The foundation pit excavation shall strictly follow the principle of 'layered excavation'. The support erection shall be closely coordinated with the earthwork excavation. During the excavation, the earthwork near the grouting pipe shall be excavated by the central trenching method to prevent the machinery from colliding with the support; The earthwork near the slope protection pile shall be excavated manually with small machines and tools. It is forbidden to collide with the grouting pipe and bored pile by mechanical excavation. After the earthwork is excavated to the design elevation, the grouting pipe shall be erected and prestressed in time to reduce the exposure time without support.It is proved by experiments that the bearing capacity of the same bored pile with and without grouting pipe is separated by %. That is why more and more bored piles and grouting pipe grouting are used more and more widely in ChinaHaslev,Application of full section grout discharge grouting pipe in construction sequence the full section grout discharge grouting pipe is a embedded grouting pipe system, which is used for permanent sealing of construction joints, cold joints pipe leakage, gaps between ground walls,HaslevExpanded shell hollow grouting anchor manufacturer, etc. in concrete. In the treatment of construction joints, leakage remedial measures are mainly reserved. When leakage occurs, grouting is used to make up the leakage. The grouting material can be filled with hydrophilic epoxy resin slurry which can seal the construction joint. The outer diameter of the grouting pipe is mm; Inner diameter mm; Pressure at % deformation > MPa; Weighing about t / M; Operating temperature < ℃.The main elastic element of the grouting pipe is the stainless steel grouting pipe, which compensates the axial, lateral and angular direction of the pipe by the expansion and bending of the grouting pipe.Melong, extrusion, molding, punching, stretching, shaping, coiling and other processes. Compared with metal textile mesh and plastic woven mesh, high strength, isotropy, and antistatic, It is a new type of mesh grouting pipe material for underground coal mine support engineering and civil engineering.Welding is strictly prohibited during use,HaslevPile bottom grouting pipe, because the strength of the welding point is much lower than that of the steel itself, and it is easy to cause broken wires at the welding point during tensioning. When the grouting pipe adopts circular reinforcement arrangement, its bending radius shall not be less than times of the diameter. The quality of the steel upsetting head of the grouting pipe is not directly related to its own quality, but the excessive strength will be harmful to the quality of the upsetting head. Therefore, when you choose the upsetting head anchor, you should explain it in detail to the manufacturer in the order.


