RumeisaPrice of steel bar 50 cutterProgram customization
release time:2024-03-28 06:14:57

I-beam is a kind of economical section steel with better section mechanical properties. Its characteristics are as follows:Function of I-beam: where is I-beam mainly used?Rumeisa, Product description of galvanized pipe→ compared with general section steel it has the advantages of low cost,RumeisaGH4169 alloy pipe, high precision and small residual stress. It does not need expensive welding materials and weld detection, and saves about % of the manufacturing cost of steel structure.Garango,Xhy- series high hardness alloy I-beam; Undertake drawings and process wear-resistant pipes( Φ ≥mm); Undertake the processing and production of vulnerable parts of cement machinery; Welding technology consultation and service; The wear-resistant layer of alloy wear-resistant plate of high chromium heap welding flux cored wire series is mainly high chromium,RumeisaHow much is a 1.5-inch galvanized pipe, as well as manganese, molybdenum, francium and other components. The alloy carbide formed has strong stability at high temperature.The flange of H-beam is of equal thickness, the inner edge of the flange has a slope of : The rolling of H-beam is different from that of ordinary I-beam. Only one set of horizontal rolls is used. Because its flange is wide and has no inclination (or the inclination is very small), a group of vertical rolls must be added for rolling at the same time. Therefore, its rolling process and equipment are more complex than ordinary rolling mills. The maximum height of rolled H-section steel that can be produced in China is mm, which exceeds the welded composite section.Due to the relatively high and narrow section size of ordinary I-beam and light I-beam, the moment of inertia of the two main axes of the section is quite different, which makes it very limited in the scope of application. The use of I-beam shall be selected according to the requirements of design drawings.


RumeisaPrice of steel bar 50 cutterProgram customization



Heating surface pipes, economizers, superheaters, reheaters pipes for petrochemical industry, etc. for high-pressure boilers (working pressure is generally above MPa and working temperature is between ℃ ~ ℃)Classification by production methodThe finished product has smooth surface, low friction coefficient, flatness error + / - mm / m length, wear resistance and maximum temperature of ℃knowledge,b. The professional two-sided arc welding processing technology can complete the electric welding at a good position, which is not easy to have the disadvantages of staggered joint, welding deviation and incomplete penetration, and it is very easy to manipulate the welding quality.Alloy tube is widely used in our daily life, which provides us with great assistance. So what industries are alloy tubes applied to? Let&#;s follow the steps of all manufacturers and have a look together:Stages needing attention in the production and manufacture of alloy tubes


RumeisaPrice of steel bar 50 cutterProgram customization



After determining the reasonable pickling agent and polishing solution, it is very easy to carry out hot galvanizing for relevant alloy pipes. Use 'phosphating treatment' to degrease the pipes of electrolytic machine equipment, put them into the aqueous solution with zinc salt after pickling and passivation, connect the negative level of electrolytic machine equipment, put them into the cold-rolled steel plate in the direction corresponding to the pipes, and connect the switching power supply, If the current flows from the positive stage to the negative stage,c. quality inspection is carried out for alloy pipes, so that the whole process of steel pipe processing is under reasonable inspection and supervision, and the product quality is reasonably guaranteed. Cleaning: first clean the grease, dust and other substances attached to the surface of the galvanized pipe after cleaning.Mixed Scabs are distributed periodically, and the situation after casting and rolling is significant through edge flame peeling crack inspection or billet scratch flame removal.Rumeisa,a. In the forming process, the thick steel plate has uniform deformation, small internal stress and no scratch on the surface. The alloy pipe produced and processed has higher coordination ability in the scope of size, specification and model of diameter and wall thickness, especially in the production and manufacturing of steel structure design grade thick wall pipe, especially medium diameter small thick wall pipe, which has incomparable advantages of other processing technologies, and can meet a large number of customer regulations on the specification and model of alloy pipe. Peak crackAll the cracks occur at -mm away from the edge below the alloy pipe, and the macroeconomic orientation is vertical to the cold rolling orientation, showing a 'high mountain' shape.

comment list
©2009-2024Industrial Microblog  Sitemap