Banda AcehSteel pipeIt is difficult to be optimistic after the price reduction tide continues
release time:2024-03-19 17:46:05

Repetitive grouting pipe can be reused for many times. Long term grouting steel flower pipe, steel flower pipe grouting, pile foundation grouting pipe, grouting pipe manufacturer, old brand, price advantage and quality! Each time it is used up, which can close the upper part of the grouting section. The main construction steps are as follows: the grouting hole is drilled by a rotary drill. All grouting holes in the rock stratum are required to be drilled by coring in order to find out the and distribution of rock stratum fractures. The coring rate shall reach ~ % in the rock stratum and % in the broken rock stratum. The drilling cleaning fluid is mainly clean water. If the rock is broken and the hole collapse is serious, thin mud slurry can also be used as circulating fluid.Push the rock powder and sundries that are not washed, remain at the hole bottom, or stick to the hole wall out of the grouting range,2024-03-1917:46:05Special slings shall be used for the lifting of horizontal members such as laminated plates,Banda AcehSteel pipe, and the stress at each lifting point shall be uniform to avoid fracture due to uneven stress of members. Grouting method is to put some solidified slurry into the cracks or pores of rock foundation in order to improve its physical and mechanical properties. Professional grouting pipe, steel flower pipe, advance small pipe, high-pressure grouting pipe, pipe shed pipe, grouting pipe factory, high price, service, on-site settlement and honest management! The purpose of grouting is to prevent seepage, stop leakage, strengthen and correct the deflection of buildings.The secondary grouting pipe can only be grouted once and cannot be reused.

Banda AcehSteel pipeIt is difficult to be optimistic after the price reduction tide continues


● specification: inner diameter of secondary grouting pipe: mm; Outer diameter: mm; Inner diameter tolerance: & plusmn; .mm; Length of each roll: m.According to the measured water absorption of the borehole, verify the water permeability of the rock stratum and provide professional quality assurance for grouting pipe, steel flower pipe,Banda AcehSeamless pipe, advance small conduit, high-pressure grouting pipe,Banda AcehGrouting pipe, pipe shed pipe and grouting pipe factory. During the preferential activities, new and old customers are welcome to consult to determine the grouting pressure and flow, and determine the grouting slurry and its initial concentration.Banda AcehDande,● features: the grouting pipe is divided into secondary grouting pipe (ccll-y grouting pipe, qdm-it grouting pipe, ccll-y full section grouting pipe) and repetitive grouting pipe (ccll-d grouting pipe, ccll-d full section grouting pipe)

comment list
©2009-2024Industrial Microblog  Sitemap