HaslevSmall catheterCorrect judgment



At the same time, because the space in the grouting pipe restricts the lateral sliding and rolling of the soil particles inside, the relative displacement trend or relative displacement also occurs between this part of soil particles and adjacent soil particles, resulting in friction. This friction force is generally called 'bite force' or 'lateral force resistance'. The 'surface friction' and 'bite force' make the slip and roll of soil particles under the force of the upper limit line at the location of the grouting pipe, and limit the lateral displacement of soil in the whole plane of the grouting pipe. The grouting pipe plays an important role in the key points of settlement. Therefore, it is reasonable to use the grouting pipe to treat the uneven settlement of fill excavation transition subgrade. This paper yzes the action mechanism of the grouting pipe according to its type and characteristics, introduces the construction technology and process in the construction of preventing the reflection crack of the road surface, and proposes a new technology of sprinkling a layer of filler in the grouting pipe network when paving the surface course. As a kind of road reinforcement material, grouting pipe is widely used in road maintenance engineering because of its advantages of simple fast construction and low investment.Inner diameter: mm; Outer diameter: mm; Inner diameter tolerance: ± .mm; Length of each roll: m.The grouting pipe without shaft roll packaging is tapped and paid off from the inner ring in the vertical state, and the drawn out pipe is spring shaped and automatically straightened. Takeout direction: the spiral direction of the spring shape after takeout is consistent with the twisting direction of, otherwise fried dough twist or disorder will occur. Welding is strictly prohibited during use, because the strength of the welding point is much lower than that of the steel itself, and it is easy to cause broken wires at the welding point during tensioning. When the grouting pipe adopts circular reinforcement arrangement, its bending radius shall not be less than times of the diameter.manufacturer,A short section of screw end rod is welded on both ends of a single prestressed thick steel bar, and the nut and backing plate are sleeved to form the simplest grouting pipe. The pretension force is transmitted to the nut through the bearing force on the threaded slope of the screw end rod, and then to the concrete components around the reserved hole crossing through the base plate.Let&#;s take a look at the prestressed machines and tools. The small editor of prestressed machines and tools reminds everyone that the screw end rod is made of cold drawn or heat-treated reinforcement, and the thread is fine teeth. The welding between the end rod and the prestressed reinforcement should be carried out before the cold drawing of the prestressed reinforcement. This grouting pipe can be used at the tensioning end and the fixed end. A general jack is used for tensioning, and the jack pull rod (with internal thread at the end) is tightened on the thread of the screw end rod for tensioning. After tensioning, tighten the nut and anchor the rebar. The advantages of this grouting pipe are relatively simple, and when the jack returns oil after the grouting pipe, the prestressed reinforcement basically does not slide. If necessary, facilitate re tensioning. The disadvantage is that the accuracy of the length of prestressed reinforcement is high, and it cannot be too long or too short, otherwise the thread length is not enough.The grouting pipe diffuses the load on it. When the reinforced soil is loaded, the grouting pipe has a high bond with the soil, and has a mutual embedding effect with the soil, showing better tensile performance. The tensile stress of the soil is transmitted to the grouting pipe, making the reinforced soil a tensile member, which can change the stress from the vertical direction to the horizontal direction, spread the load stress evenly to a large base range, enhance the overall tensile strength of the soil, and effectively improve the stress distribution of the pavement structure. The strength of high tensile reinforced soil is far higher than that of unreinforced soil, greatly improving the bearing capacity of the soil.How to deal with the joint if the grouting pipe is installed in sections? If the grouting pipe is installed in sections, the joints must be welded. The welded joints of the section steel have been prepared in the manufacturing plant, and can be installed after the two-phase adjacent joints are aligned. After all beams are welded, anchor them according to the above steps. Install the formwork at the beam end. The formwork shall be made according to the overall dimensions of Hainan grouting pipe device and the notch of the reserved slot. The formwork shall be made quite tight to prevent mortar from flowing into the displacement control box or into the beam end gap.After checking that the installed formwork is tight and seamless, clean the reserved groove, then pour concrete and vibrate it tightly. The concrete shall have at least the same strength as the structural concrete at this place, and the grouting pipe device in Hainan shall be kept clean when pouring concrete.


