Trent StokeOil immersed transformerIndustry leader
release time:2024-05-05 00:32:31

Sound in case of phase failureSome are tied with plastic tape, and some immediately press the two edges together, because the socket can not be pressed firmly during installation,The efficiency of transformer is closely related to the output power level of transformer. Generally, the greater the output power, the smaller the loss to output power ratio and the higher the efficiency. On the contrary, the lower the efficiency.If the power transformer stops running for more than h (if the allowable time should be reduced when the ambient humidity is & amp; gt; %), it should be insulated before putting into use, and accurately measured with a V grounding megger. The insulation resistance from the primary side to the secondary side and the ground should be ^ mfl, the insulation resistance from the secondary side to the ground should be ^ mh, and the insulation resistance from the iron core to the ground should be & amp; gt; mfl (note that the grounding device piece should be removed).Khlong Luang,Therefore, in the installation process of substation equipment, the lightning rod should be set according to the specific situation to prevent damage to the relay protection dry-type transformer caused by lightning. In addition, in the installation and use process of lightning rod, select reasonable types of lightning rod according to the operation situation to determine that they are in the same situation. In addition, during the installation of lightning rod, please connect all routes as far as possible to prevent other faults.When oil samples are used the safety and fire safety technical specifications on the spot shall be strictly implemented.Naturally,Trent StokeOil change steps of oil immersed transformer, if the oil immersed transformer catches fire, please don't panic. I firmly believe that the damage will be reduced to a lower level as long as the above methods are effectively rectified. Above is the general process and process that should be paid special attention to in the whole ignition process of the oil immersed transformer. When the oil immersed transformer catches fire, please be rational to make the oil immersed transformer safer and more efficient.


Trent StokeOil immersed transformerIndustry leader



Under normal conditions, the actual operation of the oil immersed transformer shall be undertaken by the on-site operation and maintenance management staff. Within one week of grid connected operation, the operation and maintenance management staff shall improve the safety inspection range of the transformer, and immediately communicate and contact with the on-site project staff in case of any problems, so as to ensure the reliable and stable operation of machinery and equipment.How is the quality level of dry-type transformer compared with foreign countries?Dry type transformer factoryaverage method,Trent StokeDry type transformer 10 / 0.4kV,The method and whole process of taking oil sample of power transformer are as follows:Outdoor sampling shall be carried out in sunny days or dry weather with low environmental humidity. During sampling it is necessary to resolutely prevent the invasion of dirt such as rain, snow, wind and sand.Dry type transformer manufacturer


Trent StokeOil immersed transformerIndustry leader



The long-term overload of power transformer will slowly cause the scalding and insulation aging of solenoid coil, resulting in short circuit between coils, two-color short circuit or short circuit on the ground, resulting in the ignition of power transformer. Therefore, the insulation compressive strength of power transformer shall be tested before installation and operation, and overload is not allowed in the whole process of operation.For more, please check,Operation of oil immersed transformerAfter the power transformer has been used for a long time, common faults of iron core will occur. Don't worry. Contact the transformer manufacturer, and the manufacturer will assign professional technicians for inspection. The main reasons are as follows:Gradually,Trent StokeDry type transformer test, high-frequency vibration damping mechanical equipment, such as low-frequency vibration damping platform, is installed at the bottom of the dry-type transformer, which can reduce the downward dispersion of the vibration of the dry-type transformer. Then replace the connection between the dry-type transformer and the surrounding engineering buildings, roads, etc. with flexible connection, the dry-type transformer room can also be soundproofed and decorated, and sound-absorbing plates and silencing shutters can be used to improve the soundproofing capacity of the dry-type transformer room.Trent Stoke,The bearing capacity of each load is different. Generally, dry-type transformer should operate under rated capacity, while oil transformer has better load working capacity.Power transformer manufacturerThe raw materials of Fushi blue can be used for bonding, so that the overall oil leakage of the connector can be greatly controlled; If the actual operation is convenient the metal shell can also be bonded at the same time to achieve the purpose of leakage treatment.

comment list
  • lamp post

    When Trent StokeOil immersed transformer offer discount points for activities, contact me when there are discounts

  • Exhaust gas treatment equipment and accessories

    The quality is very good, really good, Trent StokeOil immersed transformer the same as the picture, the packaging and quality are also very good,

  • New rubber activator

    The logistics of Trent StokeOil immersed transformer is a bit slow. Overall it's good, I hope I have a chance to cooperate next time

  • Health care electrical equipment

    Trent StokeOil immersed transformerHow is the quality? Do you have it in stock?

©2009-2024Industrial Microblog  Sitemap