SolotonGrouting pipeIt is applicable to the application and forming process in environmental protection and dust removal industry
release time:2023-05-12 03:49:47

● specification: inner diameter of secondary grouting pipe: mm; Outer diameter: mm; Inner diameter tolerance: & plusmn; .mm; Length of each roll: m.It is used to seal the construction joints, cold joints pipe seepage joints and gaps between ground walls in concrete. It is very suitable to install grouting pipes between the joints of new and old concrete. When water seeps into the joint, the PVC port slurry on the surface can be set to seal the joint. The appropriate grouting time can be selected at the end of concrete curing. Leakage joints can also be sealed with this. Provide long-term grouting pipe, steel flower pipe, advance small pipe, high-pressure grouting pipe, pipe shed pipe, grouting pipe factory, old brand, price advantage and quality guarantee! In the embedded grouting pipe, the slurry can seal the construction joint, cold joint, grouting pump and the lowered grouting pipe are connected for grouting,SolotonGrouting pipe, and the grouting is carried out according to the requirements. The grouting pump will inject the slurry into the soil. After completing the construction of one grouting section, move the grouting pipe up or down according to the requirements to carry out the construction of the next grouting section.A -m long orifice pipe is installed at the opening of the grouting hole to prevent possible hole collapse. At the same time, it is used to install orifice closure device to prevent slurry leakage.SolotonGrouting pipeIt is applicable to the application and forming process in environmental protection and dust removal industry,2023-05-1203:49:47● features: the grouting pipe is divided into secondary grouting pipe (ccll-y grouting pipe, qdm-it grouting pipe, ccll-y full section grouting pipe) and repetitive grouting pipe (ccll-d grouting pipe ccll-d full section grouting pipe)Process flow: drill in place → Drilling → Mud injection → Run casing → Continue drilling → Slag removal → Hole cleaning → Hoist the reinforcement cage → Water jetting and bottom cleaning → Concrete conduit → Placing concrete → Catheter & rarr; The pile top reinforcement can be divided into single liquid silicification method,SolotonSteel pipe, double liquid silicification method, aerated silicification method and electric double liquid silicification method.

SolotonGrouting pipeIt is applicable to the application and forming process in environmental protection and dust removal industry


The secondary grouting pipe can only be grouted once and cannot be reused.After the grouting hole is drilled, install and lower the grouting pipe,SolotonSeamless pipe, grout stop plug, mixer and other facilities in the hole.Soloton,Baherden,Process flow: drill in place → Drilling → Mud injection → Run casing → Continue drilling → Slag removal → Hole cleaning → Hoist the reinforcement cage → Water jetting and bottom cleaning → Concrete conduit → Placing concrete → Catheter & rarr; The pile top reinforcement can be divided into single liquid silicification method, double liquid silicification method, aerated silicification method and electric double liquid silicification method.

comment list
©2009-2024Industrial Microblog  Sitemap