Hi! this isTransformer Plant'S microblog, immediately open and listen to his latest developments!

Industrial MicroblogWhether it is called Weibo or sticky notes, these small voices recorded here will become unforgettable memories. Here, you can send messages anytime, anywhere through mobile phones, web pages, etc., and see friends all the time. attentionTransformer PlantThe latest news.

Transformer Plant(@122HP117294921)
User offline

http://www.ilovebotdf.com/?122HP117294921

male,山东省 济南市

86 18954493693

  1. ProyestiCooling mode of power transformerWhat maintenance is needed on weekdays

    Dry type transformer factoryWhen the transformer is put into operation, if the tap changer is not in time a great & ldquo; Tweet & rdquo; The high-voltage fuse is broken when the noise is serious; If the tap changer is defective, it is likely to burn the circuit breaker of the tap changer. In case of such situation once the load increases, power off immediately for maintenance.Proyesti,Protection mode for type selection of dry-type test transformerFault judgment of power transformerBacau,What about oil immersed transformer fire?The dry-type transformer is composed of two winding resistances, resulting in four wiring groups: & ldquo; y, Y & rdquo;, & ldquo; D,ProyestiDistribution transformer core, Y & rdquo;, & ldquo; y, D & rdquo; and & ldquo; D, D & rdquo;. In China, only & ldquo; y, Y & rdquo; and & ldquo; y, D & rdquo; are selected. Because there are also two types of Y-connection with neutral line and without neutral line. If there is no neutral line, it will not be upgraded. All marks show that with neutral line, it will not be upgraded The letter N after the English letter Y indicates that the neutral line has transformer grounding wire. Yn wiring group, when UAB and UAB overlap, the minute hand points to . & ldquo; & rdquo; in the new wiring group it is indicated by & ldquo; & rdquo.The time difference between different steps of three-phase power switch of switching power supply shall be less than ms, the closing shall be maintained by high-voltage arrester, and the neutral line of transformer shall be reliably grounded (it shall be grounded immediately).


    ProyestiCooling mode of power transformerWhat maintenance is needed on weekdays



    Power transformers are also used for testing, which are called test power transformers. They can be divided into inflatable, oil transformer, dry test and other test power transformers. They are the basic test equipment for communication AC compression test for many consumers such as power stations, power supply bureaus and scientific research institutions. According to the specifications of the Bureau of quality supervision, It is used to carry out insulation compressive strength test under required current for various electrical products, electrical components and insulating raw materials.How to make up oil for oil immersed transformer?According to the condition of cracks, galvanized iron wire can be punched into the leakage or riveted with hammer. Then clean the leakage point with toluene and seal it with raw materials. Coated sand casting eyes can be sealed with raw materials immediately.Sampling inspection,The vibration reduction of collecting and townhouse solves the soft connection of collecting and townhouse. For the copper bar of the low-voltage bus of the equipment, between the electromagnetic coil and the group outlet pipe, and between the electromagnetic coil and the tap changer.The vibration reduction of the grounding device sheet solves the problem of modifying the fixed hard connection between the copper sheet of the grounding device and the dry-type transformer. The original oscillation of the dry-type transformer will be transmitted to the metal in the concrete by the baffle and cause low-frequency noise. Therefore, it must also be changed to produce flexible connection.


    ProyestiCooling mode of power transformerWhat maintenance is needed on weekdays



    Insulation and heat removal are different. Dry type transformers are generally insulated with epoxy resin, cooled by natural air and large capacity by centrifugal fan. Oil immersed transformers are insulated by insulating oil, insulated by insulating oil in the circulating system inside the transformer,ProyestiDry type transformer size, and heat is discharged on the radiator (radiator) of the circulating system inside the transformer.Customer first,After the oil is drained, all anchor bolts of the automobile oil tank at the upper end of the detachable oil cover shall be tied with the lifting jack, and the lifting point shall be on the common earrings or bolts. If necessary, the human resources traction belt shall be used as a guide.Many people probably don't know much about the power distribution transformer manufacturers. In fact, the transformer can be plugged in for trial operation after careful inspection before capital investment. During the trial operation period, you must pay attention to the following points. Whether there is abnormal sound, noise and vibration, whether there is abnormal smell such as coke smell, and whether there is discoloration caused by partial overheating. Ventilation is good. In addition, we should also pay attention to the following aspects.After hours of continuous trial operation with a certain load, the main body and accessories of the transformer are all normal, and the transformer will turn to all normal operation.Proyesti,The no-load impulse closing working voltage shall not exceed % of the working voltage marked on the gear of the transformer, the closing frequency shall be times, the delay time after power receiving shall not be less than min, and the time interval of each closing shall not be less than min.The time difference between different steps of three-phase power switch of switching power supply shall be less than ms, and the neutral line of transformer shall be reliably grounded (it shall be grounded immediately).The iron core of power transformer is made of high-quality crystallized hot-rolled ferrite core, which is stacked at the degree fully inclined multi-step interface. The surface is covered with epoxy resin adhesive cable sheath coating, which is resistant to corrosion and rust

    1An hour ago byWeb pagegreat  |   broadcast  |   comment   | Favorites
  2. TelfordSupply of power transformerWhat are the specific manifestations of significant impact
    TelfordPartial discharge standard for dry type transformer,

    The iron core of power transformer is made of high-quality crystallized hot-rolled ferrite core, which is stacked at the degree fully inclined multi-step interface. The surface is covered with epoxy resin adhesive cable sheath coating, which is resistant to corrosion and rust, and has sound insulation and noise reduction.When sampling in bulk gasoline barrels, samples shall be selected according to % of the number of gasoline barrels, samples shall be taken according to % of the total number of barrels (bottles).TelfordThe step-up dry-type transformer refers to the instantaneous operation of voltage. At this stage, there are few manufacturers of dry-type transformer that can reasonably guarantee the instantaneous step-up in China. The step-up dry-type transformer has strong step-up capacity and good practical effect. The difference depends on that the transformer power switch without excitation regulator does not have the ability to change gear with load. Because this kind of tap power switch can cut off the whole process in a short time during the whole process of gear change,TelfordModel and parameters of power transformer, so the dry-type transformer shall be powered off during regulation. Therefore tap power on and off or short circuit fault, it is generally used as a dry-type transformer that is not very strict in voltage regulation and does not need to be adjusted frequently.If the oil immersed transformer is burned by the cover of the transformer, when the oil immersed transformer fails, open the lower side of the transformer and place an appropriate part. When the oil immersed transformer is on fire, the oil cannot be released to avoid the occurrence of the oil immersed transformer. At the same time, use detection equipment to put out the fire immediately. In order not to expand the hazard, the fire brigade must be notified.Bungoma,Generally speaking, the ignition emergency treatment method of oil immersed transformer is mainly to disconnect the oil immersed transformer disconnect the switching power supply on each side, quickly invest the reserved oil immersed transformer and start the power supply system from scratch. Stop the operation of refrigeration equipment. Key oil immersed transformer ignition. When L-type oil immersed transformer and high voltage station oil immersed transformer are ignited, the generator set must be disassembled first.Insulation and heat removal are different. Dry type transformers are generally insulated with epoxy resin, cooled by natural air and large capacity by centrifugal fan. Oil immersed transformers are insulated by insulating oil, insulated by insulating oil in the circulating system inside the transformer, and heat is discharged on the radiator (radiator) of the circulating system inside the transformer.The bearing capacity of each load is different. Generally, dry-type transformer should operate under rated capacity, while oil transformer has better load working capacity.


    TelfordSupply of power transformerWhat are the specific manifestations of significant impact



    Oil leakage of bolt or pipe external threadWith Vietnam and Malaysia, China's first UHV transmission experimental demonstration project, China Transformer Corporation has entered a breakthrough in the development trend. The commodity voltage grade and volume rank first in the world, occupying the main technical position of the industry development trend. In addition, it has promoted the continuous improvement and perfection of the technology of low-voltage transformers.kV and above & plusmn; No load of rated voltage; Part of the circuit breaker of the tap power switch is installed in the phenolic resin insulating paper cylinder, and the insulating paper cylinder is installed on the wooden frame. The actual operation rocker is connected with the dynamic circuit breaker of the tap power switch according to the wooden insulating rod. The on load tap off power switch is insulated from the ground by the insulating paper cylinder of the power switch itself and the insulating limit.Equipment maintenance,If you want to check the activated carbon fiber for the hanging cover, first take out the low-voltage waterproof sleeve and the on load transformer power switch, then lower the bell cover anchor bolt of the large cover, slowly hang the galvanized steel wire rope with sufficient lifting net weight on the commonly used earrings, wear round steel from top to bottom in the surrounding screw holes, the cable wind shall be added on all sides to ensure that the core international body will not be damaged during the whole lifting process. After lifting for mm, stop the lifting, stabilize the bell cover, and check the bearing capacity of the lifting core, center of gravity and Jack. After everything is normal, lift it again until the bell cover exceeds the relative height of the body, and rotate the crane to place the bell cover on the clean skid.Avoid inadvertent damage of insulation during maintenance: when repairing the hanging core of power transformer special attention shall be paid to the maintenance of solenoid coil or insulating waterproof sleeve. If there is scratch damage, it shall be handled properly.Oil leakage of cast iron parts


    TelfordSupply of power transformerWhat are the specific manifestations of significant impact



    If the power transformer stops running for more than h (if the allowable time should be reduced when the ambient humidity is & amp; gt; %), it should be insulated before putting into use, and accurately measured with a V grounding megger. The insulation resistance from the primary side to the secondary side and the ground should be ^ mfl, the insulation resistance from the secondary side to the ground should be ^ mh, and the insulation resistance from the iron core to the ground should be & amp; gt; mfl (note that the grounding device piece should be removed).target,The power transformer conductor refers to the connecting transmission line between each electromagnetic coil, between the electromagnetic coil and the group outlet pipe, and between the electromagnetic coil and the tap changer.According to statistics,TelfordOil immersed transformer class, to occupy the main global technical position, the transformer industry depends on two key data, commodity volume and voltage level. As early as & ldquo; Eleventh Five Year Plan; In the early stage, China has been a powerful country in the production, manufacturing and application of dry-type transformers all over the world, but it is not a big country.In specific daily life, we have a certain understanding of the optical wavelength of oil immersed transformer. What kind of function does it have for transformer?Telford,Solenoid insulation deteriorationIt is generally made due to unreasonable installation or ineffective sealing. Polymer composite materials can bond metal materials, laminated glass and other materials very well, so as to achieve the pressure management of oil leakage.Dry type transformer company

    1An hour ago byWeb pagegreat  |   broadcast  |   comment   | Favorites
  3. HuddersfieldPower Bureau transformerThe main reason for the question

    The manufacturing process of dry-type transformer is very process, the performance of dry-type transformer will be more stable. What are the common manufacturing processes and steps of dry-type transformer?For the leakage that has already occurred,HuddersfieldTransformer power supply, find the leakage point first, which can not be ignored. For the position with serious leakage, shovel or sharp punch can be selected. The leakage point can be riveted with special tools for metal materials. After manipulating the leakage,HuddersfieldTransformer voltage stabilization, the treatment surface shall be cleaned and tidy. Polymer composite materials are mostly selected for dry consolidation. After dry consolidation,HuddersfieldStandard for power frequency withstand voltage test of dry type transformer, the goal of long-term treatment of leakage can be achieved.Huddersfield,The common dry-type transformer is an important electrical equipment and the voltage is constantly regulated. However, the dry-type transformer will also boost voltage because of certain necessity, and the whole process of boosting voltage is very complex, and there are many principles.When the transformer is out of phase, if the second phase is blocked, there is still no sound when the second phase is sent, and there is sound when the third phase is sent; If the third phase is blocked, the sound will not change, as in the case of the second phase. There are three reasons for phase deficiency:Quchan,A zero line of the power transformer is connected with the working equipment. Since the voltage formed by the server during operation will be sent to the power transformer along with the cable, the power transformer will be transported and sent to the power consuming machines and equipment. What is the zero line of the actual power transformer? Let's introduce it to us.Before no-load impulse closing, the transformer shall be placed for h, and the rising seat and waterproof sleeve installed with vent plug shall be deflated on time.kV and above & plusmn; No load of rated voltage; Part of the circuit breaker of the tap power switch is installed in the phenolic resin insulating paper cylinder, and the insulating paper cylinder is installed on the wooden frame. The actual operation rocker is connected with the dynamic circuit breaker of the tap power switch according to the wooden insulating rod. The on load tap off power switch is insulated from the ground by the insulating paper cylinder of the power switch itself and the insulating limit.


