During the installation of long-span top warehouse plate, if the supporting steel beam has been installed in the warehouse, the top warehouse plate and the supporting steel beam shall be fixed with pull rivets during the installation of each warehouse plate, and each top warehouse plate shall be riveted in two rows; If the lifting point type is adopted, the installation and construction of the lifting layout shall be realized before the installation and construction of the top silo plate,Before the warehouse is fixed with angle aluminum it shall be sealed with glass glue and fixed with angle aluminum with solid pull Mao. The distance between pull rivets is mm. The distance between the upper and lower sides of the door is mm.Other aspects: in the design process of food cold storage, it is also necessary to consider the cooperation between the cold storage and on-site fire fighting, ventilation,AltaCold storage frozen products, water and electricity systems. It should meet the requirements of safety, science and environmental protection. When designing and installing the cold storage, the drainage problem must be considered, and the following points should be paid attention to during redesign and installation.Fenlo,Cold storage has strong stability. Polyurethane foam technology makes it have superior bonding performance. The firm combination of polyurethane rigid foam and carrier layer is the basic premise to ensure the stability of external insulation layer. That is, under the unfavorable local temperature and humidity conditions, the characteristics of the cold storage still do not separate and fall off from the carrier layer and remain stable under normal conditions.Operating the unit: regularly observe the oil level and oil return of the compressor and the cleanliness of the oil. If the oil is dirty or the oil level drops, it shall be solved in time to avoid adverse effects.The bacterial action of acid disinfectants is mainly to coagulate the protein in the bacteria. Common disinfectants include lactic acid, formalin, etc. Specifically, after the fish comes out of the freezer, clean the frost layer on the evaporating pipe group and keep the storehouse temperature below degrees Celsius. Then, according to the volume of ~ grams per cubic meter volume of the frozen storeroom, the storeroom door is closed tightly with the sprayer, and the blower is started intermittently, so that the vinegar evaporates and flows in the storehouse, but indirect drainage shall be adopted. For the flushing (thawing) water drainage of each layer in the double-layer cold storage, an exhaust valve equipment shall be set in front of the main riser for flushing (thawing) water drainage.The high temperature and high pressure of the compressor of the wholesale condenser of the fresh-keeping warehouse as the heat sink and heat exchanger needs to be dissipated and heat exchanged through the condenser, mainly to condense the refrigerant. The high-pressure temperature can reach Baidu, and the temperature will drop to degrees after condensation.For water-cooled units, the turbidity of cooling water shall be frequently, the cooling water shall be replaced frequently, and whether the running, emitting, dripping, leakage and other conditions of the water supply system exist.Discount,After being stored in the medical cold storage project, ventilating medical products may also emit some odors. Once these odors are stored in a certain quantity, they will also have a certain impact on other products. Therefore, we must carry out regular ventilation in the process of daily use, so as to effectively reduce the storage time of products. If the medical cold storage project uses row tube refrigeration, the image of frosting may appear after use for a period of time. If we do not defrost in time it will also affect the effect of. Therefore, I hope you must pay attention to defrosting.During the installation of polystyrene storehouse, the Perpendicularity Error of wall plate shall be corrected while the top storehouse plate is installed. The length of the top warehouse plate shall be mm shorter than the surface of the wall plate. After the installation of the top warehouse plate, the mm gap shall be marked with foaming material to ensure the sealing performance of the warehouse body.The temperature and humidity in the warehouse shall be kept uniform without movement; Try to finish the food in the warehouse at one time.


AltaCold storage installation companyTransformation and development of



The polyurethane insulation board shall be connected by plug-in notch connection, because it has higher strength when connecting in this way.Online consultation,The spacing of pull rivets at inner and outer corners is mm and mm respectively; After the polystyrene library is installed, the wall panel joints shall be evenly sealed and decorated with silicone sealant.The air washing and ventilation of the cold storage is in the long-term sealed LIUCai storage and the carbon oxide is released due to the respiration of vegetables. If the accumulation is too high, it will have an adverse effect on the storage of vegetables. Therefore, ventilation device or air washing device is designed in the general warehouse.The refrigeration equipment in the fresh-keeping environment of the quick-frozen warehouse mostly adopts the single-stage compression refrigeration system, with freon as the refrigerant. The evaporation mode in the warehouse is the cooling fan,AltaInstallation price of 30 M2 cold storage, which can be ceiling type. If the number of warehouses is small and the volume does not exceed cubic meters, the refrigeration mode of the warehouse machine can be considered. If there are a large number of warehouses, the mode of multiple heads in parallel can be considered.Alta,Cold storage design segmentation: several different partitions shall be reasonably planned and divided according to purpose and temperature. For example: processing room, quick freezing room, refrigeration room, channel, unloading platform, etc.The construction structure of structural cold storage can be brick concrete structure or steel structure, which can be determined according to their own budget and actual needs. At present, most cold storages are constructed with single-layer steel structure, and are equipped with combined thermal insulation storage body, unloading platform, refrigeration system, system,AltaDesign of low temperature cold storage, pipeline system, etc. according to the actual needs of cold storage circulation.The quick-frozen warehouse is easy to load and unload. All the plates and walls of the quick-frozen warehouse are produced by molds. You can choose tens of millions of products. Professional cold storage installation, installation of cold storage, cold storage construction, fruit preservation cold storage, medical cold storage and transaction safety are guaranteed. Through internal concave convex groove connection, loading, unloading and handling are convenient. The installation period is short. Small and medium-sized cold storage can be delivered in - days The library body can be combined, separated or increased or decreased according to the needs of users.

comment list
©2009-2024Industrial Microblog  Sitemap