does not require preparations outside the construction site, does not require any equipment, is convenient and fast ( times faster than the traditional welding method), is simple to fix the grouting pipe to the reinforcement cage, and is not affected by the bad weather.However, not all grouting pipe products can achieve this effect. Some inferior grouting pipe products not only fail to achieve the expected effect in use, but also have problems such as low grouting efficiency, pipe burst and pipe bending, which seriously affect the grouting effect of the grouting pipe and the progress of the whole project. The quality of grouting effect comes from the selection of high-quality grouting pipe products. Shengpeng grouting pipe is a good choice for you to choose grouting pipe products because of its high strength, awesome, simple connection and high cost performance! Grouting pipe the grouting pipe is a kind of geosynthetic material formed by ultrasonic welding, ribbed steel strip, stainless steel strip, reinforced concrete strip, etc.) and flexible reinforcement (polypropylene strip, plastic grouting pipe, etc.). Because of its high tensile strength, low elongation (≤ %), small creep, and strong interlocking and occlusive effect on the soil, it can effectively treat the soft soil foundation, restrict the lateral displacement of the soil, overcome the uneven settlement of the soil, greatly enhance the bearing capacity of the foundation and improve the overall performance of the foundation; It can be widely used in road engineering, railway engineering, retaining structure, dam engineering, water conservancy engineering and tunnel engineering; It has remarkable safeguard effect and good social and economic benefits against rutting and pavement cracking.Neustadt, It has good impact resistance and high fracture elongation. Experience has proved that it can resist the impact of natural disasters such as earthquakes.In recent years, there have been frequent natural disasters, such as mountain slides, floods earthquakes, etc. we are so small in the face of natural disasters that we can only devote our efforts to normal prevention and post disaster rescue. The grouting pipe can reduce the damage caused by these natural disasters.Grouting pipe is an expert in road construction. It can connect the subgrade as a whole and improve the bearing capacity of the subgrade. When encountering natural disasters, so that we can save more people in the rescue work. The grouting pipe can also play a great role in slope protection. The use of the grouting pipe can well prevent the landslide of mountain soil and debris flow disasters. Through many years of practical experience, it has been proved that the roads that usually use the grouting pipe are far more than the same period of projects in terms of service life and quality. Thus reducing the casualty rate. Grouting pipe is a kind of excellent geosynthetics used for Pavement Reinforcement, old road reinforcement, subgrade reinforcement and soft soil foundation reinforcement. It has become an irreplaceable material in the application of asphalt pavement reflection crack treatment. This product is a semi-rigid product made of high-strength alkali free grouting pipe, which is made of mesh base material through internationally advanced warp knitting process and surface coating treatment. It has high tensile strength and low elongation in both longitude and latitude, and has excellent properties such as high temperature resistance, low cold resistance, aging resistance and corrosion resistance. It is widely used in asphalt pavement, cement pavement and subgrade reinforcement, railway subgrade, embankment slope protection, airport runway, sand prevention and control projects. Grouting pipe laying and fixing of grouting pipe laying of glass fiber grouting pipe can be carried out by special equipment refitted from tractors or automobiles, or manually.B é tar é Oya,The grouting pipe diffuses the load on it. When the reinforced soil is loaded, the grouting pipe has a high bond with the soil, and has a mutual embedding effect with the soil, showing better tensile performance. The tensile stress of the soil is transmitted to the grouting pipe, making the reinforced soil a tensile member, which can change the stress from the vertical direction to the horizontal direction, spread the load stress evenly to a large base range, enhance the overall tensile strength of the soil, and effectively improve the stress distribution of the pavement structure. The strength of high tensile reinforced soil is far higher than that of unreinforced soil, it can measure it and accurately reflect the data on the computer or sound receiver. During the concrete pouring of cast-in-place pile but this small pipe meets the standard sensitivity of sound reception. As long as there is a small sound, a channel that allows the ultrasonic probe to be normally placed at the pile bottom is reserved, which is not considered in the structural stress calculation.In limestone area, the punching is not good, and it is difficult to sink the reinforcement cage. When the grouting pipe is deformed and blocked by unconventional means, the pipe is blocked due to the workers carelessness and falling into small concrete blocks. The deformation and blockage of the grouting pipe bring great difficulties to the detection work, and even can not be detected. Therefore, when the grouting pipe is found blocked after the foundation pile is poured and before the inspection, effective measures should be taken to pass the pipe to ensure the smooth progress of ultrasonic inspection. Generally, there are three methods for passing the pipe: stabbing the grouting pipe with thick and long reinforcement, flushing and pigging with high-pressure water,NeustadtSmall conduit support, and using a drill with a small drill to clean the hole.