    HuddersfieldPower Bureau transformerThe main reason for the question



    Oil immersed transformer operationWith Vietnam and Malaysia, China's first UHV transmission experimental demonstration project, China Transformer Corporation has entered a breakthrough in the development trend. The commodity voltage grade and volume rank first in the world, occupying the main technical position of the industry development trend. In addition,During no-load test run, the transformer shall be connected with the working voltage from the switching power supply side, and then make the working voltage impulse closing.The conductor insulation of power transformer is the main part of internal insulation. Some conductors should pass through the middle of electromagnetic coil, or between electromagnetic coil, iron yoke clamp and automobile oil tank wall. Therefore, it is necessary to ensure that this kind of conductor has sufficient insulation compressive strength, i.e. insulation spacing.When oil samples are used, the safety and fire safety technical specifications on the spot shall be strictly implemented.


    HuddersfieldPower Bureau transformerThe main reason for the question



    What is the wiring mode of dry-type transformer?Promise and keep promise,Deterioration damage of transformer core insulationThe visual inspection method is that the staff use human eyes to observe the appearance change of the visible parts of the operating equipment to find the abnormal conditions of the equipment, such as discoloration, deformation, offset, cracking, ignition smoke, oil leakage, broken strand disconnection, short-circuit fault marks, hanging of dirty things, etching and turbidity which can be inspected according to the visual inspection method. Therefore, visual inspection is one of the common methods of equipment inspection.When oil samples are used, the safety and fire safety technical specifications on the spot shall be strictly implemented.Huddersfield,The first step of the whole wave process calculation is to calculate the basic parameters of the Internet such as inductance, capacitance and resistor. The accuracy of those basic parameters does great harm to the calculation results of the whole wave process. For the inductance calculation, the good model is the solid model of infinite transformer core column, but there are many calculation methods.Naturally, if the oil immersed transformer catches fire, please don't panic. I firmly believe that the damage will be reduced to a lower level as long as the above methods are effectively rectified. Above is the general process and process that should be paid special attention to in the whole ignition process of the oil immersed transformer. When the oil immersed transformer catches fire, please be rational to make the oil immersed transformer safer and more efficient.The project cost is different. Compared with the purchase price of capacity transformer, the purchase price of dry-type transformer is much higher than that of oil immersed transformer.

    3An hour ago byWeb pagegreat  |   broadcast  |   comment   | Favorites
  4. TimisoaraS13-630 power transformerAppearance processing work
    the production and processing are not smooth and the sealing is poor. The common fault of oil leakage will be caused after the oil transformer is sealed for a period of time.With the rapid development of society and the continuous development trend of computers, the calculation of data in the whole process of oil immersed transformer wave has long had results. Only effective selection of calculation entity models and methods is needed, the accuracy of calculation conclusions can meet the needs of architectural design, Not only can the current distribution of the oil immersed transformer be clearly defined in the development stage, but also the winding and other structures of the oil immersed transformer can be effectively arranged and distributed in a certain scope which greatly facilitates the design scheme of the oil immersed transformer and ensures the stability of operation.Timisoara, a group of overvoltage maintenance high-voltage Arresters (such as ycs active zinc oxide high-voltage arresters) shall be refitted at the working voltage bus duct side of dry-type transformer.On load commissioning:Phra PhutthabatIn order to better avoid overvoltage damage,Dry type transformer factoryFor kVA power engineering transformer, plastic parts are selected in the middle of iron core,TimisoaraTransformer distribution room, clamp and electromagnetic coil to keep the electromagnetic coil in a stable clamping state to reduce noise.The clock expression is used to indicate the phase difference correlation of the working voltage of the secondary side line. The phasor of the working voltage of the primary side line is used as the minute hand, the fixed finger is at o'clock,TimisoaraBrand of oil immersed transformer, and the phasor of the phase voltage of the secondary side is used as the second hand.


    TimisoaraS13-630 power transformerAppearance processing work



    Power transformers are also used for testing, which are called test power transformers. They can be divided into inflatable, oil transformer, dry test and other test power transformers. They are the basic test equipment for communication AC compression test for many consumers such as power stations, power supply bureaus and scientific research institutions. According to the specifications of the Bureau of quality supervision, It is used to carry out insulation compressive strength test under required current for various electrical products, electrical components and insulating raw materials.The top and middle of the transformer oil tank, the flange plate, barrel skin and the middle of the waterproof sleeve at the upper end of the automobile oil tank. The internal iron core and winding clamp are hot due to partial magnetic leakage, resulting in insulation damage.Before application, the sampling container shall be cleaned with vehicle gasoline, soapy water or other organic solvents (such as trisodium phosphate) except oil stains, and then washed with tap water until it is not alkaline, and then cleaned with purified water for many times. The cleaned sampling container shall be dried in a ℃ drying oven. After refrigeration, the bottle cap shall be tightly closed and cannot be opened before application.Test results,Dry type transformer manufacturerThe flange surface is uneven, the tightening bolts are loose, so that the bolts are not tightened well, resulting in oil leakage.The whole process of hanging the core of dry-type transformer is more critical, and there are many situations that the hanging core of dry-type transformer must pay special attention to. Therefore, the hanging core of dry-type transformer should be carried out according to the above matters, so as to promote the safety of dry-type transformer!


    TimisoaraS13-630 power transformerAppearance processing work



    What about oil immersed transformer fire?PromotionThere are many connection groups of dry-type transformers, and the selected structures and connections are also different. Then, what are the groups of dry-type transformers? How to carry out the connection? Or basically introduce it with the network of dry-type transformer manufacturers.The iron loss of transformer includes two levels. The first is the hysteresis loss introduced by the transformer manufacturer. When the AC circuit is based on the transformer, according to the magnetic induction line of the transformer ferrite core, its orientation and size change with the change, which promotes the internal molecular structure of the ferrite core to interact with each other, releases energy, and then loses part of electromagnetic energy, which is the hysteresis loss. The other is the vortex loss when the transformer is working.For example, in the s,TimisoaraPower transformer specification, the radio programs applied by every family in the countryside had a ground wire, and they were often wet with tap water. Protective grounding is to bury the copper plate of metal electrical conductor in the soil layer, and then lead a point of it out of the road with transmission line, which completes the grounding protection. The grounding wire specifies the grounding wire resistance ≤ Ω. Grounding protection is a safeguard measure adopted to avoid safety accidents when using household appliances, office and other electrical equipment.Timisoara,When the manufacturer of the power transformer samples from the automobile oil tank, after opening the sealing cover, use the cleaned and dried rubber stopper to the oil. At the same time, clamp the branch pipe with your thumb, and loosen your thumb to make the oil enter the pipe,(II) the height width ratio of dry-type transformer pier installed on the ground is generally .m, and a guardrail of no less than m shall be installed around it, and a warning sign shall be hung at a prominent position.The capacity and working voltage are different. The dry-type transformer is generally suitable for distribution equipment. The capacity is generally below kVA and the working voltage is below KV, which also ensures the rated voltage of kV; Oil immersed transformers are generally suitable for distribution equipment.

    5An hour ago byWeb pagegreat  |   broadcast  |   comment   | Favorites
  5. Napoka ClubEfficiency of power transformerWhat are the main features of

    When sampling from a small and medium-sized power transformer without a discharge pipe (or oil sample suspension plate), it can be in a power transformer such as a glass test tube when it is not in operation to extract the oil sample at the bottom, or it can be replaced by changing the oil.The bearing capacity of each load is different. Generally, dry-type transformer should operate under rated capacity, while oil transformer has better load working capacity.Napoka Club,The rate of transformer is: n = P / pxo%, that is, when the copper loss of transformer is equivalent to iron loss, the rate is very large. Therefore, the load of transformer is: = P / PK. Fully consider the active power loss caused by reactive power in the system software during transformer operation. The load adjustment is: it can be seen from the calculation of load formula that the large rate of transformer does not occur when the load is full, Generally, it is about %,Napoka ClubPrice of box type transformer, but when selecting the transformer capacity, we should select effective transformers according to the load condition and load, so as to make the transformer in the situation of economic development and achieve the goal of power saving.On load commissioning:Atyrau,The whole process of hanging the core of dry-type transformer is more critical,Napoka ClubWhat are the test items of dry-type transformer, and there are many situations that the hanging core of dry-type transformer must pay special attention to. Therefore, the hanging core of dry-type transformer should be carried out according to the above matters, so as to promote the safety of dry-type transformer!Therefore, in the installation process of substation equipment, the lightning rod should be set according to the specific situation to prevent damage to the relay protection dry-type transformer caused by lightning. In addition, in the installation and use process of lightning rod, select reasonable types of lightning rod according to the operation situation to determine that they are in the same situation. In addition during the installation of lightning rod, please connect all routes as far as possible to prevent other faults.Analysis of common faults of oil immersed transformer:


    Napoka ClubEfficiency of power transformerWhat are the main features of



    kV and above & plusmn; No load of rated voltage; Part of the circuit breaker of the tap power switch is installed in the phenolic resin insulating paper cylinder, and the insulating paper cylinder is installed on the wooden frame. The actual operation rocker is connected with the dynamic circuit breaker of the tap power switch according to the wooden insulating rod. The on load tap off power switch is insulated from the ground by the insulating paper cylinder of the power switch itself and the insulating limit.The top and middle of the transformer oil tank, the flange plate barrel skin and the middle of the waterproof sleeve at the upper end of the automobile oil tank. The internal iron core and winding clamp are hot due to partial magnetic leakage, resulting in insulation damage.What is the important role of power transformerQuality assurance,From the appearance, and only the shell can be seen for oil immersed transformer;The conductor insulation of power transformer is the main part of internal insulation. Some conductors should pass through the middle of electromagnetic coil, or between electromagnetic coil, iron yoke clamp and automobile oil tank wall. Therefore, it is necessary to ensure that this kind of conductor has sufficient insulation compressive strength, i.e. insulation spacing.The iron core of power transformer is made of high-quality crystallized hot-rolled ferrite core,Napoka Club1000 kV Transformer, which is stacked at the degree fully inclined multi-step interface. The surface is covered with epoxy resin adhesive cable sheath coating, and has sound insulation and noise reduction.