HaslevSmall catheterCorrect judgment



Answer: according to the length and diameter, the weight of common grouting pipe is . ~ .KG, and the weight can reach several kilograms.Application scope and development space of grouting pipe as a new term, grouting pipe has gradually appeared in some online newspapers and periodicals, and its practical scope has also developed from the support of some basic automobile boot and engine cover to the machinery manufacturing industry, used for the support of equipment accessories, vibration reduction of equipment, support of tool box cover, medical industry, its scope of application is becoming wider and wider. Some people in the industry asked: the application range of grouting pipe is becoming wider and wider. Does it have an impact on the original telescopic spring? In my personal opinion, it will not impact the original spring. Of course, it will have a certain impact because most of the grouting pipes are innovations in the product design of some enterprises. For example, the rear box of a tricycle was originally supported by an iron bar (which is still useful). Now, the grouting pipe is very light, so its design has certain limitations, However, enterprises must be innovative in order to be ahead of their peers. We have been making grouting pipes for many years. Experience tells us that many manufacturers are now trying our grouting pipes, and they have been officially used, with obvious effects. However, some enterprises do not know what the grouting pipes are, let alone their s, so they will be in a passive position. Therefore, we hope that some industries, such as machinery manufacturing automobile and motorcycle, transportation equipment, box manufacturing such as tool boxes medical treatment, fitness, kitchen cabinets, etc, If you need to know the and use of the grouting pipe, please feel free to consult me, and I will give you advicenew product,General treatment method: first, yze what causes the pipe blockage. For the pipe blockage of hard objects you can poke with steel bars according to the depth, or bind a slightly thicker steel bar with steel wire rope. For the pipe blockage of soft objects, you can use the air compressor pipe to open the air compressor for blowing. Be sure to note that the water in the pipe may rush up like a fountain to pour water all over you! If it is slurry leakage and pipe plugging, there is no way to open it. We can only communicate with the testing personnel to change a testing method, such as low strain and core drilling method! Other uses of the grouting pipe: in addition to being used as a detection channel and replacing part of the reinforcement section, the grouting pipe can also be used as a pipe for grouting at the bottom of the pile. Experiments have proved that the bearing capacity of the cast-in-place pile treated with the grouting at the bottom of the pile can be greatly improved. At the same time, it is necessary to take measures to punch through the pipe at the defective part to be grouted. Grouting pipe is specialized in the production of grouting pipe (ultrasonic detection pipe) for bridge pile foundation inspection. The product conforms to the industrial standard steel thin-walled grouting pipe for concrete cast-in-place pile and its use requirements (JT / T -, which was tried out by the Ministry of communications of the people&#;s Republic of China on April , It can not only meet the requirements of the standard, but also greatly improve each index, and obtain the inspection report of Hebei Road and Bridge Inspection Center. Slump test shall be carried out for concrete entering the site. No less than groups of test pieces shall be made for the same batch of concrete with the same strength grade. One group is used for standard curing, and the other two groups are used for curing under the same conditions to determine demoulding and allowable lifting time. How to deal with the joint if the grouting pipe is installed in sections? If the grouting pipe is installed in sections, the joints must be welded. The welded joints of the section steel have been prepared in the manufacturing plant, and can be installed after the two-phase adjacent joints are aligned. After all beams are welded, anchor them according to the above steps. Install the formwork at the beam end. The formwork shall be made according to the overall dimensions of Hainan grouting pipe device and the notch of the reserved slot. The formwork shall be made quite tight to prevent mortar from flowing into the displacement control box or into the beam end gap. The grouting pipe is padded with the front lip of the horseshoe, and the height of the saddle shaped curved surface is changed to make the pipe wall crawl and slide along the accurate saddle shaped curved surface.Haslev,The research shows that the friction between the grouting pipe and the soil is also greatly related to the water content and compactness of the soil. The grouting pipe itself has a pattern, so the friction between the grouting pipe and the medium is very large; The grouting pipe also has a great tensile strength, a large deformation modulus, and the reinforcement is stable and uniform, which can see good results in a short time. It can be seen from the experiment that the mesh reinforcement performance of the grouting pipe is better than the strip reinforcement material, which increases the stability of the project; The grouting pipe is especially suitable for the construction of high-speed highways, because the action force of the back and forth traffic on the soil is very great, and the grouting pipe can share the stress increase the deformation modulus of the soil, effectively enhance the strength of the soil, and achieve the effect of stabilizing the project and long-term use.Before the installation of the grouting pipe, it is necessary to check whether the processed support is vertical to the grouting pipe fitting, and correct the non vertical support; Then install the grouting pipe on the bracket and fasten it.Appropriate measures shall be taken to prevent surface water, curing water and garbage from falling in. When necessary, a sump shall be set near the post cast strip of the base plate in combination with the design of the basement plane drainage system to facilitate the final cleaning before the grouting pipe is cast. When advance water stop is not used,HaslevAdvance support of small conduit, or set outdoors as a temporary facility. Usually, we use the waterproof scheme between the grouting pipe and the water surface or before, and there are many methods for the grouting pipe to stop water in advance. It should be noted that the design unit should participate in the review of the construction organization design of the basement, so as to determine a complete implementation scheme of advanced water stop before the excavation of the foundation pit and the pouring of the cushion. Otherwise, the design modification requirements will be put forward only when problems are found in advance water stop during construction, which will affect the integrity and rationality of the whole water stop scheme.


comment list
©2009-2024Industrial Microblog  Sitemap