ArezzoDistribution transformer rankingThe market remains stable
release time:2024-04-19 12:35:22

When sampling from a small and medium-sized power transformer without a discharge pipe (or oil sample suspension plate) it can be in a power transformer such as a glass test tube when it is not in operation to extract the oil sample at the bottom, or it can be replaced by changing the oil.Outdoor sampling shall be carried out in sunny days or dry weather with low environmental humidity. During sampling, it is necessary to resolutely prevent the invasion of dirt such as rain, snow,ArezzoProcurement of dry type transformers, wind and sand.Arezzo,Precautions for trial operation of power transformer manufacturersDifferent diversion methods, dry-type transformers mostly use silica gel waterproof casing, while oil transformers mostly use porcelain waterproof casing;Kenitra, find the leakage point first, which can not be ignored. For the position with serious leakage, shovel or sharp punch can be selected. The leakage point can be riveted with special tools for metal materials. After manipulating the leakage, the treatment surface shall be cleaned and tidy. Polymer composite materials are mostly selected for dry consolidation. After dry consolidation, the goal of long-term treatment of leakage can be achieved.The raw materials of Fushi blue can be used for bonding, so that the overall oil leakage of the connector can be greatly controlled; If the actual operation is convenient, the metal shell can also be bonded at the same time to achieve the purpose of leakage treatment.


ArezzoDistribution transformer rankingThe market remains stable



Avoid aging and damage of power transformer iron core insulation: aging of iron core insulation or damage of waterproof sleeve holding anchor bolt will cause large vortex of iron core, and long-term scalding of iron core will lead to insulation aging.In fact, apart from the application of the Finance Bureau,ArezzoPrice of dry-type transformer shell, the industry has been trying to formulate and upgrade transformer commodities according to the specifications, so as to promote the improvement of energy consumption level of transformer commodities.When oil samples are used, the safety and fire safety technical specifications on the spot shall be strictly implemented.Sales Department,Power transformer is an idealized supporting facility transformer for medium cabinet and high-voltage cabinet at the present stage, and can be equipped with safety protective casing according to different waterproof grades. It is applicable to key or unique natural environment sites such as multi-storey buildings, commerce, airports, tunnel construction, chemical enterprises and factories.Oil leakage of cast iron partsOil leakage of bolt or pipe external thread


ArezzoDistribution transformer rankingThe market remains stable



Therefore, in the installation process of substation equipment, the lightning rod should be set according to the specific situation to prevent damage to the relay protection dry-type transformer caused by lightning. In addition, in the installation and use process of lightning rod, select reasonable types of lightning rod according to the operation situation to determine that they are in the same situation. In addition, during the installation of lightning rod, please connect all routes as far as possible to prevent other faults.Quality department,Avoid the load operation of power transformer: if the load operation is long-term, slow aging of insulation, short circuit fault between boxes, two-color short circuit fault or short circuit to ground fault and dissolution of oil.The grounding resistance of, high voltage and bottom voltage shall not be less than % (m & omega;) of the original value. The difference between the three-phase mean value of winding resistance measurement at the same temperature shall not exceed %, which shall not exceed % compared with the last accurate measurement result.High voltage fuse of transformer breaks one phase;Arezzo,The oil in the machinery and equipment of the oil storage tank shall generally stand for more than h before sampling; it is not necessary to stand when sampling on the running power transformer.After hours of continuous trial operation with a certain load, the main body and accessories of the transformer are all normal, and the transformer will turn to all normal operation.It includes the performance and main uses of insulating layer materials various insulating layer parts, solution process and quality standard coil inductance process of various ways of electromagnetic coil, overall suit process and quality standard of electromagnetic coil; Main performance parameters of ferrite core, cutting process of iron chip, core stacking process and quality standard, production process and quality standard of electromagnetic shielding.

comment list
  • Garbage removal service

    ArezzoDistribution transformer rankingThe quality is good, completely beyond expectations, and the delivery speed is very fast.

  • Art Nest Decoration Engineering Company

    Buying things online is about integrity, and you do it! Thank you ArezzoDistribution transformer ranking Like one Fast delivery, very good attitude, very satisfied! very good!

  • Recovery of energy and chemical catalysts

    One word! ! value! ! ! The service attitude is really good, ArezzoDistribution transformer ranking delivery is fast. The quality of the goods is also quite good. I like it so much, thank you.

©2009-2024Industrial Microblog  Sitemap