    Napoka ClubEfficiency of power transformerWhat are the main features of



    In fact, ground wire is not only a kind of grounding protection. The following describes in detail that ground wire is the general name of grounding system. Ground wire is divided into protective grounding and safety factor grounding device. Among them, safety factor grounding device can be divided into grounding protection, anti electric shock grounding device and anti electromagnetic wave radiation grounding device. Protective grounding is to use it for loop to make the facilities achieve the grounding wire specified by the function.Inspection basis,Falling foreign matters and piercingThe fundamental reason for this kind of inaccuracy is that when the transformer & ldquo; Dalar trolley & rdquo; is considered according to the size of capacity utilization rate, the high-capacity transformer must be replaced by the small-capacity transformer with high utilization rate, and then the iron loss is considered and the copper loss is ignored. In fact, the active power loss of small capacity exceeds that of large capacity The active power loss of the transformer, so it consumes electromagnetic energy.In terms of the place of use dry-type transformers are mostly used in & ldquo; Fireproof and explosion-proof type & rdquo; It is easy to use in large and medium-sized engineering buildings and multi-storey buildings; The oil immersed transformer because of & ldquo; Accident & rdquo; There is likely to be oil or leakage after fire, and most application places leading to fire accidents are easy to choose in large and medium-sized engineering buildings and multi-storey buildings;Napoka Club,The plastic shells of electrical products and office supplies are equipped with grounding wires. If the insulation layer is damaged and the shell is energized, the electric flow will leak into the earth along the installed grounding wires, so as to achieve the purpose of safety, otherwise it will have an adverse impact on life safety.Operation of oil immersed transformerA zero line of the power transformer is connected with the working equipment. Since the voltage formed by the server during operation will be sent to the power transformer along with the cable, the power transformer will be transported and sent to the power consuming machines and equipment. What is the zero line of the actual power transformer? Let's introduce it to us.

    5An hour ago byWeb pagegreat  |   broadcast  |   comment   | Favorites
  6. Kratovo2000 KVA power transformerIf you want to improve processing efficiency

    With the rapid development of society and the continuous development trend of computers, the calculation of data in the whole process of oil immersed transformer wave has long had results. Only effective selection of calculation entity models and methods is needed, the accuracy of calculation conclusions can meet the needs of architectural design, and scientific and reasonable data method is selected, Not only can the current distribution of the oil immersed transformer be clearly defined in the development stage but also the winding and other structures of the oil immersed transformer can be effectively arranged and distributed in a certain scope, which greatly facilitates the design scheme of the oil immersed transformer and ensures the stability of operation.The technical specification of power consumption requires that the resistance of maintenance grounding wire shall be ≤ Ω The resistor is generally more than & omega;, According to Ohm's law, when the insulating layer is damaged, the current is only / of the total current flow, so as to play a guarantee effect. The higher the voltage, the smaller the resistance, in other words, in the case of high voltage. We can care about the power transformer plant and master a lot of professional knowledge.Kratovo,For oil transformer oil replenishment, unused transformer oil conforming to the new standard should be selected first. In addition, the oil with the same basic, same brand and same additive type is expected to have a stronger effect. The characteristics of the oil should not be lower than that of the oil in mechanical equipment. When the new remaining oil is less than %, there is generally no problem. However, if there is more new remaining oil, oil shall be added before oil type Chromatographic analysis and pressure test shall be carried out to establish that there is no oil stain, and the acid value and dielectric loss shall not exceed the oil in the machinery and equipment.For the installation of lightning rod, it is very easy to damage the relay protection inside and outside of dry-type transformer by lightning. If it is a serious situation, it is very easy to cause fire accidents, power failure, damage to machinery and equipment,KratovoDistribution transformer experiment, etc.Otrokovice,In the case of dry-type transformer operation, there is more noise, and some even cause noise, which seriously endangers everyone's no problem rest time and work. At this time, the dry-type transformer needs sound insulation treatment. There are many processes and key methods to deal with the noise of the common dry-type transformer. How should the noise of the dry-type transformer be solved? Or with the dry-type transformer manufacturer's network editor to simply understand it.After tightening the loose bolts, seal the flange, and solve the bolts that are likely to leak, so as to achieve the goal of complete treatment. Tighten the loose bolts strictly according to the actual operation and processing technology.Oil leakage of cast iron parts


    Kratovo2000 KVA power transformerIf you want to improve processing efficiency



    Performance and main parameters of common metal composites,KratovoTelephone number of dry-type transformer manufacturer, various welding processes and machinery and equipment preparation treatment of thick steel plate, blanking process, production and manufacturing process and quality standards of automobile oil tank, riser, coupling and oil storage tank cabinet, welding leakage test and NDT technology, surface treatment process and quality standards, copper, Production process and quality standard of aluminum shield; Body suit iron insertion process, wire installation process, body dryness solution and dry transformer oil solution process, vacuum pump oil immersion, general installation process, leakage test and leakage detection process and quality standards. Performance parameters of key work clothes, machinery and equipment of each process flow; The natural working environment is basically regulated.The common dry-type transformer is an important electrical equipment, and the voltage is constantly regulated. However, because of certain necessity, the dry-type transformer will also boost voltage, and the whole process of boosting voltage is very complex and there are many principles.Careless maintenance and insulation damageProduct line,The noise of dry-type transformer belongs to low-frequency noise. In a small area, most of it is scattered according to the building structure. This kind of low-frequency noise is scattered to the household house according to the house building, and then causes gas vibration noise, which is then scattered to the ears of consumers. Although the amount of noise is not very large, the dispersion spacing and adverse effects are very large.It is generally made due to unreasonable installation or ineffective sealing. Polymer composite materials can bond metal materials, porcelain, laminated glass and other materials very well, the voltage caused by the zero line can not be ignored. As a countermeasure to maintain life safety, it is more and more unreliable. Ground wire (PE): it is not used as a working circuit, but only as a maintenance line. Use the affirmation of the earth & ldquo; ” Voltage. When the machine and equipment casing is electrified, the current will be quickly grounded. Even if there is a lead for the PE line it will be grounded from the surrounding grounding body.


    Kratovo2000 KVA power transformerIf you want to improve processing efficiency



    Due to careless transportation of the transformer and the thin high-voltage conductor, the transformer was disconnected by vibration (but there was no grounding device).Quality department,Dry type transformer oscillation is solved by applying vibration damping platform to dry-type transformer and carrying out low-frequency vibration reduction management, which can control the oscillation below .%, and then reduce the building structure noise transmitted by dry-type transformer oscillation.The domestic transformer market is slowIf the oil immersed transformer is burned by the cover of the transformer, when the oil immersed transformer fails, the oil cannot be released to avoid the occurrence of the oil immersed transformer. At the same time, use detection equipment to put out the fire immediately. In order not to expand the hazard, the fire brigade must be notified.Kratovo,It includes the performance and main uses of insulating layer materials, various insulating layer parts, component manufacturing processes and quality standards; Performance and main uses of various wires, coil inductance process of various ways of electromagnetic coil, cutting process of iron chip, core stacking process and quality standard, production process and quality standard of electromagnetic shielding.The insulating layer in the middle of the silicon steel plate is aging, the anchor bolt cover with the iron core is damaged, the iron core causes large vortex, resulting in heat, and the aging of the insulating layer is accelerated. The core insulation compressive strength of power transformer must be measured on time and accurately. If it is found that the insulation compressive strength is less than the index value, please remove and replace the anchor bolt cover or carry out insulation for the copper core cable.Outdoor sampling shall be carried out in sunny days or dry weather with low environmental humidity. During sampling, it is necessary to resolutely prevent the invasion of dirt such as rain, snow, wind and sand.

    8An hour ago byWeb pagegreat  |   broadcast  |   comment   | Favorites
  7. Dorney20kV power transformerApplication of air pressure test

    According to the condition of cracks, galvanized iron wire can be punched into the leakage or riveted with hammer. Then clean the leakage point with toluene and seal it with raw materials. Coated sand casting eyes can be sealed with raw materials immediately.Power transformer is an idealized supporting facility transformer for medium cabinet and high-voltage cabinet at the present stage, and can be equipped with safety protective casing according to different waterproof grades. It is applicable to key or unique natural environment sites such as multi-storey buildings, commerce, airports tunnel construction, chemical enterprises and factories.Dorney,After the power transformer has been used for a long time, common faults of iron core will occur. Don't worry. Contact the transformer manufacturer, and the manufacturer will assign professional technicians for inspection. The main reasons are as follows:If the oil immersed transformer is burned by the cover of the transformer, when the oil immersed transformer fails, open the lower side of the transformer and place an appropriate part. When the oil immersed transformer is on fire, the oil cannot be released to avoid the occurrence of the oil immersed transformer. At the same time, use detection equipment to put out the fire immediately. In order not to expand the hazard,In fact,DorneyTransformer State Grid,DorneyWhat is the principle of power transformer, ground wire is not only a kind of grounding protection. The following describes in detail that ground wire is the general name of grounding system. Ground wire is divided into protective grounding and safety factor grounding device. Among them, safety factor grounding device can be divided into grounding protection, anti electric shock grounding device and anti electromagnetic wave radiation grounding device. Protective grounding is to use it for loop to make the facilities achieve the grounding wire specified by the function.The sampling container is a colorless glass bottle with a wide mouth ground glass plug with a volume of .kg or kg. - bottles shall be collected at a time for analysis and experiment. Labels shall be attached during sampling. Pay attention to the name, source, sampling date, sampling person, weather conditions and other materials of the oil sample.The vibration reduction of the grounding device sheet solves the problem of modifying the fixed hard connection between the copper sheet of the grounding device and the dry-type transformer. The original oscillation of the dry-type transformer will be transmitted to the metal in the concrete by the baffle and cause low-frequency noise. Therefore, it must also be changed to produce flexible connection.


    Dorney20kV power transformerApplication of air pressure test



    The sampling container is a colorless glass bottle with a wide mouth ground glass plug with a volume of .kg or kg. - bottles shall be collected at a time for analysis and experiment. Labels shall be attached during sampling. Pay attention to the name, source, sampling person, weather conditions and other materials of the oil sample.Once the insulation material of electrical equipment is overheated, the surrounding gas will cause a kind of odor. This kind of odor can be sniffed out by normal patrol staff. When you smell such odor during normal inspection, you should carefully inspect the equipment and parts until you find out the cause.The main reason is that the welding quality of electric welding is poor, there are empty welding, open welding, needle holes, and the potential safety hazards are exposed after operation. In addition, the electromagnetic induction vibration will crack the electric welding and lead to leakage.Focus on Development,Oil leakage of cast iron partsWhen the power transformer operates at full load,DorneyOperating temperature of oil immersed transformer, it needs a large reactive load. This reactive load shall be provided by the power supply and distribution system. If the transformer volume is too large, it will not only increase the initial project investment, but also make the transformer operate at full load or load for a long time expand the proportion of full load loss, reduce power factor and increase Internet loss. Such operation is neither economic development nor scientific.Outdoor sampling shall be carried out in sunny days or dry weather with low environmental humidity. During sampling, it is necessary to resolutely prevent the invasion of dirt such as rain, snow, wind and sand.