How heavy is a grouting pipe? When lifting and demoulding components, the concrete strength must meet the design requirements. When there are no special requirements in the design, the non prestressed members shall not be less than % of the designed standard value of concrete cube compressive strength, and the prestressed members shall not be less than % of the designed standard value of concrete cube compressive strength.The grouting pipe diffuses the load on it. When the reinforced soil is loaded, the grouting pipe has a high bond with the soil, and has a mutual embedding effect with the soil, showing better tensile performance. The tensile stress of the soil is transmitted to the grouting pipe, making the reinforced soil a tensile member, which can change the stress from the vertical direction to the horizontal direction, spread the load stress evenly to a large base range, enhance the overall tensile strength of the soil, and effectively improve the stress distribution of the pavement structure. The strength of high tensile reinforced soil is far higher than that of unreinforced soil, greatly improving the bearing capacity of the soil.Where to sell API, The small editor of the grouting pipe reminds everyone that there should be no rust, water and other impurities when using the prestressed machinery. The working clip can be used after removing the foam in the packing box and the grouting pipe should be properly kept. However, when the prestressed tendon is long and the grouting pipe needs to be tensioned repeatedly, it is suggested that a small amount of lubricant (e.g. anchor pulling spirit) be applied to the tapered hole of the anchor plate by the prestressed machine, which is not only conducive to the follow-up and anchor pulling of the working clip, but also conducive to the multiple grouting of the grouting pipe; Apply lubricant on the outer surface of the tool clip and the inner and outer surfaces of the taper hole of the anchor plate before use, and regularly remove the debris on the clip surface to make the anchor flexible. However, when the clip is cracked or the tooth surface is damaged, it needs to be replaced and can not be used again.Answer: Yes, the elastic extension speed of the grouting pipe can be defined within a certain range in the design, but for a grouting pipe that has been designed, its elastic extension speed is certain.Grouting pipe grouting pipe manufacturer clamp type grouting pipe grouting pipe price grouting pipe spot grouting pipe specification grouting pipe model grouting pipe raw material for grouting pipe grouting pipe is processed by welded pipe or spiral steel pipe, and grouting pipe processed by seamless steel pipe is generally rare in the market. The reasons are as follows: first,NeustadtGrouting pipe leading small conduit, in terms of price, generally, the cost of grouting pipes made by welding is relatively low, which is easy for purchasers to accept. The cost of domestic products made of spiral steel pipes and seamless steel pipes is too high. Second, in terms of processing technology, welded pipes are relatively easy to process, and the equipment required is relatively simple. If spiral steel pipes and seamless steel pipes are processed, the process is relatively complex. Manufacturing process and characteristics of clamp down grouting pipe clamp down grouting pipe is a kind of grouting pipe. Because only professional hydraulic clamps are required for connection it is also commonly called clamp down grouting pipe. The clamp grouting pipe has the following characteristics: the connection of the grouting pipe is simple, as long as the hydraulic clamp is required for connection. The grouting pipe has joints at both ends of the clamp type grouting pipe,NeustadtAdvanced small conduit processing, which avoids the possibility of loosening and has good seismic resistance. Several common failures in the installation of grouting pipes always have many problems when using grouting pipes for work. In order to enable everyone to provide production to the factory normally, we have specially summarized the following failures that will occur when using grouting pipes. If you have problems in the following examples, you will know how to solve them The first point is that if the joint, nozzle or bottom of the grouting pipe is not tightly sealed, it will be blocked by cement slurry during construction. At this time, it is OK to check the sealing The second point is that the joint is misaligned or deformed during installation. At this time, we need to know that it is caused by the thin material selected. The above two points are common problems in the installation of grouting pipes that are not suitable for the current location. Wed better remember these points of attention so that when they occur in the future, we will know how to deal with them to ensure a quick solution! The grouting pipe joint or the pipe orifice and the pipe bottom are not sealed tightly, so please bring in mud or cement slurry during the construction process to block the pipe: during the installation and grouting of the grouting pipe, the rebar is distorted or collided, causing the dislocation and deformation of the grouting pipe joint or the deformation of the pipe wall. The main reason for this is the selection of thin-walled grouting pipes.
