mercedesSelf propelled hollow grouting anchor manufacturerThe required weight can be adjusted to achieve the degree of use
release time:2023-01-23 03:57:52

In limestone area, the punching is not good, and it is difficult to sink the reinforcement cage. When the grouting pipe is deformed and blocked by unconventional means, the pipe is blocked due to the workers&#; carelessness and falling into small concrete blocks. The deformation and blockage of the grouting pipe bring great difficulties to the detection work, and even can not be detected. Therefore, when the grouting pipe is found blocked after the foundation pile is poured and before the inspection, effective measures should be taken to pass the pipe to ensure the smooth progress of ultrasonic inspection. Generally, there are three methods for passing the pipe: stabbing the grouting pipe with thick and long reinforcement, flushing and pigging with high-pressure water, and using a drill with a small drill to clean the hole.?mercedes Squeeze grouting or split grouting: depending on the grouting pressure, the grout is forced to open various channels in the underground layer to squeeze into the stratum. The grout is mostly consolidated in a vein or a tree shape. This grout can squeeze the soft bottom layer tightly, so it is also called compaction grouting in foundation reinforcement. Displacement grouting: the soil and sand in the injected stratum are forced out through certain methods, and the space formed is filled with grout, It is called displacement grouting High pressure mass injection grouting: the kinetic energy of jet flow is used for grouting.The longitudinal overlapping width of grouting pipe and grouting pipe shall not be less than cm, and the transverse overlapping width shall not be less than cm. The former shall be placed on the latter according to the asphalt paving direction. After laying the glass fiber grouting pipe, fix the glass fiber grouting pipe with high-quality cement nails and fixed iron sheets with a size of mm, mm and a thickness of .mm. The fixed spacing can be determined according to the actual construction situation.Grand Baie,The grouting pipe shall be cut with a toothless saw (grinding wheel clamp). Cutting by electric or gas welding is easy to damage the surrounding surface and cause local heating at the end, which significantly reduces its performance. During the use of the grouting pipe it is forbidden to take any form of heating deformation measures to avoid reducing the mechanical properties of the grouting pipe. performance of grouting pipe the grouting pipe is light in weight, has strong bite force with soil or gravel, is acid-base resistant, aging resistant and easy to construct. It has high tensile strength (- times higher than that before stretching) and low elongation (only % - % of that before stretching). It is easy to cut and connect on site (polyethylene rope or connecting rod can be used for connection), and it can also be overlapped (the grouting pipe with overlapping buckle has been developed and can be connected without other materials), and the bending effect during construction is small. However, poor mechanical damage resistance, and mechanical scars such as scratches and crushed stones will produce stress concentration,mercedesGrouting flower tube, which will reduce the overall mechanical properties of the grouting pipe and the grouting pipe.In limestone area, the punching is not good, and it is difficult to sink the reinforcement cage. When the grouting pipe is deformed and blocked by unconventional means, the pipe is blocked due to the workers&#; carelessness and falling into small concrete blocks. The deformation and blockage of the grouting pipe bring great difficulties to the detection work, and even can not be detected. Therefore, when the grouting pipe is found blocked after the foundation pile is poured and before the inspection, effective measures should be taken to pass the pipe to ensure the smooth progress of ultrasonic inspection. Generally, there are three methods for passing the pipe: stabbing the grouting pipe with thick and long reinforcement, flushing and pigging with high-pressure water, and using a drill with a small drill to clean the hole.


mercedesSelf propelled hollow grouting anchor manufacturerThe required weight can be adjusted to achieve the degree of use



The small editor of prestressed machines and tools will lead you to understand the main connection methods between the drive device and the wellhead: the connection between the flange of the drive head of the electric oil pump and the parallel flange is the most widely used one at present. There is a flange at the lower part of the drive head, and the size matches the flange of the Christmas tree wellhead.[] a flange I and a bearing are provided on the outer surface of the cutting rotating device The fast cutting device in the hole is installed in the grouting pipe hole through the flange. The fixed cutting device is mainly composed of a cutting blade and a pulley. The expansion and contraction diameter of the blade is adjusted by the bolts at the tail of the rotating flange to cut the grouting pipe. The rotating blade and the pulley are connected to the rotating device through slots.[] the outer diameter of the cutting rotary device is mm smaller than the inner diameter of the grouting pipe, so that the device can smoothly extend into the grouting pipe for cutting.Can the stretching speed of grouting pipe be defined?plan,The foundation pit excavation shall strictly follow the principle of 'layered excavation'. The support erection shall be closely coordinated with the earthwork excavation. During the excavation, the earthwork near the grouting pipe shall be excavated by the central trenching method to prevent the machinery from colliding with the support; The earthwork near the slope protection pile shall be excavated manually with small machines and tools. It is forbidden to collide with the grouting pipe and bored pile by mechanical excavation. After the earthwork is excavated to the design elevation, the grouting pipe shall be erected and prestressed in time to reduce the exposure time without support.Can the piston rod of the grouting pipe be protected to avoid being bruised and accelerating leakage? It is safe and does not need to be welded on site.


mercedesSelf propelled hollow grouting anchor manufacturerThe required weight can be adjusted to achieve the degree of use