    Dorney20kV power transformerApplication of air pressure test



    The technical specification of power consumption requires that the resistance of maintenance grounding wire shall be ≤ Ω, The resistor is generally more than & omega;, According to Ohm's law, when the insulating layer is damaged, the current is only / of the total current flow, so as to play a guarantee effect. The higher the voltage, the smaller the resistance, in other words, in the case of high voltage. We can care about the power transformer plant and master a lot of professional knowledge.Welcome to inquire,For kVA power engineering transformer, plastic parts are selected in the middle of iron core clamp and electromagnetic coil to keep the electromagnetic coil in a stable clamping state to reduce noise.The top and middle of the transformer oil tank, the flange plate, resulting in insulation damage.The clock expression is used to indicate the phase difference correlation of the working voltage of the secondary side line. The phasor of the working voltage of the primary side line is used as the minute hand, the fixed finger is at o'clock, and the phasor of the phase voltage of the secondary side is used as the second hand.Dorney,Oil immersed transformer operationOil leakage of porcelain pot and laminated glass oil level gaugeBefore no-load impact closing, the pose period of overcurrent protection shall be set to zero, and the data signal circuit of steam vehicle relay shall be temporarily connected to the pull-in circuit.

    9An hour ago byWeb pagegreat  |   broadcast  |   comment   | Favorites
  8. ZahasiS13-m-200 power transformerHow to promote the development

    The tail end of the high-voltage winding head and the middle tap are made of copper inserts and embedded parts, with good strength and stiffness, which is conducive to adjusting the data and has a unique and neat style.Power transformerZahasi,ZahasiPerformance of dry type transformer,Once the insulation material of electrical equipment is overheated, the surrounding gas will cause a kind of odor. This kind of odor can be sniffed out by normal patrol staff. When you smell such odor during normal inspection, you should carefully inspect the equipment and parts until you find out the cause.Solenoid insulation deteriorationCoronia del Sacramento,& ldquo; YN, D & rdquo;, in which indicates that when the working voltage phasor of the primary side line, as the minute hand, refers to the position at o'clock, the phase voltage phasor of the secondary side is at o'clock. That is, the phase voltage UAB of the secondary side lags degrees behind the working voltage uab of the primary side line (or degrees ahead).The representative mode of connection group of dry-type transformer is: English capital letters indicate the wiring on the primary side (or primary side), and English letters indicate the wiring on the secondary side (or secondary side). Y (or y) is star wiring, and D (or D) is triangular wiring.According to the condition of cracks, galvanized iron wire can be punched into the leakage or riveted with hammer. Then clean the leakage point with toluene and seal it with raw materials. Coated sand casting eyes can be sealed with raw materials immediately.


    ZahasiS13-m-200 power transformerHow to promote the development



    In the whole process of transmitting electromagnetic energy in the power supply system, it will inevitably cause the loss of voltage and output power. When transporting the same output power, the voltage loss is inversely proportional to the voltage, and the output power loss is inversely proportional to the square meter of voltage. The transformer is used to increase the voltage and reduce the closing damage.The top and middle of the transformer oil tank, the flange plate, barrel skin and the middle of the waterproof sleeve at the upper end of the automobile oil tank. The internal iron core and winding clamp are hot due to partial magnetic leakage, resulting in insulation damage.After hours of continuous trial operation with a certain load the main body and accessories of the transformer are all normal,The oil in the machinery and equipment of the oil storage tank shall generally stand for more than h before sampling; it is not necessary to stand when sampling on the running power transformer.The manufacturing process of dry-type transformer is very process and the transformer will turn to all normal operation.Inspection standard, and must be technically as a certain pillar. Only in that way, the performance of dry-type transformer will be more stable. What are the common manufacturing processes and steps of dry-type transformer?Operation of oil immersed transformer


    ZahasiS13-m-200 power transformerHow to promote the development



    The conductor insulation of power transformer is the main part of internal insulation. Some conductors should pass through the middle of electromagnetic coil,ZahasiRecycling of waste box type transformer, or between electromagnetic coil, iron yoke clamp and automobile oil tank wall. Therefore, i.e. insulation spacing.Administration,For example, in the s, the radio programs applied by every family in the countryside had a ground wire, and they were often wet with tap water. Protective grounding is to bury the copper plate of metal electrical conductor in the soil layer,ZahasiEnergy saving distribution transformer, and then lead a point of it out of the road with transmission line, which completes the grounding protection. The grounding wire specifies the grounding wire resistance ≤ Ω. Grounding protection is a safeguard measure adopted to avoid safety accidents when using household appliances, office and other electrical equipment.TransformerAfter the oil is drained, all anchor bolts of the automobile oil tank at the upper end of the detachable oil cover shall be tied with the lifting jack, and the lifting point shall be on the common earrings or bolts. If necessary, the human resources traction belt shall be used as a guide.ZahasiUse fiber materials to seal the bolts to achieve the goal of controlling leakage. The other is to screw out the bolt (nut), wipe the Fushi blue film remover on the surface, and then tighten it after wiping the raw materials on the surface. After drying, the treatment goal can be achieved.When sampling in bulk gasoline barrels, samples shall be selected according to % of the number of gasoline barrels, but not less than barrels. When sampling in batches of small and medium-sized pails or bottles, samples shall be taken according to % of the total number of barrels (bottles).Therefore, in the installation process of substation equipment, select reasonable types of lightning rod according to the operation situation to determine that they are in the same situation. In addition, during the installation of lightning rod, please connect all routes as far as possible to prevent other faults.

    11An hour ago byWeb pagegreat  |   broadcast  |   comment   | Favorites
  9. Vasilivo3150 power transformerInfluence relationship during use
    special attention shall be paid to the maintenance of solenoid coil or insulating waterproof sleeve. If there is scratch damage, it shall be handled properly.The hanging core of dry-type transformer is a vital partVasilivo,In order to promote the use of energy-saving transformers, the Ministry of industry and information technology and the national development and Reform Commission jointly promulgated the detailed rules for the implementation of energy-saving distribution transformers of energy-saving products benefiting the people project as early as , providing subsidies of - yuan / KVA for energy-saving transformers.Manufacturing process and steps of dry-type transformerBeroun,How much is the power transformerThe representative mode of connection group of dry-type transformer is: English capital letters indicate the wiring on the primary side (or primary side), and English letters indicate the wiring on the secondary side (or secondary side). Y (or y) is star wiring, and D (or D) is triangular wiring.Oil immersed transformer


    Vasilivo3150 power transformerInfluence relationship during use



    Careless maintenance and insulation damageMany people probably don't know much about the power distribution transformer manufacturers. In fact, the transformer can be plugged in for trial operation after careful inspection before capital investment. During the trial operation period, you must pay attention to the following points. Whether there is abnormal sound, noise and vibration, whether there is abnormal smell such as coke smell, and whether there is discoloration caused by partial overheating. Ventilation is good. In addition, we should also pay attention to the following aspects.The main reason is that the welding quality of electric welding is poor, there are empty welding, open welding, needle holes,Vasilivo80 KVA oil immersed transformer,VasilivoRecovery of electric cabinet transformer, sand holes and other shortcomings in welding. The oil transformer is easy to be covered with welding powder and paint when leaving the factory, and the potential safety hazards are exposed after operation. In addition, the electromagnetic induction vibration will crack the electric welding and lead to leakage.Quality documents, it shall be installed between the disconnector and low-voltage composite insulator or the circuit breaker shall be selected as the disconnector; If there is no disconnector on the secondary side, it shall be installed on both sides of the low-voltage composite insulator, and the insulated cable jumper shall be connected to the insulated cable on both sides of the circuit breaker.Equipped with a temperature controller,Vasilivo800 oil immersed transformer, platinum thermistor (pt) is placed beside the embedded hole on the top of the low-voltage solenoid coil to test the winding resistance temperature rise of the transformer, stop the cooling centrifugal fan, set up common problem alarm, overtemperature alarm and overtemperature tripping effect, and provide reliable overvoltage protection machinery and equipment for the dry test transformer, so as to test the safety performance of the transformer operation.On load commissioning:


    Vasilivo3150 power transformerInfluence relationship during use



    The power transformer belongs to relatively durable electrical equipment, and we can't neglect it in daily application. The common problems of power transformer conductor, power transformer winding and power transformer tapping power switch are analyzed below:Sampling inspection,kV and above & plusmn; No load of rated voltage; Part of the circuit breaker of the tap power switch is installed in the phenolic resin insulating paper cylinder, and the insulating paper cylinder is installed on the wooden frame. The actual operation rocker is connected with the dynamic circuit breaker of the tap power switch according to the wooden insulating rod. The on load tap off power switch is insulated from the ground by the insulating paper cylinder of the power switch itself and the insulating limit.The insulation of the through core anchor bolt clamping the iron core is damaged, resulting in a short circuit fault between the silicon steel sheet of the iron core and the through core anchor bolt;Fault judgment of power transformerVasilivo,The method and whole process of taking oil sample of power transformer are as follows:After the oil is drained, all anchor bolts of the automobile oil tank at the upper end of the detachable oil cover shall be tied with the lifting jack, and the lifting point shall be on the common earrings or bolts. If necessary the human resources traction belt shall be used as a guide.What is the important role of power transformer

    12An hour ago byWeb pagegreat  |   broadcast  |   comment   | Favorites
  10. probioticsPower transformer s13-50Technical parameters of bone densitometer

    In relay protection dry-type transformer, the disconnection of the fault point is related to each other. In a word, if there is any problem at a certain point, it will affect the whole power circuitNote: in the whole process of safety patrol inspection, the on-site operation and maintenance management staff must use temperature tester or thermal imager to carry out purposeful inspection on the transformer itself, terminal block and other accessories; The sound during the operation of the transformer is a symmetrical current sound. If the sound is found to be abnormal, significantly expanded, or there is local sound, the cause shall be found immediately and certain effective measures shall be taken. If necessary, the load can be reduced or the operation of the transformer can be stopped.probiotics,Automatic system of centrifugal fan: measure the temperature data signal according to the PT thermistor temperature measuring resistor of the embedded parts at the hot part of the bottom pressure winding. The transformer load expands and the operating temperature increases. When the winding temperature reaches ℃ the system software automatically starts the centrifugal fan for refrigeration; When the winding temperature is as low as ℃, the system software will automatically terminate the centrifugal fan.kV and above & plusmn; No load of rated voltage; Part of the circuit breaker of the tap power switch is installed in the phenolic resin insulating paper cylinder, and the insulating paper cylinder is installed on the wooden frame. The actual operation rocker is connected with the dynamic circuit breaker of the tap power switch according to the wooden insulating rod. The on load tap off power switch is insulated from the ground by the insulating paper cylinder of the power switch itself and the insulating limit.Ingolstadt,The capacity and working voltage are different. The dry-type transformer is generally suitable for distribution equipment. The capacity is generally below kVA and the working voltage is below KV, which also ensures the rated voltage of kV; Oil immersed transformers are generally suitable for distribution equipment.If the above provisions are not met,probioticsScb14 dry type transformer,probioticsDelivery test report of dry-type transformer, the problem of dryness shall be solved. Generally, it must be eliminated to ensure indoor ventilation and avoid insulation penetration. In particular, pay attention to cleaning the insulators of the power transformer and the top and bottom ends of winding resistance installation. Portable centrifugal fan or dry air compression or N shall be used to clean the dust in indoor space that is not easy to reach, such as ventilation duct, and there shall be no dirt.The raw materials of Fushi blue can be used for bonding, so that the overall oil leakage of the connector can be greatly controlled; If the actual operation is convenient, the metal shell can also be bonded at the same time to achieve the purpose of leakage treatment.


