DalianHousehold outdoor elevator on the third floorIntroduction to usage specifications
release time:2024-05-23 12:13:31

b. When the old elevator cannot start: due to the inability to enter the shaft, limited data can only be obtained from outside the shaft to determine whether it is non-standard (if there is a high platform in the machine room, the plane size of the shaft can be measured in the machine room,DalianAluminum alloy mast type lifting platform, but it is not accurate enough) for elevator quotation negotiation reference. In this case, the signing of the contract should state that the shaft rectification and costs are the responsibility of the user. For uncertain shaft structures and dimensions, users should be reminded to provide them to the elevator after the old elevator or notify the elevator to take measurements before the new elevator is put into operation.Measurement of elevator shafts in new construction projects under different on-site conditions: When the building design is not yet completed, the operator only needs to provide the user with the standard elevator layout of the required elevator specifications, and the user entrusts the design department to design the elevator shaft. When the architectural design has been completed, and the site has not yet been constructed, is under construction, or has been completed, it must be determined based on the current construction or measured dimensions. If the original civil design of the shaft needs to be modified,DalianHome mini elevator Small home elevator, the user should entrust the architectural design department to make the shaft design modification based on the layout provided by the elevator.Dalian, escalators let's talk about elevator and elevator safety knowledge: The elevators we currently use include box type passenger elevators, and dedicated cargo elevators. Dedicated cargo elevators are installed due to special needs, and we don't use many of them. Now, let's take a look at the safety knowledge of box type passenger elevators and escalators: When we take escalators, Be sure to follow the safety instructions when riding on the elevator. Do not crowd or play around, hold onto the elevator firmly, fasten your shoelaces, and avoid getting them caught up.When the normal power supply is cut off, the lighting inside the non fire elevator has no power, while there is still lighting inside the fire elevator.Buea, the length of the upper and lower platforms of the escalator can be increased to meet the actual dimensions of civil engineering. One platform can be extended on one side, or both platforms can be extended simultaneously. The total extension of the upper and lower platforms should generally not exceed mm. When lengthening the platform, attention should be paid to the length of the pit or the opening of the floor slab, which should also be lengthened at the same time. After the escalator is extended, the force on the upper and lower support points will also increase. If the edge distance of the beam increases too long, changing the angle of the escalator from degrees to degrees can also make the beam edge distance longer.怀怀“& rdquo; Elevator shaft: The design conditions are provided by the user to the architectural design department. The architectural design department analyzes whether the on-site pit depth, top floor height, reaction force, etc. can meet the installation requirements of the elevator, and develops a renovation construction plan. If it is indeed necessary to change the elevator structure due to civil engineering conditions (such as car size, door opening width, etc.), then consider the non-standard design of the elevator.


DalianHousehold outdoor elevator on the third floorIntroduction to usage specifications



The effective support width of the upper and lower support beams should be greater than the width of the escalator truss, and there should be embedded steel plates.When accidentally trapped in an elevator, one should remain calm, press the alarm bell inside the elevator, and call the elevator emergency rescue phone or community property phone for help. Do not open doors or mess with buttons, and patiently wait for rescue.Restore the command button function in the cabin for firefighters to operate.Where to sell APIThe front room of the fire elevator is equipped with indoor fire hydrants.b. When the old elevator cannot start: due to the inability to enter the shaft, limited data can only be obtained from outside the shaft to determine whether it is non-standard (if there is a high platform in the machine room, the plane size of the shaft can be measured in the machine room, but it is not accurate enough) for elevator quotation negotiation reference. In this case, the signing of the contract should state that the shaft rectification and costs are the responsibility of the user. For uncertain shaft structures and dimensions, users should be reminded to provide them to the elevator after the old elevator or notify the elevator to take measurements before the new elevator is put into operation.Brick concrete structure elevator shaft: For unfinished brick structure shafts, users can be required to make a circle of beams at a certain height, arranged on three sides, and disconnected on one side of the elevator entrance. The distance between the center heights of the beams depends on the product model, and should not exceed mm. The beam height should be mm,DalianTheater stage lifting platform, and the thickness should be the same as the wall. The lower ring beam is -mm away from the bottom of the pit, and the higher ring beam is -mm away from the lower surface of the shaft roof. The completed framework with a solid brick structure shaft can be equipped with steel plywood at the position of the fixed guide rail support frame. The position and size of the plywood are provided by the elevator, and the user is responsible for providing materials and construction. If the shaft structure is made of hollow bricks without ring beams, steel beams can be considered to be added between the frames for rectification.


DalianHousehold outdoor elevator on the third floorIntroduction to usage specifications



Brick concrete structure elevator shaft: For unfinished brick structure shafts, users can be required to make a circle of beams at a certain height, arranged on three sides, and disconnected on one side of the elevator entrance. The distance between the center heights of the beams depends on the product model, and should not exceed mm. The beam height should be mm and the thickness should be the same as the wall. The lower ring beam is -mm away from the bottom of the pit, and the higher ring beam is -mm away from the lower surface of the shaft roof. The completed framework with a solid brick structure shaft can be equipped with steel plywood at the position of the fixed guide rail support frame. The position and size of the plywood are provided by the elevator, and the user is responsible for providing materials and construction. If the shaft structure is made of hollow bricks without ring beams, steel beams can be considered to be added between the frames for rectification.Product line,Measure the beam edge distance between the upper and lower support beams. The measurement is to suspend the line from the upper support point to the ground for positioning, and then measure the horizontal distance from the positioning point to the edge of the lower support beam.The seat elevator person sits on a chair driven by an electric motor, and the button on the chair handle causes the power drive device at the bottom of the chair to drive the person chair up and down along the guide rail of the staircase railingThe household must make two steel splints above the entrance. The position and size of the clamp plate are determined based on the selected door machine model.Dalian,Measurement of elevator shafts in new construction projects under different on-site conditions: When the building design is not yet completed, and the site has not yet been constructed and the user entrusts the design department to design the elevator shaft. When the architectural design has been completed, is under construction, or has been completed, it must be determined based on the current construction or measured dimensions. If the original civil design of the shaft needs to be modified, the user should entrust the architectural design department to make the shaft design modification based on the layout provided by the elevator.Measure the length, width, and depth of the pit (if any), and observe whether there are grooves and embedded parts at the support beam.Tower style residential buildings above; Residential units and corridors with twelve or more floors; Other Class II public buildings with a building height exceeding meters; High rise buildings with elevators exceeding meters in height; The functional fire elevator has a front room. The area of the independent fire elevator front room is: the front room area of the residential building is greater than square meters; The front room area of public buildings and high-rise factory (warehouse) buildings is greater than square meters. When the front room of the fire elevator is shared with the smoke proof staircase, its area is: the area of the shared front room in residential buildings is greater than square meters, and the area of the shared front room in public buildings and high-rise factory (warehouse) buildings is greater than square meters.


comment list
  • car intermediary service

    The stuff is really good, but DalianHousehold outdoor elevator on the third floor the price is a bit more expensive, but it is still worth the money. This is the first time I bought it, thanks to your

  • Construction machinery rental

    Since searching and shopping online, you never have to go out and wander around. Your DalianHousehold outdoor elevator on the third floor quality is guaranteed, logistics and delivery are fast, big br

  • xuyao printing co.

    Iā€™m really sorry.

  • airport company

    Let me evaluate this DalianHousehold outdoor elevator on the third floor, the price is good, the quality is good, the delivery is good, and the boss is good.

©2009-2024Industrial Microblog  Sitemap