-25 20:47:15

Before operating the construction electric elevator, routine inspections should be carried out according to regulations and inspection records should be filled out.Steel wire ropes, pulleys, and counterweight steel wire ropes shall comply with the following regulations: the characteristics of steel wire ropes shall comply with the requirements of General Purpose Steel Wire Ropes GB/T; Maintenance, wear, deformation, and corrosion of steel wire ropesGroningen,Is the water cooling and air cooling of the hydraulic station the same?The net height of the landing door opening should not be less than m, and the difference between the net width and the outlet width of the cage door should not exceed mm. When the floor door is closed, except for the gap between the lower part of the door that should not exceed mm, the size of any through-hole and opening related to the distance between any door and adjacent moving parts as well as the gap around the door or between parts, should comply with the provisions of Table of 'Mechanical Safety - Safety Distance to Prevent Upper and Lower Limbs from Touching Dangerous Areas' GB-.Penaflor,GroningenBusgow Freiburg,Especially suitable for steel structured factories, suitable for both indoor and outdoor installation.To meet the needs of stage craftsmanship and layout; Product; In the music and dance theater stage arranged in a zigzag pattern, left, and right of the main stage lifting platform. The side and rear auxiliary lifting platforms are used for the smooth opening of the side platform and rear vehicle turntable, while the front auxiliary lifting platform is used to place the rear vehicle turntable near the platform entrance. The leveling and lifting platform below the side platform and rear vehicle turntable can be used to level the platform after the side platform or rear vehicle turntable is driven out, so that the entire platform does not have a height difference, ensuring the safety of the cast members.Drainage measures need to be considered around the foundation. (Drain the accumulated water on the foundation).


GroningenKasselThe following issues should be paid attention to during the construction process



The distance between the electric hoist and overhead line in Electrical safety construction shall meet the specification requirements, otherwise protective measures shall be taken.Setting requirements: Buffers should be installed below the suspension cage and counterweight running channel.News Abstract: The development of the lifting platform industry will continue to grow in recent years! With the continuous development of electric lifting machinery for high-altitude operations in recent years, the products of electric lifting platform vehicles have been continuously improved, and various new technologies and materials have emerged, making the further development of lifting platform vehicles possible.agent,The advantages and disadvantages of several commonly used electric lifting mechanisms are as follows: hydraulic electric lifting mechanisms: using hydraulic technology, smooth lifting and low noise.When the door is closed, except for the gap between the lower part of the door that should not exceed mm, any through-hole and opening size related to the distance between any door and adjacent moving parts, as well as the gap around the door or the gap between parts, should comply with the provisions of Table of GB -.Secondly, the lifting platform is driven by electrical energy and lifted by the hydraulic system. During operation, it is necessary to avoid irregular operations. To ensure the normal and orderly operation of the lifting platform and achieve the ideal unloading level, resulting in a safety clamp. To prevent breakage of the lifting wire rope. A safety clamp that can simultaneously cut off the power supply and stop the car from falling should be removed from the car. A car without safety tongs is not allowed to ride or carry people. If it is a simple electric elevator, there should be a safety device (such as a safety stop pin) to prevent people from suddenly falling when loading and unloading goods in the car; Electric elevators with three or more floors (including three floors) for passengers or passengers.Create brilliance,To ensure safe and reliable braking of the lifting platform and prevent accidents a hydraulic control one-way valve, also known as a hydraulic lock,GroningenPoitiers, is added to ensure safe self-locking in the event of an accidental rupture of the hydraulic pipeline. An overload sound control alarm has been installed to distinguish between overload or equipment failure. Electrical system explosion-proof button SB&flash; The rotation of the SB motor and the commutation of the explosion-proof electromagnetic directional valve are used to maintain load increase or decrease, and; Program adjustment time delay to avoid frequent movement of electric elevators that may affect their service life.The coaxiality between the motor shaft and the worm shaft in the aluminum alloy electric elevator drive device should be less than .mm, and there should be a mm gap at the shaft end to ensure that the motor bearings bear reasonable loads and reduce motor operating noise; electricSpiral electric lifting mechanism: With all the functions of a regular lifting platform, the main feature is that the equipment occupies a small foundation pit and has a large stroke. The equipment has a height of only -mm and a travel distance of up to m. It is particularly suitable for buildings with stages built on two or more floors due to space constraints.GroningenBefore installation,GroningenGreensboro, the installation unit should confirm that the foundation, foundation bearing capacity, embedded parts, and foundation drainage measures of the installed construction electric elevator and auxiliary heavy equipment comply with the requirements of the special construction plan for the installation and dismantling of the construction electric elevator based on the construction electric elevator foundation acceptance form, concealed engineering acceptance form, and concrete strength report.Protective measures should comply with regulatory requirements.The verticality of the guide rail frame should meet the requirements of the specifications.


comment list
©2009-2024Industrial Microblog  Sitemap