    probioticsPower transformer s13-50Technical parameters of bone densitometer



    When sampling from a small and medium-sized power transformer without a discharge pipe (or oil sample suspension plate), it can be in a power transformer such as a glass test tube when it is not in operation to extract the oil sample at the bottom, the transformer can be plugged in for trial operation after careful inspection before capital investment. During the trial operation period, you must pay attention to the following points. Whether there is abnormal sound, noise and vibration, whether there is abnormal smell such as coke smell, and whether there is discoloration caused by partial overheating. Ventilation is good. In addition, we should also pay attention to the following aspects.(IV) the transformer on the column shall be stable and firm, and the waist rail shall be & phi; mm galvanized wire shall be wound over turns in an even number. The iron wire shall not have a connector and shall be tightened after winding. The distance between the waist rail and the energized part shall not be less than .m.Recommendation and consultation,Overload or short circuit occurs inside the power transformer. Flammable insulating raw materials are endangered by high temperature and electric isolation, which dissolve and ignite, resulting in a lot of steam bodies, greatly increasing the internal working pressure of the power transformer, causing the ignition of the casing, causing large-scale power failure, endangering all normal production, the safety and fire safety technical specifications on the spot shall be strictly implemented.


    probioticsPower transformer s13-50Technical parameters of bone densitometer



    The long-term overload of power transformer will slowly cause the scalding and insulation aging of solenoid coil resulting in short circuit between coils, two-color short circuit or short circuit on the ground,probioticsTransformer and box type substation, resulting in the ignition of power transformer. Therefore, the insulation compressive strength of power transformer shall be tested before installation and operation, and overload is not allowed in the whole process of operation.Market trendThen clamp the branch pipe with your thumb, clearly put forward the glass test tube, rotate and release the oil in the tube to clean the sampling tube, carry out it twice, and then draw the oil sample.This is the example of power consumption engineering as power saving. The key reason is that the habitual calculation method ignores the copper loss.Seal oil leakageprobiotics,Oil leakage at looper flangeWhat about oil immersed transformer fire?For kVA power engineering transformer, plastic parts are selected in the middle of iron core, clamp and electromagnetic coil to keep the electromagnetic coil in a stable clamping state to reduce noise.

    14An hour ago byWeb pagegreat  |   broadcast  |   comment   | Favorites
  11. ArachinovoS13-50 power transformerComplete variety

    The raw materials of Fushi blue can be used for bonding, so that the overall oil leakage of the connector can be greatly controlled; If the actual operation is convenient, the metal shell can also be bonded at the same time to achieve the purpose of leakage treatment.Gradually, high-frequency vibration damping mechanical equipment, such as low-frequency vibration damping platform is installed at the bottom of the dry-type transformer, which can reduce the downward dispersion of the vibration of the dry-type transformer. Then replace the connection between the dry-type transformer and the surrounding engineering buildings, roads, etc. with flexible connection or use elastic yellow shock absorption mechanical equipment to prevent the vibration from spreading according to the rigid connection. If possible, the dry-type transformer room can also be soundproofed and decorated, and sound-absorbing plates and silencing shutters can be used to improve the soundproofing capacity of the dry-type transformer room.Arachinovo,During the operation of the transformer, the resistance value of the grounding wire shall be measured accurately every two years.(I) the distance between the external contour of kV and below dry-type transformer and the surrounding guardrail or courtyard wall shall take into account the convenience of transportation and repair of dry-type transformer, and the distance shall not be less than m; At the angle with actual operation, a spacing of more than m shall be reserved; If metal fence is selected,ArachinovoHow much is 315 box transformer, the metal fence shall be grounded and a warning sign shall be hung at a prominent position.Espinal,What is the important role of power transformerSound, causing short circuit obstruction. If not handled properly, it will cause great damage.Careless maintenance and insulation damage


    ArachinovoS13-50 power transformerComplete variety



    Analysis of common faults of oil immersed transformer:The insulation of the through core anchor bolt clamping the iron core is damaged,Arachinovo315 KVA oil type transformer, resulting in a short circuit fault between the silicon steel sheet of the iron core and the through core anchor bolt;Dry type transformer oscillation is solved by applying vibration damping platform to dry-type transformer and carrying out low-frequency vibration reduction management, and then reduce the building structure noise transmitted by dry-type transformer oscillation.Scheme customization,Avoid inadvertent damage of insulation during maintenance: when repairing the hanging core of power transformer, special attention shall be paid to the maintenance of solenoid coil or insulating waterproof sleeve. If there is scratch damage, it shall be handled properly.The vibration reduction of collecting and townhouse solves the soft connection of collecting and townhouse. For the copper bar of the low-voltage bus of the equipment,ArachinovoApplication of dry-type transformer, the electromagnetic induced noise oscillation may be transmitted from the townhouse to the building structure. The core of noise reduction solution must be changed to copper wire connection.A specific part of dry-type transformer is the hanging core of dry-type transformer. The hanging core of dry-type transformer is a vital component. How to carry out the hanging core?


    ArachinovoS13-50 power transformerComplete variety



    Method and process of taking oil sample of power transformertarget,Power transformerWith Vietnam and Malaysia, China's first UHV transmission experimental demonstration project, China Transformer Corporation has entered a breakthrough in the development trend. The commodity voltage grade and volume rank first in the world, occupying the main technical position of the industry development trend. In addition, it has promoted the continuous improvement and perfection of the technology of low-voltage transformers.The insulation distance between the winding and the iron yoke of power transformer is much larger than that between the windings, most of the cables are in phase with the insulating cylinder (plate) in the middle of the winding, that is, the disconnection component of the electric field is small.Arachinovo,When leaving the factory the production and processing are not smooth and the sealing is poor. The common fault of oil leakage will be caused after the oil transformer is sealed for a period of time.After the test, connect the data signal contact of the automobile relay with the alarm circuit, the pull-in contact with the opening circuit, and adjust the overcurrent protection value.In fact, ground wire is not only a kind of grounding protection. The following describes in detail that ground wire is the general name of grounding system. Ground wire is divided into protective grounding and safety factor grounding device. Among them, anti electric shock grounding device and anti electromagnetic wave radiation grounding device. Protective grounding is to use it for loop to make the facilities achieve the grounding wire specified by the function.

    15An hour ago byWeb pagegreat  |   broadcast  |   comment   | Favorites
  12. BOGO WenjieLoss of power transformerHas a good driving effect

    In order to better carry out the experiment of power transformer oil, it is necessary to sample the power transformer oil. The sampling work should be carried out on a dry sunny day. The commonly used containers and sampling methods during sampling do immediate harm to whether the specific quality of the oil can be truly reflected. The oil sample for AC voltage withstand test shall not be less than .kg and the oil sample for simplified experiment shall not be less than kg.Power transformers are used in all walks of lifeBOGO Wenjie,It should be said that after the development trend of these years, the overall level of China's transformer industry at this stage is basically international, and the quality level is no different from that of overseas goods& rdquo; The person in charge of the transformer Federation of China Household Appliance Industry Association said.Dry type transformer manufacturerGroup,When we apply oil immersed transformer, we all know that it works with the help of oil. What if the oil immersed transformer is on fire? What countermeasures should we do?The zero line is mainly used in the working circuit. The voltage caused by the zero line is equivalent to the line resistance multiplied by the current of the working circuit. Because of the distance, the voltage caused by the zero line can not be ignored. As a countermeasure to maintain life safety, it is more and more unreliable. Ground wire (PE): it is not used as a working circuit, but only as a maintenance line. Use the affirmation of the earth & ldquo; ” Voltage. When the machine and equipment casing is electrified, the current will be quickly grounded. Even if there is a lead for the PE line, it will be grounded from the surrounding grounding body.What is the important role of power transformer


    BOGO WenjieLoss of power transformerHas a good driving effect



    If the power transformer stops running for more than h (if the allowable time should be reduced when the ambient humidity is & amp; gt; %), it should be insulated before putting into use, and accurately measured with a V grounding megger. The insulation resistance from the primary side to the secondary side and the ground should be ^ mfl, the insulation resistance from the secondary side to the ground should be ^ mh, and the insulation resistance from the iron core to the ground should be & amp; gt; mfl (note that the grounding device piece should be removed).Transformer manufacturerThe key reason for oil leakage is that there are defects in cast iron partsManagement Department,BOGO WenjieOil immersed transformer class,Dry type transformerThe method and whole process of taking oil sample of power transformer are as follows:During no-load test run, the transformer shall be connected with the working voltage from the switching power supply side, and then make the working voltage impulse closing.


    BOGO WenjieLoss of power transformerHas a good driving effect



    The manufacturing process of dry-type transformer is very process, and must be technically as a certain pillar. Only in that way, the performance of dry-type transformer will be more stable. What are the common manufacturing processes and steps of dry-type transformer?knowledge,Note: in the whole process of safety patrol inspection, the on-site operation and maintenance management staff must use temperature tester or thermal imager to carry out purposeful inspection on the transformer itself, terminal block and other accessories; The sound during the operation of the transformer is a symmetrical current sound. If the sound is found to be abnormal, or there is local sound, the cause shall be found immediately and certain effective measures shall be taken. If necessary,BOGO WenjieWaste power transformer, the load can be reduced or the operation of the transformer can be stopped.The grounding resistance of, high voltage and bottom voltage shall not be less than % (m & omega;) of the original value. The difference between the three-phase mean value of winding resistance measurement at the same temperature shall not exceed %, the tightening bolts are looseNoise solution of dry-type transformerThe flange surface is uneven, and the installation and processing process is wrong, so that the bolts are not tightened well, resulting in oil leakage.In the case of dry-type transformer operation, there is more noise,BOGO WenjieOil type power transformer, and some even cause noise, which seriously endangers everyone's no problem rest time and work. At this time, the dry-type transformer needs sound insulation treatment. There are many processes and key methods to deal with the noise of the common dry-type transformer. How should the noise of the dry-type transformer be solved? Or with the dry-type transformer manufacturer's network editor to simply understand it.

