PerugiaElevator for 3-story family villaHow to repair
release time:2024-04-20 11:59:52

For escalators that require intermediate support, it is necessary to determine whether the site has the conditions for adding support, as well as the range of support that can be added, the height and load size of the equipment and support platform, and other parameters.The household must make two steel splints above the entrance. The position and size of the clamp plate are determined based on the selected door machine model.Perugia,There are many similar situations in daily life, such as forcefully opening the door inside the car,PerugiaSelf propelled aluminum alloy elevator, causing the circuit to disconnect and forcing the elevator to stop, resulting in people being trapped. For example, if the elevator frequently enters and exits during decoration and falls into the crack of the door, the elevator hall door may not be tightly closed, the elevator will stop. Professional quality assurance for home elevator manufacturers. Discount activities are underway, and new and old customers are welcome to come for consultationThe safety monitoring machine room environment screen cabinet main power switch traction wheel speed limiter shaft and pit guide rail layer door and car counterweight should be reliably fixed with pressure plates to prevent loosening.Kyongsong,Tower style residential buildings above; Residential units and corridors with twelve or more floors; Other Class II public buildings with a building height exceeding meters; High rise buildings with elevators exceeding meters in height; The functional fire elevator has a front room. The area of the independent fire elevator front room is: the front room area of the residential building is greater than square meters; The front room area of public buildings and high-rise factory (warehouse) buildings is greater than square meters. When the front room of the fire elevator is shared with the smoke proof staircase, its area is: the area of the shared front room in residential buildings is greater than square meters, and the area of the shared front room in public buildings and high-rise factory (warehouse) buildings is greater than square meters.Measurement of elevator shafts in new construction projects under different on-site conditions: When the building design is not yet completed, the operator only needs to provide the user with the standard elevator layout of the required elevator specifications, and the user entrusts the design department to design the elevator shaft. When the architectural design has been completed, and the site has not yet been constructed,PerugiaAutomatic high-altitude reclaimer, is under construction, or has been completed, it must be determined based on the current construction or measured dimensions. If the original civil design of the shaft needs to be modified, the user should entrust the architectural design department to make the shaft design modification based on the layout provided by the elevator.Multiple elevator shafts can be connected and an - # I-beam can be fixed at a certain height between each adjacent elevator shaft, with the same position as the ring beam. The pit must be equipped with an isolation net that is mm above the ground level.


PerugiaElevator for 3-story family villaHow to repair



Electrical components are roughly divided into screens, electrical switches for each safety circuit, etc. It is the brain of the elevator and the central nervous system of the elevator. The movement, operation, and door opening and closing of the elevator are all controlled by it, so it must be treated as a top priority in daily maintenance work. Do not short circuit the elevator circuit inside the screen during work. When the elevator door system malfunctions, someone shorts the elevator door for convenience in order to find the fault. This is very dangerous, and there are many accidents when shorting the door. Why? If a person opens the hall door and extends their head inward, the elevator happens to run up or down to this point, and the hall door is shorted the elevator cannot stop, so an accident is highly likely to occur. So in our daily maintenance work, we must not short-circuit the safety circuit. If it is necessary to short-circuit, we must identify which safety component has a problem and which safety component needs to be shorted. Moreover after maintenance or urgent repairs are completed, we must promptly remove the short-circuit wire. Professional household elevator manufacturer, with a large quantity and excellent quality at a reasonable price. It is fire-resistant, waterproof, high-temperature resistant, sturdy and durable, safe and reliableThe elevator stops on the first floor and the door does not move: the fire emergency landing function of the elevator is triggered by smoke or thermal sensors inside the building.The call button on each floor is no longer working, and the call is cut off.Installation requirements, with the same position as the ring beam. The pit must be equipped with an isolation net that is mm above the ground level.The door closing button has no self maintenance function. During the designated maintenance period, the elevator components in operation are inspected, refueled, dust is removed, and safety devices are debugged. Including non-destructive testing and maintenance of elevator traction steel wire ropes.Attention: The elevator consists of two main parts: mechanical and electrical. If the elevator is not maintained on a daily basis, its safety cannot be guaranteed. If the elevator needs to be refueled without refueling, it will cause wear and tear on the mechanical components of the elevator, greatly shortening its service life and preventing normal use of the elevator.


PerugiaElevator for 3-story family villaHow to repair



In the event of a fire when instructed by the fire center or the dedicated operation button of the first floor firefighter to enter the firefighting state, the elevator should immediately stop on the floor without opening the door, return to the first floor station, and automatically open the elevator door if it is in the upward direction.Quality risk,The beam edge distance is too small: The method of shortening the lower platform is to shorten the total length of the escalator, but note that the range of shortening is very limited, generally not exceeding mm. Generally, the platform cannot be shortened because it contains equipment such as cabinets and motors. Change the angle of the escalator from degrees to degreesThe gantry elevator is used in the door legs of large gantry cranes to transport workers and maintenance components inside the gantry craneThere are dedicated operation buttons for firefighters at appropriate positions at the entrance of the first floor elevator. The operation buttons are generally protected by glass sheets and have a red&# quo; mark in place; Dedicated to fire protection; Words such as.Perugia,Electrical safety. Faulty elevators have multiple safety devices, but there are also many places where problems can occur. Some people have been caught due to abnormal door opening and closing, while others have encountered situations where elevator buttons malfunction and the display screen is black, taking the elevator is not about finding or acting in a movie. The real life is disturbed by the frequent elevator accidents, which make my heart feel uneasyTower style residential buildings above; Residential units and corridors with twelve or more floors; Other Class II public buildings with a building height exceeding meters; High rise buildings with elevators exceeding meters in height; The functional fire elevator has a front room. The area of the independent fire elevator front room is: the front room area of the residential building is greater than square meters; The front room area of public buildings and high-rise factory (warehouse) buildings is greater than square meters. When the front room of the fire elevator is shared with the smoke proof staircase its area is: the area of the shared front room in residential buildings is greater than square meters, and the area of the shared front room in public buildings and high-rise factory (warehouse) buildings is greater than square meters.  “& rdquo; Elevator shaft: The design conditions are provided by the user to the architectural design department. The architectural design department analyzes whether the on-site pit depth, top floor height, etc. can meet the installation requirements of the elevator, as well as which building structures are needed (such as smashing stairs or floors), and develops a renovation construction plan. If it is indeed necessary to change the elevator structure due to civil engineering conditions (such as car size, door opening width, etc.), then consider the non-standard design of the elevator.


comment list
  • Qukou Huaao Sheet Metal Co., Ltd.

    The stuff is really good, but PerugiaElevator for 3-story family villa the price is a bit more expensive, but it is still worth the money. This is the first time I bought it, thanks to your shopping g

  • Air Ocean Wire Mesh Manufacturing Co., Ltd.

    Support each other! Seeing you PerugiaElevator for 3-story family villa, we are preparing to place an order and hope to ship on time.

  • Seiki Co., Ltd.

    A good seller, even a novice, a lot of PerugiaElevator for 3-story family villa don’t understand. Fortunately, the seller has patient guidance on the other end of the computer, and I have a sense of a

  • Safety fence processing and sales

    Since the last time I bought your PerugiaElevator for 3-story family villa, this new model has indeed met the standard and is very good, giving you a good comment.

  • leibo trading co., ltd.

    PerugiaElevator for 3-story family villa Tell me a price, is there a detailed price for the parameter?

©2009-2024Industrial Microblog  Sitemap