LegnanoDistribution transformer structureA few tips to improve efficiency
release time:2024-04-20 04:07:20

Oil leakage at looper flangeProtective measures for damping of dry-type transformerLegnano,Automatic system of centrifugal fan: measure the temperature data signal according to the PT thermistor temperature measuring resistor of the embedded parts at the hot part of the bottom pressure winding. The transformer load expands and the operating temperature increases. When the winding temperature reaches ℃, the system software automatically starts the centrifugal fan for refrigeration; When the winding temperature is as low as ℃, the system software will automatically terminate the centrifugal fan.If the above provisions are not met, the problem of dryness shall be solved. Generally, it is OK to operate the centrifugal fan for a period of time. Check the cleanliness of the power transformer. If too much dust is found, it must be eliminated to ensure indoor ventilation and avoid insulation penetration. In particular, pay attention to cleaning the insulators of the power transformer and the top and bottom ends of winding resistance installation. Portable centrifugal fan or dry air compression or N shall be used to clean the dust in indoor space that is not easy to reach, such as ventilation duct, and there shall be no dirt.Palanga,Before no-load impact closing, the pose period of overcurrent protection shall be set to zero, and the data signal circuit of steam vehicle relay shall be temporarily connected to the pull-in circuit.When the full load test is carried out and everything is normal, the load can be connected.Solenoid insulation deterioration


LegnanoDistribution transformer structureA few tips to improve efficiency



Operation of oil immersed transformerIt can be seen from the above that from the perspective of power saving, in some cases,LegnanoOil immersed power transformer manufacturer, transformers & ldquo; A small horse pulls a small car & rdquo; Can't compare with & ldquo; Middle car & rdquo;, Even less than & ldquo; Great Lars little dragons & rdquo;, Therefore, the loss of transformer full load and load must be considered in the calculation, and the results can be properly made in terms of power saving or power consumption. According to the correlation between the load rate and the transformer capacity: . The transformer load rate and power saving will be brought into the formula: the load index of the transformer, that is, the operating load and rated capacity of the transformer . Now it is illustrated by examples that both sides of the acadc al electron touch toe ground type seek the derivative of P, the formula is reduced The load index is the load index when the transformer operation loss is small and the rate is large, and the rate is large when the specific copper loss is equivalent to iron loss.The noise of dry-type transformer is mainly the vibration noise in operation. This vibration noise is caused by multiple positions, including the vibration of magnetic induction electromagnetic coil. All pay great attention to the solution of vibration when carrying out noise control.consumption,The oil in the machinery and equipment of the oil storage tank shall generally stand for more than h before sampling; it is not necessary to stand when sampling on the running power transformer.Sound, causing short circuit obstruction. If not handled properly, it will cause great damage.& ldquo; YN, D & rdquo;, refers to the position at o'clock as the minute hand the phase voltage phasor of the secondary side is at o'clock. That is, the phase voltage UAB of the secondary side lags degrees behind the working voltage uab of the primary side line (or degrees ahead).


LegnanoDistribution transformer structureA few tips to improve efficiency



The bearing capacity of each load is different. Generally, dry-type transformer should operate under rated capacity, while oil transformer has better load working capacity.quality standard,Oil immersed transformerPrecautions for trial operation of power transformer manufacturersThe raw materials of Fushi blue can be used for bonding, so that the overall oil leakage of the connector can be greatly controlled; If the actual operation is convenient,LegnanoHow much is a 50 KVA box transformer,LegnanoPrinciple of power transformer, the metal shell can also be bonded at the same time to achieve the purpose of leakage treatment.Legnano,Before no-load impulse closing, the transformer shall be placed for h, and the rising seat and waterproof sleeve installed with vent plug shall be deflated on time.During no-load test run, the transformer shall be connected with the working voltage from the switching power supply side, and then make the working voltage impulse closing.Naturally, please don't panic. I firmly believe that the damage will be reduced to a lower level as long as the above methods are effectively rectified. Above is the general process and process that should be paid special attention to in the whole ignition process of the oil immersed transformer. When the oil immersed transformer catches fire, please be rational to make the oil immersed transformer safer and more efficient.

comment list
  • junma machinery manufacturing co., ltd.

    I have been shopping online LegnanoDistribution transformer structure for so many years, this is the first time I have taken this seriously. I am very satisfied with the product quality and workmanshi

  • oil crops

    Ha ha. LegnanoDistribution transformer structure It’s here so soon, it’s not bad, next time you come, you can ask for a discount ^_^

  • Real estate development and operation

    LegnanoDistribution transformer structure It can be said to be top-notch, and the details are perfect.

©2009-2024Industrial Microblog  Sitemap