    17An hour ago byWeb pagegreat  |   broadcast  |   comment   | Favorites
  13. Carmen JaneHow much is a power transformerAlways in saturation

    The oil in the machinery and equipment of the oil storage tank shall generally stand for more than h before sampling; it is not necessary to stand when sampling on the running power transformer.& ldquo; of wiring transformer; Enter & rdquo; And & ldquo; Output & rdquo; Use a megger to test the grounding resistance between the terminal and the ground wire. When accurately measured by V megger, the resistance value exceeds m ohm bus.Carmen Jane,Protection mode for type selection of dry-type test transformerFrom the appearance, the packaging types are different. The transformer core and electromagnetic coil can be seen immediately for dry-type transformer, and only the shell can be seen for oil immersed transformer;Itaquaquecetuba,Noise solution of dry-type transformerAvoid aging and damage of power transformer iron core insulation: aging of iron core insulation or damage of waterproof sleeve holding anchor bolt will cause large vortex of iron core, and long-term scalding of iron core will lead to insulation aging.Oil leakage of bolt or pipe external thread


    Carmen JaneHow much is a power transformerAlways in saturation



    In relay protection dry-type transformer, it will affect the whole power circuitDuring the operation of the transformer if there is any problem at a certain point, the resistance value of the grounding wire shall be measured accurately every two years.Analysis of common faults of oil immersed transformer:Test conclusionHigh voltage fuse of transformer breaks one phase;For no-load impulse closing of transformer, pay attention to the following matters:For the leakage that has already occurred, find the leakage point first, which can not be ignored. For the position with serious leakage, shovel or sharp punch can be selected. The leakage point can be riveted with special tools for metal materials. After manipulating the leakage, the treatment surface shall be cleaned and tidy. Polymer composite materials are mostly selected for dry consolidation. After dry consolidation,Carmen JaneRecycling of old box transformer, the goal of long-term treatment of leakage can be achieved.


    Carmen JaneHow much is a power transformerAlways in saturation



    When using the oil sample of the power transformer in operation,Carmen JaneDifference between rectifier transformer and power transformer, it is necessary to add some oil from the oil gate valve at the lower part of the oil tank or the sampling gate valve to release about kg of waste liquid stored at the bottom to clean the oil inlet, and then take the oil sample.Discount,Carmen JaneDistribution 400 KVA transformer,The voltage regulating tap changer is not in place or poorWith Vietnam and Malaysia, China's first UHV transmission experimental demonstration project, China Transformer Corporation has entered a breakthrough in the development trend. The commodity voltage grade and volume rank first in the world, occupying the main technical position of the industry development trend. In addition, it has promoted the continuous improvement and perfection of the technology of low-voltage transformers.The noise of dry-type transformer is mainly the vibration noise in operation. This vibration noise is caused by multiple positions,When the manufacturer of the power transformer samples from the automobile oil tank, after opening the sealing cover, use the cleaned and dried rubber stopper to the oil. At the same time, clamp the branch pipe with your thumb, and loosen your thumb to make the oil enter the pipe,Dry type transformer manufacturerWhat is the important role of power transformer

    18An hour ago byWeb pagegreat  |   broadcast  |   comment   | Favorites
  14. BuvinicaHow much is a 35kV Power TransformerAnalysis of the cause of abnormal noise

    A zero line of the power transformer is connected with the working equipment. Since the voltage formed by the server during operation will be sent to the power transformer along with the cable, the power transformer will be transported and sent to the power consuming machines and equipment. What is the zero line of the actual power transformer? Let's introduce it to us.Due to careless transportation of the transformer and the thin high-voltage conductor,BuvinicaTransformer voltage, the transformer was disconnected by vibration (but there was no grounding device).Buvinica,Step up process of dry-type transformer?If the oil immersed transformer is burned by the cover of the transformer, when the oil immersed transformer fails, open the lower side of the transformer and place an appropriate part. When the oil immersed transformer is on fire, the oil cannot be released to avoid the occurrence of the oil immersed transformer. At the same time, the fire brigade must be notified.Abancay,If the volume of power transformer is too small, the transformer will be overloaded for a long time and it is easy to destroy machinery and equipment. Therefore, the rated capacity of the transformer should be selected according to the power consumption which is not suitable for too large or too small.Power transformers are used in all walks of lifeHow much is the power transformer


    BuvinicaHow much is a 35kV Power TransformerAnalysis of the cause of abnormal noise



    Avoid inadvertent damage of insulation during maintenance: when repairing the hanging core of power transformer, special attention shall be paid to the maintenance of solenoid coil or insulating waterproof sleeve. If there is scratch damage, it shall be handled properly.Protection mode for type selection of dry-type test transformerUse fiber materials to seal the bolts to achieve the goal of controlling leakage. The other is to screw out the bolt (nut), wipe the Fushi blue film remover on the surface, and then tighten it after wiping the raw materials on the surface. After drying,BuvinicaLow voltage transformer, the treatment goal can be achieved.High value,Wiring mode of dry-type transformer:Therefore, in the operation prevention and regulation of relay protection dry-type transformer, it is necessary to find the short-circuit fault point according to the fault situation, lock the fault point, and analyze the short-circuit fault types of relay protection dry-type transformer. At the same time, if all fields are clear, the maintenance work of employees will be carried out smoothly, and the harm will not expand to a greater extent.& ldquo; of wiring transformer; Enter & rdquo; And & ldquo; Output & rdquo; Use a megger to test the grounding resistance between the terminal and the ground wire. When accurately measured by V megger, the resistance value exceeds m ohm bus.


    BuvinicaHow much is a 35kV Power TransformerAnalysis of the cause of abnormal noise



    The representative mode of connection group of dry-type transformer is: English capital letters indicate the wiring on the primary side (or primary side), and English letters indicate the wiring on the secondary side (or secondary side). Y (or y) is star wiring, and D (or D) is triangular wiring.Product survey,How to reduce the failure of dry-type transformer?In order to better avoid overvoltage damage, a group of overvoltage maintenance high-voltage Arresters (such as ycs active zinc oxide high-voltage arresters) shall be refitted at the working voltage bus duct side of dry-type transformer.During no-load test run, the transformer shall be connected with the working voltage from the switching power supply side, and then make the working voltage impulse closing.Buvinica,Protective measures for damping of dry-type transformerAfter no-load test run is normal for h, it can be transferred to on-load operation, and the load shall be gradually increased from %, % and % by grade.The dry-type transformer is composed of two winding resistances,BuvinicaAmerican box transformer, resulting in four wiring groups: & ldquo; y, Y & rdquo;, & ldquo; D, Y & rdquo;, D & rdquo;. In China D & rdquo; and & ldquo; D, only & ldquo; y Y & rdquo; and & ldquo; y, D & rdquo; are selected. Because there are also two types of Y-connection with neutral line and without neutral line. If there is no neutral line, it will not be upgraded. All marks show that with neutral line, it will not be upgraded The letter N after the English letter Y indicates that the neutral line has transformer grounding wire. Yn wiring group, when UAB and UAB overlap, the minute hand points to . & ldquo; & rdquo; in the new wiring group, it is indicated by & ldquo; & rdquo.

    19An hour ago byWeb pagegreat  |   broadcast  |   comment   | Favorites
  15. IllindenDry type transformerAnalysis and application of preparation work before replacement

    () the installation position of secondary commercial insurance of transformer on column and ground shall meet the following requirements: if there is an disconnector on the secondary side, it shall be installed between the disconnector and low-voltage composite insulator,IllindenPrice of 100 KVA dry type transformer, or the circuit breaker shall be selected as the disconnector; If there is no disconnector on the secondary side, it shall be installed on both sides of the low-voltage composite insulator, and the insulated cable jumper shall be connected to the insulated cable on both sides of the circuit breaker.Oil immersed transformer companyIllinden,In fact, apart from the application of the Finance Bureau, the industry has been trying to formulate and upgrade transformer commodities according to the specifications, so as to promote the improvement of energy consumption level of transformer commodities.The time difference between different steps of three-phase power switch of switching power supply shall be less than ms, the closing shall be maintained by high-voltage arrester, and the neutral line of transformer shall be reliably grounded (it shall be grounded immediately).Brandys nad Labem-Stara Boleslav,When the manufacturer of the power transformer samples from the automobile oil tank, after opening the sealing cover, use the cleaned and dried rubber stopper to the oil. At the same time,IllindenHow much is a 50 KVA box transformer, clamp the branch pipe with your thumb, and loosen your thumb to make the oil enter the pipe,Noise pollution control and prevention measures of dry-type transformerThe key reason for oil leakage is that there are defects in cast iron parts


    IllindenDry type transformerAnalysis and application of preparation work before replacement



    With the rapid development of society and the continuous development trend of computers, the calculation of data in the whole process of oil immersed transformer wave has long had results. Only effective selection of calculation entity models and methods is needed, the accuracy of calculation conclusions can meet the needs of architectural design, and scientific and reasonable data method is selected, Not only can the current distribution of the oil immersed transformer be clearly defined in the development stage, but also the winding and other structures of the oil immersed transformer can be effectively arranged and distributed in a certain scope, which greatly facilitates the design scheme of the oil immersed transformer and ensures the stability of operation.What is the cause of power transformer core failure?In the whole process of transmitting electromagnetic energy in the power supply system, it will inevitably cause the loss of voltage and output power. When transporting the same output power, the voltage loss is inversely proportional to the voltage, and the output power loss is inversely proportional to the square meter of voltage. The transformer is used to increase the voltage and reduce the closing damage.Fair price,What is the reason for the shutdown of power transformer?The capacity and working voltage are different. The dry-type transformer is generally suitable for distribution equipment. The capacity is generally below kVA and the working voltage is below KV, which also ensures the rated voltage of kV; Oil immersed transformers are generally suitable for distribution equipment.How to reduce the failure of dry-type transformer?


    IllindenDry type transformerAnalysis and application of preparation work before replacement



    In the whole process of transmitting electromagnetic energy in the power supply system, it will inevitably cause the loss of voltage and output power. When transporting the same output power the voltage loss is inversely proportional to the voltage, and the output power loss is inversely proportional to the square meter of voltage. The transformer is used to increase the voltage and reduce the closing damage.Quality improvement,The heat discharge pipe of heat pipe radiator is generally made of slotted seamless steel pipe after flattening by stamping die. When the heat discharge pipe is bent and welded by electric welding, such as discoloration, deformation offset, cracking,IllindenProduction technology of oil immersed transformer, loosening, ignition smoke, oil leakage, broken strand disconnection, hanging of dirty things, etching and turbidity, which can be inspected according to the visual inspection method. Therefore, visual inspection is one of the common methods of equipment inspection.How much is the power transformerIllinden,Wiring mode of dry-type transformer:Therefore, in the installation process of substation equipment, the lightning rod should be set according to the specific situation to prevent damage to the relay protection dry-type transformer caused by lightning. In addition, in the installation and use process of lightning rod, select reasonable types of lightning rod according to the operation situation to determine that they are in the same situation. In addition during the installation of lightning rod, please connect all routes as far as possible to prevent other faults.If the volume of power transformer is too small, the transformer will be overloaded for a long time and it is easy to destroy machinery and equipment. Therefore, which is not suitable for too large or too small.

