RigaModel of control transformerThe industry accelerates the pace of adjustment
release time:2024-04-20 11:46:53

& ldquo; YN, D & rdquo;,RigaPower supply transformer, in which indicates that when the working voltage phasor of the primary side line, as the minute hand, refers to the position at o'clock,RigaCooling mode of oil immersed transformer, the phase voltage phasor of the secondary side is at o'clock. That is, the phase voltage UAB of the secondary side lags degrees behind the working voltage uab of the primary side line (or degrees ahead).The whole process of hanging the core of dry-type transformer is more critical, and there are many situations that the hanging core of dry-type transformer must pay special attention to. Therefore, the hanging core of dry-type transformer should be carried out according to the above matters, so as to promote the safety of dry-type transformer!Riga, different oil-based oils cannot be mixed. Under special circumstances, if it is necessary to use new oil of different grades, it should be determined whether the mixed oil with ice degree can be used according to the requirements of the region, and then the oil mixing test should be carried out.Outdoor sampling shall be carried out in sunny days or dry weather with low environmental humidity. During sampling, it is necessary to resolutely prevent the invasion of dirt such as rain, snow, wind and sand.Joao PessoaThe conductor insulation of power transformer is the main part of internal insulation. Some conductors should pass through the middle of electromagnetic coil, or between electromagnetic coil, iron yoke clamp and automobile oil tank wall. Therefore, it is necessary to ensure that this kind of conductor has sufficient insulation compressive strength, i.e. insulation spacing.(II) the height width ratio of dry-type transformer pier installed on the ground is generally .m, and a guardrail of no less than m shall be installed around it, and a warning sign shall be hung at a prominent position.During no-load test run, the transformer shall be connected with the working voltage from the switching power supply side, and then make the working voltage impulse closing.


RigaModel of control transformerThe industry accelerates the pace of adjustment



The noise of dry-type transformer belongs to low-frequency noise. In a small area, most of it is scattered according to the building structure. This kind of low-frequency noise is scattered to the household house according to the house building, and then causes gas vibration noise, which is then scattered to the ears of consumers. Although the amount of noise is not very large, and then accurately measure the inter chip insulation resistor by AC voltage and galvanometer method. If the damage is not large it is a common fault of the winding. Then carry out the appearance inspection of the iron core,RigaInspection table of box type transformer, paint the damaged part.The power transformer is composed of two or more electromagnetic coils wound around the same transformer core. The winding resistance is connected according to the alternating electromagnetic field and works according to the basic principle of magnetic effect of current. The installation position of power transformer shall be considered to be conducive to operation, maintenance and transportation, and a reliable area shall be selected at the same time. The rated capacity of the transformer must be effectively used when applying the transformer.Quality assurance,Use fiber materials to seal the bolts to achieve the goal of controlling leakage. The other is to screw out the bolt (nut), wipe the Fushi blue film remover on the surface, and then tighten it after wiping the raw materials on the surface. After drying, the treatment goal can be achieved.(IV) the transformer on the column shall be stable and firm, and the waist rail shall be & phi; mm galvanized wire shall be wound over turns in an even number. The iron wire shall not have a connector and shall be tightened after winding. The distance between the waist rail and the energized part shall not be less than .m.After sampling,Note: in the whole process of safety patrol inspection, the on-site operation and maintenance management staff must use temperature tester or thermal imager to carry out purposeful inspection on the transformer itself, terminal block and other accessories; The sound during the operation of the transformer is a symmetrical current sound. If the sound is found to be abnormal, significantly expanded, or there is local sound, the cause shall be found immediately and certain effective measures shall be taken. If necessary, the load can be reduced or the operation of the transformer can be stopped.Transformer manufacturers said that at this stage, China's energy-saving distribution transformer market is relatively scattered, uneven companies, lack of evaluation and specifications, and inadequate technical innovation, resulting in slow marketing of energy-saving transformers.Falling foreign matters and piercingRiga,Sound in case of phase failureAfter no-load test run is normal for h it can be transferred to on-load operation, and the load shall be gradually increased from %, % and % by grade.The power transformer is designed according to the temperature protection scheme. The embedded parts in the material layer of high (low) pressure electromagnetic coil poured with integral concrete are provided with longitudinal ventilation duct, which can be equipped with air-cooled machinery and equipment (cooling centrifugal fan). After selecting air-cooled machinery and equipment, the output capacity can be increased by %.

comment list
  • Feida Copper Processing Company

    RigaModel of control transformer It’s really good, how long does it take to arrive after the departure?

  • Indoor fire hydrant

    The festival is coming soon, can RigaModel of control transformer be discounted?

  • Life Information Consulting Services

    RigaModel of control transformerHow much is the best price, and I will give you a comment, can RigaModel of control transformer be cheaper?

  • Pressureless biomass stove

    Good seller, thank you. My colleagues like RigaModel of control transformer very much. Come again next time!

  • prosperous source manufacturing co., ltd.

    I think it’s pretty good. When I bought it, I saw the comments in the comments and I bought it. When I saw the shipment, I was very excited. After RigaModel of control transformer arrived, I was excit

©2009-2024Industrial Microblog  Sitemap