It has good air tightness, low gas permeability, strong sealing and no leakage.Affordable price, The length can be matched according to the construction requirements, without loss.[claim] A fast cutting device in a hole of a underground grouting pipe, which is characterized in that the fast cutting device in the hole mainly consists of a fixed cutting device , a tension blade device and a cutting rotating device . The tension blade device is sleeved in the cutting rotating device , and screw threads are respectively set on the outer surface of the cutting rotating device and the upper end of the tension blade device ,mercedesAdvance small conduit in stock, The tension blade device and the cutting rotating device are connected by threads. The tension blade nut is arranged at one end of the tension blade device protruding from the cutting rotating device. The fixed cutting device is mainly composed of a cutting blade and a pulley . The cutting blade and the pulley are respectively connected to both sides of the cutting rotating device through slots. Flange plates (I) and bearings are arranged on the outer surface of the cutting rotating device , The fast cutting device in the hole is installed in the grouting pipe hole through a flange plate, and the fixed cutting device is connected with the flange plate through bolts. The grouting pipe is used as the pipe for grouting at the bottom of the pile. The test shows that the bearing capacity of the cast-in-place pile treated with the pile bottom grouting can be greatly improved At the same time, the grouting pipe can also be used as the pipe for the defect washing and grouting treatment of the accident pile. At this time, it is necessary to take measures to punch the pipe at the defect position where grouting is required. The classification of the grouting pipe can be divided into three categories according to the pipe materials: the advantages of steel pipe steel pipe are that it is easy to install, and it can be welded on the reinforcement frame by electric welding, which can replace part of the reinforcement section, and because of the large rigidity of the steel pipe After embedding the parallelism and straightness can be basically maintained. At present, many large-diameter cast-in-place piles use steel as the grouting pipe. However, the price of steel pipe is relatively expensive: steel corrugated pipe steel corrugated pipe is a better grouting pipe material. It has the characteristics of thin pipe wall, less steel, impermeability, pressure resistance, high strength and good flexibility. It is usually used for post tensioning reserved holes in prestressed structures: when used as grouting pipe. It can be directly bound to the reinforcement framework soil, and the joint can be connected with a larger corrugated sleeve. Since the bellows is light, it is very convenient to operate, but attention should be paid to keeping its axis straight during installation.mercedes, it is a mechanism of dispersing the force on each hole belt and forming a resultant force.In the process of using the acoustic pipe, so that it can be used normally and improve the application quality of the grouting pipe. In the process of installing Jiangsu acoustic measuring tube, we should pay attention to the orientation of the installation hole. As long as the device is installed in a correct hole, the resistance of Jiangsu acoustic pipe will appear in the process of application and the service life of Jiangsu acoustic tube can be improved. This is also the most important factor in the process of application in the future. If the hole fault is bragged about in the process of the device, resulting in its damage. There is a great relationship between the accuracy of the hole and the quality after construction. In the process of construction, it is necessary to use the device according to the planned paper so that it can be used normally and improve the quality of use.In the process of application, because there will be many Jiangsu acoustic measurement pipes in the process of construction. In this way, the phenomenon of uneven stress will be formed. In the process of application, the phenomena of conflict and unusable will be formed. In order to prevent the phenomenon of surrounding each other, it is necessary to pay attention to the method of the device in the process of the device, so that it can be used normally. The grouting pipe manufacturer introduced that the product quality of the grouting pipe is relatively stable and when the mold is finalized, it is not easy to show defects. Most of the defects of the grouting pipe appeared in the trial production period, and most of them were formed due to the unreasonable planning structure of the mold. The grouting pipe manufacturer will briefly introduce the treatment methods of defects as follows: wrinkle appearance and treatment methods. The so-called wrinkle refers to that there is a convex edge on the circular arc surface of the grouting pipe, and there is a concave appearance on the adjacent side. This kind of wrinkle is mostly in the shape of sharp ridges, some of which are straight to the nozzle,mercedesSelf drilling hollow anchor manufacturer, and often occur symmetrically at both ends of the center line, in the shape of 'eight'. Chengdu grouting pipe manufacturers mostly occur on the inner arc surface, and some occur on the outer arc surface.How to deal with the joint if the grouting pipe is installed in sections? If the grouting pipe is installed in sections, the joints must be welded. The welded joints of the section steel have been prepared in the manufacturing plant, and can be installed after the two-phase adjacent joints are aligned. After all beams are welded, anchor them according to the above steps. Install the formwork at the beam end. The formwork shall be made according to the overall dimensions of Hainan grouting pipe device and the notch of the reserved slot. The formwork shall be made quite tight to prevent mortar from flowing into the displacement control box or into the beam end gap.After checking that the installed formwork is tight and seamless, clean the reserved groove, then pour concrete and vibrate it tightly. The concrete shall have at least the same strength as the structural concrete at this place, and the grouting pipe device in Hainan shall be kept clean when pouring concrete.


comment list
  • scanner

    Just received the goods, very good, mercedesSelf propelled hollow grouting anchor manufacturer great value for money! ! Come in the future!

  • Kaiyuan Water Supply Technology Company

    mercedesSelf propelled hollow grouting anchor manufacturer Very good, good quality and low price, express delivery is also fast, and inspection is also very standard.

  • Development of water treatment equipment

    Old acquaintances, things are as good as always, genuine mercedesSelf propelled hollow grouting anchor manufacturer, outstanding cost performance

©2009-2024Industrial Microblog  Sitemap