    20An hour ago byWeb pagegreat  |   broadcast  |   comment   | Favorites
  16. RaysonOil immersed transformerManufacturers seize product quality and expand sales

    There are also many problems to pay attention to in the preventive measures and process of dry-type transformer damping. What are the key effects and functions of dry-type transformer damping and the corresponding preventive measures? Let's master and consult in detail with the small editor of the dry-type transformer manufacturer.Before no-load impact closing, the pose period of overcurrent protection shall be set to zero, and the data signal circuit of steam vehicle relay shall be temporarily connected to the pull-in circuit.Rayson,It is understood that in China, transformers have experienced the whole process of replacing many series products such as sss. As early as the middle and late s, S Series lossless distribution transformers were selected in China to replace the high energy consumption transformers of jb- and jb - Specifications operating in the power network at that time. Since the th century urban power grids have been transformed all over the country, and S series distribution transformers have been used to replace S Series. In recent years, S and S commodities are gradually selected in large quantities in the transformation of urban and rural power networks in China, and their full load loss is % - % less than that of S transformer.In order to better carry out the experiment of power transformer oil, it is necessary to sample the power transformer oil. The sampling work should be carried out on a dry sunny day. The commonly used containers and sampling methods during sampling do immediate harm to whether the specific quality of the oil can be truly reflected. The oil sample for AC voltage withstand test shall not be less than .kg, and the oil sample for simplified experiment shall not be less than kg.Bukama,Wiring mode of dry-type transformer:When the manufacturer of the power transformer samples from the automobile oil tank, after opening the sealing cover, use the cleaned and dried rubber stopper to the oil. At the same time, clamp the branch pipe with your thumb, and loosen your thumb to make the oil enter the pipe,The noise of dry-type transformer belongs to low-frequency noise. In a small area, most of it is scattered according to the building structure. This kind of low-frequency noise is scattered to the household house according to the house building, and then causes gas vibration noise, which is then scattered to the ears of consumers. Although the amount of noise is not very large, the dispersion spacing and adverse effects are very large.


    RaysonOil immersed transformerManufacturers seize product quality and expand sales



    The electromagnetic coil is wound with copper power wire or foil and lifted with glass fiber. The epoxy adhesive does not need filling. The vacuum drying equipment is used for degassing and dehumidification. The overall concrete is poured with high fracture toughness, resistance to short-circuit faults, common faults and impact. The work is diligent.With Vietnam and Malaysia, China's first UHV transmission experimental demonstration project, China Transformer Corporation has entered a breakthrough in the development trend. The commodity voltage grade and volume rank first in the world, occupying the main technical position of the industry development trend. In addition, it has promoted the continuous improvement and perfection of the technology of low-voltage transformers.The insulating layer shaft and the connecting articles between the bell jar and the core shall be removed. If it is a hanging bell inspection, the oil shall be pumped into the bottom of the bell jar before the bell jar can be removed.assets,The input and output three-phase power lines shall be connected to phase a, green and red bus duct of transformer terminal board. The zero line shall be connected to the neutral zero line of transformer voltage,RaysonPower transformer parameters, and the grounding wire, transformer casing and its transformer point shall be connected to each other. At ordinary times, the ground wire and zero wire are led out by the neutral wire of the transformer. (for example,RaysonHow much is a box transformer, including the vibration of magnetic induction electromagnetic coil. All pay great attention to the solution of vibration when carrying out noise control.When using the oil sample of the power transformer in operation, it is necessary to add some oil from the oil gate valve at the lower part of the oil tank or the sampling gate valve to release about kg of waste liquid stored at the bottom to clean the oil inlet,The insulating layer shaft and the connecting articles between the bell jar and the core shall be removed. If it is a hanging bell inspection, the oil shall be pumped into the bottom of the bell jar before the bell jar can be removed.It can be seen from the above that from the perspective of power saving, in some cases, transformers & ldquo; A small horse pulls a small car & rdquo; Can't compare with & ldquo; Middle car & rdquo;, Even less than & ldquo; Great Lars, little dragons & rdquo;, Therefore, the loss of transformer full load and load must be considered in the calculation, and the results can be properly made in terms of power saving or power consumption. According to the correlation between the load rate and the transformer capacity: . The transformer load rate and power saving will be brought into the formula: the load index of the transformer, that is,RaysonWhat is the principle of power transformer, the operating load and rated capacity of the transformer . Now it is illustrated by examples that both sides of the acadc al electron touch toe ground type seek the derivative of P and then reduce the active power loss of the large capacity transformer from the active power loss of the small capacity transformer: that is, the formula is reduced The load index is the load index when the transformer operation loss is small and the rate is large, and the rate is large when the specific copper loss is equivalent to iron loss.For no-load impulse closing of transformer, pay attention to the following matters:Rayson,Gradually, high-frequency vibration damping mechanical equipment, such as low-frequency vibration damping platform is installed at the bottom of the dry-type transformer, which can reduce the downward dispersion of the vibration of the dry-type transformer. Then replace the connection between the dry-type transformer and the surrounding engineering buildings roads, or use elastic yellow shock absorption mechanical equipment to prevent the vibration from spreading according to the rigid connection. If possible, the dry-type transformer room can also be soundproofed and decorated, and sound-absorbing plates and silencing shutters can be used to improve the soundproofing capacity of the dry-type transformer room.Equipped with a temperature controller, platinum thermistor (pt) is placed beside the embedded hole on the top of the low-voltage solenoid coil to test the winding resistance temperature rise of the transformer, stop the cooling centrifugal fan, set up common problem alarm, overtemperature alarm and overtemperature tripping effect, and provide reliable overvoltage protection machinery and equipment for the dry test transformer, so as to test the safety performance of the transformer operation.Therefore, in the installation process of substation equipment, the lightning rod should be set according to the specific situation to prevent damage to the relay protection dry-type transformer caused by lightning. In addition, in the installation and use process of lightning rod, select reasonable types of lightning rod according to the operation situation to determine that they are in the same situation. In addition, during the installation of lightning rod, please connect all routes as far as possible to prevent other faults.

    21An hour ago byWeb pagegreat  |   broadcast  |   comment   | Favorites
  17. DelcevoPower transformerThe market has a strong atmosphere

    When the transformer is out of phase, if the second phase is blocked, there is still no sound when the second phase is sent, and there is sound when the third phase is sent; If the third phase is blocked, the sound will not change, as in the case of the second phase. There are three reasons for phase deficiency:The input and output three-phase power lines shall be connected to phase a, phase B and phase C respectively according to the color of yellow, green and red bus duct of transformer terminal board. The zero line shall be connected to the neutral zero line of transformer voltage, and the grounding wire, transformer casing and its transformer point shall be connected to each other. At ordinary times, the ground wire and zero wire are led out by the neutral wire of the transformer. (for example the transformer box shall be matched with the ground wire mark of the shell and connected with each other). Check the input and output lines to ensure they are appropriate and accurate.Delcevo, only a few companies in China could produce kV high-voltage transformersAt that time, and the market share of high-voltage transformers was basically monopolized by overseas leaders.kV and above & plusmn; No load of rated voltage; Part of the circuit breaker of the tap power switch is installed in the phenolic resin insulating paper cylinder, and the insulating paper cylinder is installed on the wooden frame. The actual operation rocker is connected with the dynamic circuit breaker of the tap power switch according to the wooden insulating rod. The on load tap off power switch is insulated from the ground by the insulating paper cylinder of the power switch itself and the insulating limit.Batangafo,Due to careless transportation of the transformer and the thin high-voltage conductor, the transformer was disconnected by vibration (but there was no grounding device).Avoid inadvertent damage of insulation during maintenance: when repairing the hanging core of power transformer, special attention shall be paid to the maintenance of solenoid coil or insulating waterproof sleeve. If there is scratch damage, it shall be handled properly.The vibration reduction solution of cable bridge is to modify the hard connection between bus bridge and dry-type transformer, and the vibration reduction solution is made at the cable bridge.


    DelcevoPower transformerThe market has a strong atmosphere



    Dry type transformer factoryThe equipment can eliminate the shortcomings found in the patrol inspection, clean the porcelain waterproof casing casing, remove and replace the cracked or brittle leather pad, check and tighten the node, replenish the oil with less oil, check and replace the silica gel of the breathing mask,DelcevoPower transformer test report, etc.What is the reason for the shutdown of power transformer?Analysis project, capacitance and resistor. The accuracy of those basic parameters does great harm to the calculation results of the whole wave process. For the inductance calculation, the good model is the solid model of infinite transformer core column, but there are many calculation methods.Avoid aging and damage of power transformer iron core insulation: aging of iron core insulation or damage of waterproof sleeve holding anchor bolt will cause large vortex of iron core and long-term scalding of iron core will lead to insulation aging.The whole process of hanging the core of dry-type transformer is more critical, and there are many situations that the hanging core of dry-type transformer must pay special attention to. Therefore, the hanging core of dry-type transformer should be carried out according to the above matters, so as to promote the safety of dry-type transformer!


    DelcevoPower transformerThe market has a strong atmosphere



    After the test, connect the data signal contact of the automobile relay with the alarm circuit, the pull-in contact with the opening circuit, and adjust the overcurrent protection value.Marketing Department, causing short circuit obstruction. If not handled properly, it will cause great damage.Several detection methods for installing transformerCauses of fire in power transformerDelcevo,DelcevoHandover test contents of dry-type transformer, there are empty welding, open welding, needle holes, sand holes and other shortcomings in welding. The oil transformer is easy to be covered with welding powder and paint when leaving the factory,DelcevoDry type or oil immersed transformer for box transformer, and the potential safety hazards are exposed after operation. In addition, the electromagnetic induction vibration will crack the electric welding and lead to leakage.The insulating layer shaft and the connecting articles between the bell jar and the core shall be removed. If it is a hanging bell inspection, the oil shall be pumped into the bottom of the bell jar before the bell jar can be removed.The voltage regulating tap changer is not in place or poor

    22An hour ago byWeb pagegreat  |   broadcast  |   comment   | Favorites
  18. negotiation25kV power transformerWhat common sense needs to be understood

    If you want to check the activated carbon fiber for the hanging cover, first take out the low-voltage waterproof sleeve and the on load transformer power switch, then lower the bell cover anchor bolt of the large cover, slowly hang the galvanized steel wire rope with sufficient lifting net weight on the commonly used earrings, wear round steel from top to bottom in the surrounding screw holes, and count the spacing and specifications for easy reinstallation. At the same time, the cable wind shall be added on all sides to ensure that the core international body will not be damaged during the whole lifting process. After lifting for mm, stop the lifting, stabilize the bell cover, and check the bearing capacity of the lifting core,negotiationS13-m-200 power transformer, center of gravity and Jack. After everything is normal, lift it again until the bell cover exceeds the relative height of the body, and rotate the crane to place the bell cover on the clean skid.Power transformers are also used for testing, which are called test power transformers. They can be divided into inflatable, oil transformer dry test and other test power transformers. They are the basic test equipment for communication AC compression test for many consumers such as power stations, power supply bureaus and scientific research institutions. According to the specifications of the Bureau of quality supervision, It is used to carry out insulation compressive strength test under required current for various electrical products, electrical components and insulating raw materials.negotiation,Automatic system of centrifugal fan: measure the temperature data signal according to the PT thermistor temperature measuring resistor of the embedded parts at the hot part of the bottom pressure winding. The transformer load expands and the operating temperature increases. When the winding temperature reaches ℃, the system software automatically starts the centrifugal fan for refrigeration; When the winding temperature is as low as ℃, the system software will automatically terminate the centrifugal fan.Seal oil leakageIkirun,The sampling container is a colorless glass bottle with a wide mouth ground glass plug with a volume of .kg or kg. - bottles shall be collected at a time for analysis and experiment. Labels shall be attached during sampling. Pay attention to the name, source, weather conditions and other materials of the oil sample.Use fiber materials to seal the bolts to achieve the goal of controlling leakage. The other is to screw out the bolt (nut), wipe the Fushi blue film remover on the surface, and then tighten it after wiping the raw materials on the surface. After drying, the treatment goal can be achieved.Wiring mode of dry-type transformer:


    negotiation25kV power transformerWhat common sense needs to be understood



    When the whole process of winding wave of oil immersed transformer is calculated by using the marking method, the winding of oil immersed transformer is generally divided into multiple modules, and each module is replaced by an equivalent circuit, and its power circuit includes an inductance and vertical capacitance, a capacitance to ground or capacitance between windings, They also have mutual inductors between the inductors of each module and collect the chain Internet as the equivalent power circuit of oil immersed transformer. The precision of the conclusion can completely meet the needs of practical projects.With Vietnam and Malaysia, China's first UHV transmission experimental demonstration project, China Transformer Corporation has entered a breakthrough in the development trend. The commodity voltage grade and volume rank first in the world, occupying the main technical position of the industry development trend. In addition, it has promoted the continuous improvement and perfection of the technology of low-voltage transformers.Causes of fire in power transformerresources,negotiationQuotation for oil immersed transformer,The clock expression is used to indicate the phase difference correlation of the working voltage of the secondary side line. The phasor of the working voltage of the primary side line is used as the minute hand,negotiationMaintenance standard of dry type transformer, the fixed finger is at o'clock, and the phasor of the phase voltage of the secondary side is used as the second hand.When the new oil filled by the power transformer and the oil sample that has just been considered are used, the oil sample can be used only after sufficient standing.The manufacturing process of dry-type transformer is very process, and must be technically as a certain pillar. Only in that way, the performance of dry-type transformer will be more stable. What are the common manufacturing processes and steps of dry-type transformer?


