divisionDistribution transformer coreWhy does the air volume become smaller after using it for a long time
release time:2024-03-29 22:45:59
clearly put forward the glass test tube, rotate and release the oil in the tube to clean the sampling tube,divisionTransformer and box type substation, and then draw the oil sample.(I) the distance between the external contour of kV and below dry-type transformer and the surrounding guardrail or courtyard wall shall take into account the convenience of transportation and repair of dry-type transformer, and the distance shall not be less than m; At the angle with actual operation, a spacing of more than m shall be reserved; If metal fence is selected,division1000 kV Transformer, the metal fence shall be grounded and a warning sign shall be hung at a prominent position.division,Accurately measure the resistance of each phase winding and carry out the measurement. If there is a great difference, it is a common fault of the winding. Then carry out the appearance inspection of the iron core, and then accurately measure the inter chip insulation resistor by AC voltage and galvanometer method. If the damage is not large, paint the damaged part.Noise dispersion of dry-type transformerKwaksan,Before and after sampling, clean the periphery of the sampling port with clean or hairless linen.For no-load impulse closing of transformer, pay attention to the following matters:Power transformer plant


divisionDistribution transformer coreWhy does the air volume become smaller after using it for a long time



Therefore in the operation prevention and regulation of relay protection dry-type transformer, it is necessary to find the short-circuit fault point according to the fault situation, lock the fault point, and analyze the short-circuit fault types of relay protection dry-type transformer. At the same time, if all fields are clear, disconnect the switching power supply at the fault point, the maintenance work of employees will be carried out smoothly, and the harm will not expand to a greater extent.It should be said that after the development trend of these years, the overall level of China's transformer industry at this stage is basically international, and the quality level is no different from that of overseas goods& rdquo; The person in charge of the transformer Federation of China Household Appliance Industry Association said.Wiring mode of dry-type transformer:Inspection requirements,Oil leakage of bolt or pipe external threadIf the oil immersed transformer is burned by the cover of the transformer, when the oil immersed transformer fails, open the lower side of the transformer and place an appropriate part. When the oil immersed transformer is on fire, the oil cannot be released to avoid the occurrence of the oil immersed transformer. At the same time use detection equipment to put out the fire immediately. In order not to expand the hazard, the fire brigade must be notified.Power transformer plant


divisionDistribution transformer coreWhy does the air volume become smaller after using it for a long time



Sound in case of phase failureSincere service,If the above provisions are not met,divisionBox type oil immersed transformer, the problem of dryness shall be solved. Generally, it is OK to operate the centrifugal fan for a period of time. Check the cleanliness of the power transformer. If too much dust is found, it must be eliminated to ensure indoor ventilation and avoid insulation penetration. In particular, pay attention to cleaning the insulators of the power transformer and the top and bottom ends of winding resistance installation. Portable centrifugal fan or dry air compression or N shall be used to clean the dust in indoor space that is not easy to reach, and there shall be no dirt.After the power transformer has been used for a long time common faults of iron core will occur. Don't worry. Contact the transformer manufacturer, and the manufacturer will assign professional technicians for inspection. The main reasons are as follows:Before application, the sampling container shall be cleaned with vehicle gasoline, soapy water or other organic solvents (such as trisodium phosphate) except oil stains, and then washed with tap water until it is not alkaline, and the water can be evenly distributed from the bottle, and then cleaned with purified water for many times. The cleaned sampling container shall be dried in a ℃ drying oven. After refrigeration, the bottle cap shall be tightly closed and cannot be opened before application.division,The power transformer is composed of two or more electromagnetic coils wound around the same transformer core. The winding resistance is connected according to the alternating electromagnetic field and works according to the basic principle of magnetic effect of current. The installation position of power transformer shall be considered to be conducive to operation, maintenance and transportation, and a reliable area shall be selected at the same time. The rated capacity of the transformer must be effectively used when applying the transformer.When the new oil filled by the power transformer and the oil sample that has just been considered are used, the oil sample can be used only after sufficient standing.Outdoor sampling shall be carried out in sunny days or dry weather with low environmental humidity. During sampling, it is necessary to resolutely prevent the invasion of dirt such as rain, snow, wind and sand.