BrasiliaClevelandBoost innovation
release time:2024-05-16 23:59:35

According to the needs of different performance genres, the form of the stage can be changed. For example, using an orchestra pit lift can combine a framed stage with a large lip or even an extended stage. In an experimental theater,BrasiliaPSV Eindhoven, using a lift can make the theater have various forms such as an end stage,BrasiliaRome Lido, an extended stage, an island stage, an intermediate stage, a T-shaped stage, or a hall.It is understood that the scissor type lifting platform is a widely used specialized equipment for high-altitude operations. Its shear fork mechanical structure provides high stability for the lifting platform, and high load-bearing capacity, making the range of high-altitude operations larger and suitable for multiple people working simultaneously. The lifting power is divided into V, V or V power supplies, diesel engines, using Italian and domestic hydraulic pump stations, and the table top is equipped with anti slip insulation buckle plates which have anti slip, insulation, and safety features. Please rest assured to use.Brasilia,BrasiliaKalish,m; When the lifting speed is greater than .m/s, after the upper limit switch is triggered by the hanging cage, the upper small safety distance L should meet the following requirements: L=+.V, where L is the upper safety distance; V: Increase speedMechanical devices controlled by cage movement should not be used to open or close the landing door.Minster,The counterweight guide rail should meet the specification requirements.Construction electric elevators outside the lightning protection rangeManual pump: When the system malfunctions, the manual pump can be operated to pump high-pressure oil to raise the car to the nearest floor position


BrasiliaClevelandBoost innovation



Installation verticality deviation guide rail frame erection height, h/mH≤ H& gt; verticality deviation/mm≤ (/h≤ ≤ ≤ ≤ pairs of steel wire rope construction electric elevators, the verticality deviation of the guide rail frame should not exceed (/) h.Degrees,Safety grounding device. In order to protect against electrical equipment. The metal casing of electrical equipment and the metal structure of electric elevators should be equipped with a safety grounding device. The grounding wire should operate multiple wires, and the neutral wire should not be arbitrarily held as a safety grounding wire. Its grounding resistance should not exceed ohms; The power supply of the electric elevator can be cut off.The angle between the wall bracket and the horizontal plane should comply with the requirements of the user manual.Later, when there is a major malfunction of the lifting platform, it should be repaired by professional personnel as soon as possible. After the malfunction occurs, it should not be used again to avoid accidents, personnel and property losses.


BrasiliaClevelandBoost innovation



Operating cost advantage and low failure rate: Due to the use of advanced hydraulic systems and good methods, the operating failure rate can be reduced to a low level.Where is itWhen the foundation is set on the roof or floor structure, the bearing capacity of its supporting structure should be checked.There is a certain itinerary.The angle between the wall bracket and the horizontal plane should comply with the requirements of the user manual.Brasilia,Electric elevators used in various places.Setting requirements: Drainage measures should be set up for the foundation of construction electric elevators to ensure smooth drainage.Setting requirements: The foundation and foundation of the construction electric elevator should meet the requirements of the user manual. Before installing the construction electric elevator, the foundation should be inspected and accepted according to the requirements of the specifications. Only after passing the inspection can the installation be carried out.


comment list
©2009-2024Industrial Microblog  Sitemap