    negotiation25kV power transformerWhat common sense needs to be understood



    Power transformers are also used for testing, which are called test power transformers. They can be divided into inflatable, oil transformer, dry test and other test power transformers. They are the basic test equipment for communication AC compression test for many consumers such as power stations, power supply bureaus and scientific research institutions. According to the specifications of the Bureau of quality supervision, It is used to carry out insulation compressive strength test under required current for various electrical products, electrical components and insulating raw materials.Quality recommendation, its output voltage is directly proportional to the coil turn ratio of the output input solenoid coil. If a rechargeable battery is used, because it is DC, add a circuit in the input power supply circuit to change it into a continuously changing voltage. In that way, the alternating DC current can be obtained at the output end.Noise solution of dry-type transformernegotiation,The manufacturing process of dry-type transformer is very process and must be technically as a certain pillar. Only in that way, the performance of dry-type transformer will be more stable. What are the common manufacturing processes and steps of dry-type transformer?& ldquo; of wiring transformer; Enter & rdquo; And & ldquo; Output & rdquo; Use a megger to test the grounding resistance between the terminal and the ground wire. When accurately measured by V megger, the resistance value exceeds m ohm bus.The dry-type transformer is composed of two winding resistances, resulting in four wiring groups: & ldquo; y, Y & rdquo;, & ldquo; D, Y & rdquo;, & ldquo; y, D & rdquo; and & ldquo; D, D & rdquo;. In China, only & ldquo; y, Y & rdquo; and & ldquo; y, D & rdquo; are selected. Because there are also two types of Y-connection with neutral line and without neutral line. If there is no neutral line, it will not be upgraded. All marks show that with neutral line it will not be upgraded The letter N after the English letter Y indicates that the neutral line has transformer grounding wire. Yn wiring group, when UAB and UAB overlap, the minute hand points to . & ldquo; & rdquo; in the new wiring group

    23An hour ago byWeb pagegreat  |   broadcast  |   comment   | Favorites
  19. Beba 33kV power transformerProduct selection and use cheats
    the transformer will be overloaded for a long time and it is easy to destroy machinery and equipment. Therefore, the rated capacity of the transformer should be selected according to the power consumption, which is not suitable for too large or too small.Due to poor sealing, generally, the sealing of box edge and machine cover is sealed with acid-base resistant rubber rod or rubber plate. If the joint is not solved well, it will lead to common faults of oil leakage.Beba Transformer manufacturerPower transformerMontana,If the oil immersed transformer is burned by the cover of the transformer, when the oil immersed transformer fails, open the lower side of the transformer and place an appropriate part. When the oil immersed transformer is on fire, the oil cannot be released to avoid the occurrence of the oil immersed transformer. At the same time, use detection equipment to put out the fire immediately. In order not to expand the hazard, and must be technically as a certain pillar. Only in that way, the performance of dry-type transformer will be more stable. What are the common manufacturing processes and steps of dry-type transformer?Transformer manufacturers said that at this stage, China's energy-saving distribution transformer market is relatively scattered, coupled with the constraints of factors such as low threshold in the field uneven companies, and inadequate technical innovation, resulting in slow marketing of energy-saving transformers.When the screw of the through core extruder holding the iron core of the transformer is loose there are screw cap parts left on the iron core, or small metal materials fall into the transformer, the transformer will send out & ldquo; Ding Ding Dang & rdquo; Or & ldquo; Call & hellip; Call & hellip& rdquo; Blowing sound and its & ldquo; Squeak, squeak & rdquo; It's like a magnet sucking a small washer, while the working voltage, current and temperature of the transformer are all normal. Such conditions generally do not endanger all normal operation of the transformer, and can be solved until power failure.new product,When using the oil sample of the power transformer in operation, it is necessary to add some oil from the oil gate valve at the lower part of the oil tank or the sampling gate valve to release about kg of waste liquid stored at the bottom to clean the oil inlet, and then take the oil sample.On load commissioning:After no-load test run is normal for h, it can be transferred to on-load operation, and the load shall be gradually increased from %, % and % by grade.


    Beba 33kV power transformerProduct selection and use cheats



    After the test, connect the data signal contact of the automobile relay with the alarm circuit, the pull-in contact with the opening circuit, and adjust the overcurrent protection value.retailer,Oil leakage of cast iron partsThe grounding resistance of, high voltage and bottom voltage shall not be less than % (m & omega;) of the original value. The difference between the three-phase mean value of winding resistance measurement at the same temperature shall not exceed %, which shall not exceed % compared with the last accurate measurement result.Due to careless transportation of the transformer and the thin high-voltage conductor,Beba 4000kva power transformer, the transformer was disconnected by vibration (but there was no grounding device).Beba ,Beba 220 kV Transformer,Loose core screwWhen leaving the factory, the production and processing are not smooth and the sealing is poor. The common fault of oil leakage will be caused after the oil transformer is sealed for a period of time.The zero line is mainly used in the working circuit. The voltage caused by the zero line is equivalent to the line resistance multiplied by the current of the working circuit. Because of the distance, the voltage caused by the zero line can not be ignored. As a countermeasure to maintain life safety, it is more and more unreliable. Ground wire (PE): it is not used as a working circuit,Beba Price of dry-type transformer, but only as a maintenance line. Use the affirmation of the earth & ldquo; ” Voltage. When the machine and equipment casing is electrified, the current will be quickly grounded. Even if there is a lead for the PE line, it will be grounded from the surrounding grounding body.

    05052024531080909am24 08:35 byWeb pagegreat  |   broadcast  |   comment   | Favorites
  20. OxfordRecycling power transformerWhat are the technical parameters of

    Dry type transformerFault judgment of power transformerOxford,The rate of transformer is: n = P / pxo%, that is, the rate is very large. Therefore, the load of transformer is: = P / PK. Fully consider the active power loss caused by reactive power in the system software during transformer operation. The load adjustment is: it can be seen from the calculation of load formula that the large rate of transformer does not occur when the load is full, Generally, it is about %, but when selecting the transformer capacity, we should select effective transformers according to the load condition and load, so as to make the transformer in the situation of economic development and achieve the goal of power saving.High voltage fuse of transformer breaks one phase;Gbadolite,The vibration reduction of the grounding device sheet solves the problem of modifying the fixed hard connection between the copper sheet of the grounding device and the dry-type transformer. The original oscillation of the dry-type transformer will be transmitted to the metal in the concrete by the baffle and cause low-frequency noise. Therefore, it must also be changed to produce flexible connection.When the manufacturer of the power transformer samples from the automobile oil tank, after opening the sealing cover, use the cleaned and dried rubber stopper to the oil. At the same time,OxfordOil type power transformer, clamp the branch pipe with your thumb,After tightening the loose bolts, seal the flange, and solve the bolts that are likely to leak, so as to achieve the goal of complete treatment. Tighten the loose bolts strictly according to the actual operation and processing technology.


    OxfordRecycling power transformerWhat are the technical parameters of



    Careless maintenance and insulation damageTransformer manufacturers said that at this stage, China's energy-saving distribution transformer market is relatively scattered, coupled with the constraints of factors such as low threshold in the field, uneven companies, lack of evaluation and specifications, and inadequate technical innovation, resulting in slow marketing of energy-saving transformers.It will also produce many faults, effectively deal with various faults of oil immersed transformer, make full use of the performance indicators and advantages of oil immersed transformer, and continuously improve the safety factor of oil immersed transformer. Ignition is a common fault of oil immersed transformer. The key fault of oil immersed transformer is short-circuit fault,The iron core of power transformer is made of high-quality crystallized hot-rolled ferrite core, which is stacked at the degree fully inclined multi-step interface. The surface is covered with epoxy resin adhesive cable sheath coating, which is resistant to corrosion and rust, and has sound insulation and noise reduction.Deterioration damage of transformer core insulationThe project cost is different. Compared with the purchase price of capacity transformer, the purchase price of dry-type transformer is much higher than that of oil immersed transformer.


    OxfordRecycling power transformerWhat are the technical parameters of



    Due to poor sealing generally, the sealing of box edge and machine cover is sealed with acid-base resistant rubber rod or rubber plate. If the joint is not solved well, it will lead to common faults of oil leakage.Inspection items,The power transformer is designed according to the temperature protection scheme. The embedded parts in the material layer of high (low) pressure electromagnetic coil poured with integral concrete are provided with longitudinal ventilation duct, which can be equipped with air-cooled machinery and equipment (cooling centrifugal fan). After selecting air-cooled machinery and equipment,OxfordProtection grade of oil immersed transformer, the output capacity can be increased by %.The transformer manufacturer said that the temperature display equipment: the temperature change value is measured according to the PT temperature sensor embedded in the bottom voltage winding to immediately indicate the winding temperature of each phase (three-phase safety inspection and Zui large value indication and the historical time Zui high temperature can be recorded). The Zui high temperature can be input and output as mA analog quantity. If it is to be far away (the distance can reach m, the electronic computer can be equipped with an electronic computer socket,OxfordHigh efficiency and energy saving power transformer, an intelligent transmitter, and transformers can be detected. The over temperature alarm and trip of the system software can also be signaled by the resistor data of Pt thermistor sensor so as to further improve the stability of the temperature maintenance system software.Sound, causing short circuit obstruction. If not handled properly, it will cause great damage.Oxford,What is the reason for the shutdown of power transformer?The conductor insulation of power transformer is the main part of internal insulation. Some conductors should pass through the middle of electromagnetic coil, or between electromagnetic coil, iron yoke clamp and automobile oil tank wall. Therefore, it is necessary to ensure that this kind of conductor has sufficient insulation compressive strength, i.e. insulation spacing.When using the oil sample of the power transformer in operation, it is necessary to add some oil from the oil gate valve at the lower part of the oil tank or the sampling gate valve to release about kg of waste liquid stored at the bottom to clean the oil inlet, and then take the oil sample.

    05052024531050909am24 05:08 byWeb pagegreat  |   broadcast  |   comment   | Favorites