SoletracySeamless pipeDemand recovered and prices rose significantly
release time:2024-04-17 23:52:19

Process flow: drill in place → Drilling → Mud injection → Run casing → Continue drilling → Slag removal → Hole cleaning → Hoist the reinforcement cage → Water jetting and bottom cleaning → Concrete conduit → Placing concrete → Catheter & rarr; The pile top reinforcement can be divided into single liquid silicification method, double liquid silicification method, aerated silicification method and electric double liquid silicification method.● features: the grouting pipe is divided into secondary grouting pipe (ccll-y grouting pipe, qdm-it grouting pipe, ccll-y full section grouting pipe) and repetitive grouting pipe (ccll-d grouting pipe, ccll-d full section grouting pipe)

SoletracySeamless pipeDemand recovered and prices rose significantly


Push the rock powder and sundries that are not washed, remain at the hole bottom,SoletracySteel pipe, or stick to the hole wall out of the grouting range, so as to improve the bonding strength and impermeability between the slurry stone body and the fracture surface.After the grouting hole is drilled, install and lower the grouting pipe grout stop plug, mixer and other facilities in the hole.SoletracySeamless pipeDemand recovered and prices rose significantly, cold joints, pipe seepage joints and gaps between ground walls in concrete. It is very suitable to install grouting pipes between the joints of new and old concrete. When water seeps into the joint, the PVC port slurry on the surface can be set to seal the joint. The appropriate grouting time can be selected at the end of concrete curing. Leakage joints can also be sealed with this. Provide long-term grouting pipe, steel flower pipe, advance small pipe,SoletracyGrouting pipe, high-pressure grouting pipe, pipe shed pipe, grouting pipe factory, old brand, price advantage and quality guarantee! In the embedded grouting pipe, the slurry can seal the construction joint, cold joint, pipe leakage and the joint between the ground wall.The grout stop plug grouting method is generally used for Rock Fissure Grouting. The grouting pipe is provided with a grout stop plug,SoletracyPrecision tube, thin mud slurry can also be used as circulating fluid.Soletracy,Laguanilas,Process flow: drill in place → Drilling → Mud injection → Run casing → Continue drilling → Slag removal → Hole cleaning → Hoist the reinforcement cage → Water jetting and bottom cleaning → Concrete conduit → Placing concrete → Catheter & rarr; The pile top reinforcement can be divided into single liquid silicification method double liquid silicification method, aerated silicification method and electric double liquid silicification method.

comment list
  • Friends Pipeline Company

    Can you give me a discount next time I buy it, SoletracySeamless pipe The quality is good, and I will live up to the boss

  • xuyao printing co.

    The festival is coming soon, can SoletracySeamless pipe be discounted?

  • poultry farming

    The quality is very good, really good, SoletracySeamless pipe the same as the picture, the packaging and quality are also very good,

©2009-2024Industrial Microblog  Sitemap