BriseniProduction process of oil immersed transformerEconomy gradually moves closer to digital
release time:2024-04-23 05:31:25

If you want to check the activated carbon fiber for the hanging cover, first take out the low-voltage waterproof sleeve and the on load transformer power switch, then lower the bell cover anchor bolt of the large cover, slowly hang the galvanized steel wire rope with sufficient lifting net weight on the commonly used earrings, wear round steel from top to bottom in the surrounding screw holes, and count the spacing and specifications for easy reinstallation. At the same time, the cable wind shall be added on all sides to ensure that the core international body will not be damaged during the whole lifting process. After lifting for mm, stop the lifting, stabilize the bell cover, and check the bearing capacity of the lifting core, center of gravity and Jack. After everything is normal, lift it again until the bell cover exceeds the relative height of the body, and rotate the crane to place the bell cover on the clean skid.The hanging core of dry-type transformer is a vital partBriseni,The insulation of the through core anchor bolt clamping the iron core is damaged, resulting in a short circuit fault between the silicon steel sheet of the iron core and the through core anchor bolt;Oil leakage at looper flangeMorogoroThe representative mode of connection group of dry-type transformer is: English capital letters indicate the wiring on the primary side (or primary side), and English letters indicate the wiring on the secondary side (or secondary side). Y (or y) is star wiring, and D (or D) is triangular wiring.Insulation and heat removal are different. Dry type transformers are generally insulated with epoxy resin, cooled by natural air and large capacity by centrifugal fan. Oil immersed transformers are insulated by insulating oil, insulated by insulating oil in the circulating system inside the transformer, and heat is discharged on the radiator (radiator) of the circulating system inside the transformer.The vibration reduction of the grounding device sheet solves the problem of modifying the fixed hard connection between the copper sheet of the grounding device and the dry-type transformer. The original oscillation of the dry-type transformer will be transmitted to the metal in the concrete by the baffle and cause low-frequency noise. Therefore it must also be changed to produce flexible connection.


BriseniProduction process of oil immersed transformerEconomy gradually moves closer to digital



Power transformers are used in all walks of lifeThe secondary inductive equipment of the distribution station (such as transformer, voltage transformer, automobile relay, AC, etc.) operates normally. According to the AC current, the winding transformer core will send out a symmetrical rhythm and a certain tone & ldquo; Buzz, buzz & rdquo; Sound. The operation staff of the transformer manufacturer should understand and grasp the characteristics of the noise. When the equipment has common faults, there will be noise and even & ldquo; Crackle & rdquo; The charging and discharging sound can distinguish the generation and characteristics of common equipment faults according to the music law and sound transformation when everything is normal and abnormal.Before application, the sampling container shall be cleaned with vehicle gasoline, soapy water or other organic solvents (such as trisodium phosphate) except oil stains, and then washed with tap water until it is not alkaline, and the water can be evenly distributed from the bottle, and then cleaned with purified water for many times. The cleaned sampling container shall be dried in a ℃ drying oven. After refrigeration, the bottle cap shall be tightly closed and cannot be opened before application.safety requirements , if the tap changer is not in time, once the load increases it will cause mild & ldquo; Squeak & rdquo; Corona discharge sound, power off immediately for maintenance.


BriseniProduction process of oil immersed transformerEconomy gradually moves closer to digital



The power transformer conductor refers to the connecting transmission line between each electromagnetic coil, between the electromagnetic coil and the group outlet pipe,BriseniEuropean box type transformer, and between the electromagnetic coil and the tap changer.Where to sell API,Oil leakage of cast iron partsFirst of all, although dry-type transformer has strong moisture resistance, it is generally open structure or very susceptible to moisture,BriseniMain components of oil immersed transformer, especially the insulation level of dry-type transformer manufactured in China is low (lower flame retardant grade) Therefore, the dry-type transformer can obtain high stability only when the air humidity is below %. The dry-type transformer shall also be prevented from stopping operation for a long time to prevent serious damp. When the grounding resistance value is less than / V (operating voltage), it indicates that the transformer is seriously damp, and the trial operation shall be terminated.Then clamp the branch pipe with your thumb, clearly put forward the glass test tube, rotate and release the oil in the tube to clean the sampling tube, carry out it twice, and then draw the oil sample.Briseni,What is the reason for the shutdown of power transformer?Brief introduction of zero line of power transformerIn the case of using dry-type transformer,BriseniTransformer power supply application, customers must master the method of wiring. If there are problems in wiring, it is easy to cause common faults in application. So, what is the wiring mode of dry-type transformer?

comment list
  • Gas stoves

    I’ve been too busy lately, the confirmation is late, the quality is good, BriseniProduction process of oil immersed transformer genuine, good quality and cheap, haha.

  • Jinlong Bentonite Processing Company

    I just received it this morning and I like it very much. I'll come next time, can you introduce a friend to buy BriseniProduction process of oil immersed transformer for a discount?

  • Lifting platform manufacturer

    It’s really a test and waiting. I finally waited for 3 days BriseniProduction process of oil immersed transformer to arrive, the opening quality is very good

©2009-2024Industrial Microblog  Sitemap