GutaElectric banner elevatorOperating procedures for installation and disassembly of lifting equipment
release time:2024-03-28 20:32:31

Small safe operation distance: Circuit voltage (kV) of external power lines<~~~ Small safe operation distance (m) Setting requirements: A small safe distance should be maintained between the outer edge of the construction electric elevator and the edge of the external overhead power line.Secondly, the lifting platform is driven by electrical energy and lifted by the hydraulic system. During operation, it is necessary to avoid irregular operations. To ensure the normal and orderly operation of the lifting platform and achieve the ideal unloading level, timely inspection of various functions is essential.Guta,. The shutdown device (emergency stop switch) should be installed outside the ground protective fence; b) Pulley room (if any. Pulley room refers to a room where only pulleys or speed limiters and electrical equipment are installed; c) hanging cage top, ifWhen the horizontal distance between the edge of the cage and the edge of the landing or between the cage and the landing door is greater than mm and there is no effective protection from other structures, the side protection device for the landing entrance should be equipped.Grand Baie,For customers to use and operate the lifting platform for a long time, the editor briefly introduces how to maintain and repair the lifting platform: First of all, normal maintenance is mainly focused on prevention, especially if any damage or malfunction is detected and corrected or repaired in a timely manner. Careful inspection and maintenance at this time can save costs and avoid larger problems, resulting in costly repairs.Manual pump: When the system malfunctions the manual pump can be operated to pump high-pressure oil to raise the car to the nearest floor positionSecondly, for the replacement of hydraulic oil on the lifting platform,GutaLEGO Electric Elevator, it is recommended to replace it every three months. If the frequency of use is not high, it can be replaced once a year. The hydraulic oil must be clean, and after changing the hydraulic oil, it must be automatically lifted and lowered to times to ensure that the air in the oil cylinder is completely discharged, maintain sufficient space, and ensure that the lifting platform can be lifted to the rated lifting height.


GutaElectric banner elevatorOperating procedures for installation and disassembly of lifting equipment



The counterweight guide rail should meet the specification requirements.During maintenance or when problems occur, the aluminum alloy electric elevator should be firmly fixed before maintenance can be carried out. It is strictly prohibited to operate with defects to avoid accidents.Manual pump: When the system malfunctions, the manual pump can be operated to pump high-pressure oil to raise the car to the nearest floor positionOK or not?,Acceptance: Concrete strength grade C, strength testing report.Manual pump: When the system malfunctions, the manual pump can be operated to pump high-pressure oil to raise the car to the nearest floor positionMechanical devices controlled by cage movement should not be used to open or close the landing door.


GutaElectric banner elevatorOperating procedures for installation and disassembly of lifting equipment



The verticality of the guide rail frame should meet the requirements of the specifications.How many?,Mechanical devices controlled by cage movement should not be used to open or close the landing door.Electric elevators should be regularly maintained and cleaned. During maintenance and cleaning, the bracket should be supported to prevent the electric elevator from overturning. Electrical and hydraulic systems should be maintained by professional personnel; When the battery level display is less than %Many theaters use a lifting platform as a vertical transportation tool for goods. The rear of the main stage or the end of the side stage in many theaters are equipped with a set container transportation lifting platform,Guta10 meter self-propelled elevator, which is used to vertically transport items from the ground to a designated location or even the stage plane. The lifting platform of the music pool is often used for transporting movable seats, etc.Guta,Flat screw mechanical electric lifting mechanism: The lifting platform of this structure has the advantages of small civil engineering coordination,GutaElectric elevator, large stroke, stable operation, low noise, accurate positioning and low cost. Adopting a horizontal screw drive and a scissor fork structure to achieve the lifting motion of the table, it can be stopped arbitrarily within the range of travel.The safety notice board for construction electric elevators should be prominently placed on the hanging cage for the rated load capacity and rated number of passengers of the construction electric elevator. It is strictly prohibited to use construction electric elevators beyond the rated load capacity or rated number of passengers.The distance between the electric hoist and overhead line in Electrical safety construction shall meet the specification requirements, otherwise protective measures shall be taken.


comment list
  • Boxin Cleaning Service Liability Company

    To live up to the boss's expectations of me, I will definitely write down my own evaluation objectively, fairly and truthfully, GutaElectric banner elevator is indeed very good, thank you!!!

  • In vitro diagnostic reagents

    Just paid, when will GutaElectric banner elevator arrive, boss.

  • Domestic marriage introduction service

    I finally received what I needed GutaElectric banner elevator, the stuff is very good, the price is good and the price is cheap, thank you boss! To be honest, this is my most satisfying shopping exper

  • Garbage removal service

    I'm busy, I forgot, I'm sorry, what else can I say~~ This GutaElectric banner elevator is really good, lucky enough.

©2009-2024Industrial Microblog  Sitemap