Glass fiber grouting pipe is a semi-rigid product made of glass fiber as raw material, high-strength alkali free glass fiber through a certain warp knitting process, and fiber filament coated on both sides.knowledge, The grouting pipe is a patented product. Compared with similar products in the market, it has higher tensile resistance and better sealing performance.[claim] A fast cutting device in a hole of a underground grouting pipe, which is characterized in that the fast cutting device in the hole mainly consists of a fixed cutting device , a tension blade device and a cutting rotating device . The tension blade device is sleeved in the cutting rotating device , and screw threads are respectively set on the outer surface of the cutting rotating device and the upper end of the tension blade device , The tension blade device and the cutting rotating device are connected by threads. The tension blade nut is arranged at one end of the tension blade device protruding from the cutting rotating device. The fixed cutting device is mainly composed of a cutting blade and a pulley . The cutting blade and the pulley are respectively connected to both sides of the cutting rotating device through slots. Flange plates (I) and bearings are arranged on the outer surface of the cutting rotating device The fast cutting device in the hole is installed in the grouting pipe hole through a flange plate, and the fixed cutting device is connected with the flange plate through bolts.It is required to ensure that at least one embedded reinforcement is firmly welded with the anchor ring of maolehan grouting pipe within every meter along the joint direction. The quality of XF type grouting pipe should be carefully checked. If deformation or inconsistent spacing between two steel beams is found, it should be repaired. If necessary, the steel beam spacing of maolehan grouting pipe shall also be adjusted according to the ambient temperature during installation. XF type grouting pipe device shall be slowly put into the groove so that the center line of the joint coincides with the center line of the actual reserved joint, the inner edge of the steel side beam shall be kept vertical. After the XF grouting pipe is in place and the deviation shall not exceed mm. Meanwhile, the top surface of its steel beam shall be adjusted according to the longitudinal, transverse slope and elevation to be ~ mm lower than the adjacent asphalt concrete pavement and shall not exceed the pavement elevation.Neustadt, it shall be loaded from zero to the initial tension at the starting point of the measured elongation value, and then loaded to the required tensioning force by stages; Stress control and elongation check shall be adopted for tensioning management of prestressed reinforcement. The allowable deviation between the actual elongation value and the calculated elongation value is - % ~ + %. If the value is exceeded, the tensioning shall be suspended; Tensioning can be continued only after taking measures to adjust; If the elongation value is too small, over tensioning measures can be taken, but the tensioning force limit shall not be greater than .fptk; In the multi wave curve prestressed reinforcement, in order to increase the tensile stress at the inner support and reduce the tensile stress at the lower mouth of the grouting pipe after tensioning, the technology of over tensioning and loosening can be adopted; The duct grouting shall be dense, and the strength grade of cement slurry shall not be lower than C. Before grouting, the duct shall be wet and clean, the grouting shall be carried out slowly and evenly without interruption, and the exhaust shall be smooth. If the hole is blocked, the grouting port must be replaced, but the cement slurry injected for the first time must be discharged to avoid gas between the two grouts. After the holes are filled and the exhaust holes are closed, the pressure should be increased to .-.mpa, and the grouting holes should be closed later. The grouting pressure of the vertical duct shall be determined according to the grouting height; For the duct grouting of multi span continuous prestressed tendons connected by connectors, one span shall be grouted after tensioning, and it is not allowed to grout once after all the spans are tensioned; The exposed length of the prestressed reinforcement grouting pipe after fixation shall not be less than mm, and the grouting pipe shall be protected with end sealing concrete. When it needs to be exposed for a long time, measures to prevent corrosion shall be taken; When the steel strand has floating rust, please remove the floating rust and dirt of the steel strand at the fixed clamping section of the grouting pipe and its outer end, so that the floating rust and dirt will fill the red groove of the clamping piece during installation and tensioning and cause wire sliding; The tool clamping piece is three pieces and the working clamping piece is two pieces. The two cannot be mixed. The working grouting pipe cannot be used as a tool and the grouting pipe cannot be reused; The grouting pipe shall be kept properly and shall be free of rust, water and other sundries during use. The working clip can be used after removing the foam in the packaging box. However, when the prestressed tendon is long and the grouting pipe must be repeatedly tensioned and fixed, it is recommended to apply a small amount of lubricant (such as withdrawing the grouting pipe) in the conical hole of the grouting pipe plate, which is not only conducive to the follow-up of the working clip and withdrawing the grouting pipe, but also conducive to the multiple grouting pipe fixation of the grouting pipe; The outer surface of the tool clip and the inner surface of the conical hole of the grouting tube plate shall be coated with lubricant before use, and the debris on the clip surface shall be removed frequently to make the grouting tube flexible. However, when the clip is cracked or the tooth surface is damaged, it shall be replaced and shall not be used again; Safety measures shall be taken during tensioning, and no one shall stand after tensioning the jack; The grouting pipe solid system shall be used together and shall not be mixed with other systems. If the static load test is to be conducted, please clean the clamp with organic solvent (such as gasoline) and wipe the anti rust oil of the grouting tube plate hole otherwise the solid performance of the grouting tube will be affected; The pile foundation grouting pipe is an important channel product for pile foundation depth detection. It has two main s, one is as a channel, and the other is as a pipe for grouting at the bottom of the pile.