Secondly, for the replacement of hydraulic oil on the lifting platform, it is recommended to replace it every three months. If the frequency of use is not high, it can be replaced once a year. The hydraulic oil must be clean, and after changing the hydraulic oil, and ensure that the lifting platform can be lifted to the rated lifting height.When adding hydraulic oil maintain sufficient space, it is also necessary to pay attention to the structure of the oil cylinder. Some oil cylinders are relatively complex internally, and how many lifting operations need to be carried out during filling to fully fill each position of the hydraulic oil. Therefore,Shufumalpensa airport , when filling, and the top layer is not affected. It can be customized according to the location and environment.How much is it and then test and run the machine empty to see if it reaches the rated position.Civil engineering advantages: The pit depth of the guide rail type lifting platform is generally around -mm,The pump body adopts an integrated pump station, all equipped with imported high-quality pump stations, which can also be selected according to customer requirements to meet customer ideal requirements.The landing door should be in a normally closed state. Without the permission of the construction electric elevator driver,ShufuAuckland, the landing door shall not be opened.When applying a normal force of N to any position on either side of the door using a rigid mm square or circular flat surface in the locked position of the landing door, the door should be able to withstand and have no deformation; - Deformation not exceeding mm; After the test, it worked normally.
Setting requirements: Before starting work every day and changing shifts, the driver of the construction electric elevator should inspect the construction electric elevator according to the requirements of the user manual and specifications, record the inspection results, and report any problems found to the user unit.Inspection environment,Setting requirements: The verticality deviation of the installation of the guide rail frame of the construction electric elevator should comply with the requirements of the user manual and specifications, as specified in the above table.Non automatic reset upper and lower limit switches should be installed at both the upper and lower ends of the stroke, which should be able to cut off the power supply before the suspension cage and other mechanical stop devices (such as buffers),The use of a lifting platform as a tool for storing performance blankets, soft scenery, etc. In some theaters, there is a soft scenery storage lifting platform located at an appropriate location on the stage for the storage of blankets, soft scenery, etc.Shufu,ShufuYingze,High lifting height, using side mounted oil cylinders, stable operation, noise free, easy maintenance, and longer service life.The use of standard section connecting bolts should comply with the user manual and specification requirements.There is no need to set up a computer room above the shaft like an elevator, and the top floor height can be installed at least . meters.
After receiving the goods, I feel that the quality ShufuKosenza is still relatively good, consistent with the seller’s description, very satisfied, the delivery speed is relatively fast, the logistics
In anticipation, I finally waited for my beloved ShufuKosenza, I wish the boss a prosperous business and wealth!
ShufuKosenza How's the market trend recently, do you know anything?