Dongbo FortJillHow to achieve high quality manufacturing
release time:2024-04-19 23:48:12

Setting requirements: When the distance between the outer edge of the construction electric elevator and the external overhead power line cannot meet the requirements of a small safety distance, the protective measures taken should comply with the specification requirements.The safety notice board for construction electric elevators should be prominently placed on the hanging cage for the rated load capacity and rated number of passengers of the construction electric elevator. It is strictly prohibited to use construction electric elevators beyond the rated load capacity or rated number of passengers.Dongbo Fort,And prevent it from starting normally. There should be no device that allows users to cancel warning signals.Buffer. In order to increase the energy for the car to hit the top or sink to the bottom. Remove rubber or sponge from the buffer and cabin to increase their impact energy; Rope groove slipping and other accidents caused the car to suddenly fall,Dongbo FortThree Rivers, resulting in a safety clamp. To prevent breakage of the lifting wire rope. A safety clamp that can simultaneously cut off the power supply and stop the car from falling should be removed from the car. A car without safety tongs is not allowed to ride or carry people. If it is a simple electric elevator,Dongbo FortSilverson, there should be a safety device (such as a safety stop pin) to prevent people from suddenly falling when loading and unloading goods in the car; Electric elevators with three or more floors (including three floors) for passengers or passengers.Calgary,The safety bulletin board for construction electric elevators should be hung at the protective shed of the electric elevator with a size of meters by meters.Spiral electric lifting mechanism: With all the functions of a regular lifting platform, the main feature is that the equipment occupies a small foundation pit and has a large stroke. The equipment has a height of only -mm and a travel distance of up to m. It is particularly suitable for buildings with stages built on two or more floors due to space constraints.Setting requirements: For construction electric elevators with foundations installed on roof slabs, floors, or other lower suspended structures, it can achieve the lifting of a double-layer tabletop. Multiple lifting platforms can be formed as needed, and different steps can be formed within the travel range to meet the needs of meetings and performances; Pavilion, Terrace, Tower Pavilion; Ideal props.Requirements for the operation platform of the construction lowering machine and the setting of the brake reset emergency stop switch: The shutdown device (emergency stop switch) should be able to stop or maintain the electric elevator (including the power driven door) in a non working stateSetting requirements: The wall bracket should use the manufacturer's matching standard products.How much is it,Spiral electric lifting mechanism: With all the functions of a regular lifting platform, the main feature is that the equipment occupies a small foundation pit and has a large stroke. The equipment has a height of only -mm and a travel distance of up to m. It is particularly suitable for buildings with stages built on two or more floors due to space constraints.Braking. The brake limit switch for partial motion control of the electric hoist traction machine. Assembly that restricts the operation of the lift car when it is opened to a high or low position; If the limit switch controls the overtravel switch. When the car travels to a high or low position, it will take on the function of raising or lowering. In order to prevent the lift car from crashing or sinking, stage equipment should be dismantled with over travel switches that can cut off power and cannot be automatically reset, rather than in the shaft; A buffer should be installed that can absorb the energy of the moving mechanism and reduce impact.To meet the needs of choreographers and choreographers in different plays, different heights of the lifting platform can be used to change the shape of the stage according to the requirements of the choreographers and choreographers, in order to adapt to the requirements of the plot for the scenery or venue, and save manpower and material resources for setting up. By using the tilting device of the lifting platform to form a tilted platform, a better highlighting effect can be achieved in various performances. According to the needs of the plot, special atmosphere and effects can be created. Even simple stage machinery often participates in performance activities, creating unexpected atmosphere and effects according to the needs of the plot. For example, using the low-speed descent of the lifting platform to represent a sunken ship in the sea, using the valves on the lifting platform and the sudden disappearance and appearance of actors on the lifting platform.


Dongbo FortJillHow to achieve high quality manufacturing



Setting requirements: The foundation and foundation of the construction electric elevator should meet the requirements of the user manual. Before installing the construction electric elevator, the foundation should be inspected and accepted according to the requirements of the specifications. Only after passing the inspection can the installation be carried out.Installation material list,Acceptance: Concrete strength grade C, strength testing report.The working principle of the aluminum alloy lifting platform is that hydraulic oil is composed of a vane pump to form a certain pressure,Dongbo FortDijon, which enters the lower end of the hydraulic cylinder through an oil filter, explosion-proof electromagnetic directional valve, throttle valve, hydraulic control one-way valve, and balance valveSetting requirements: Drainage measures should be set up for the foundation of construction electric elevators to ensure smooth drainage.Dongbo Fort, routine inspections should be carried out according to regulations and inspection records should be filled out.Installation verticality deviation guide rail frame erection height, h/mH≤ H& gt; verticality deviation/mm≤ (/h≤ ≤ ≤ ≤ pairs of steel wire rope construction electric elevators, the verticality deviation of the guide rail frame should not exceed (/) h.Setting requirements: The verticality deviation of the installation of the guide rail frame of the construction electric elevator should comply with the requirements of the user manual and specifications, as specified in the above table.


comment list
©2009-2024Industrial Microblog  Sitemap