Ann BenSteel pipeEnterprises are full of challenges
release time:2024-03-16 00:11:05

The secondary grouting pipe can only be grouted once and cannot be reused.Process flow: drill in place → Drilling → Mud injection → Run casing → Continue drilling → Slag removal → Hole cleaning → Hoist the reinforcement cage → Water jetting and bottom cleaning → Concrete conduit → Placing concrete → Catheter & rarr; The pile top reinforcement can be divided into single liquid silicification method, double liquid silicification method, aerated silicification method and electric double liquid silicification method.

Ann BenSteel pipeEnterprises are full of challenges


According to the sequence of sectional construction along the stratum depth, grouting can be divided into sectional downward,Ann BenPrecision tube, sectional upward and sub full depth grouting. The segmented downward type is to start from the ground, drill section holes from top to bottom and inject section slurry. After each injection section, so as to alternately carry out until the designed final grouting depth, and then carry out re grouting from bottom to top; The sectional upward pattern is that the grouting hole is drilled to the final grouting depth at one time. All kinds of grouting pipes, steel flower pipes, advance small conduits, high-pressure grouting pipes, pipe shed pipes and the formal qualification of grouting pipe factory are welcome to inquire by telephone and sincerely invite cooperation! Grout stop shall be used for bottom-up sectional grouting; The secondary full depth grouting method is to drill the grouting hole to the final grouting depth,Ann BenSteel pipe, and then conduct secondary grouting for the full depth.The slurry stop plug used in the slurry stop plug grouting method is the key device to seal the grouting borehole and realize segmented grouting. A good slurry stop plug shall ensure normal operation under the grouting pressure of more than MPa. According to its structure and action principle the currently used slurry stopper can be divided into mechanical type and hydraulic type. Among them,2024-03-1600:11:05The grouting mechanism includes filling grouting the mechanical slurry stopper is relatively simple and reliable and is widely used. - is several commonly used slurry stopper structures.Ann BenSteel pipeEnterprises are full of challenges, infiltration grouting, compaction grouting and splitting grouting. Grouting materials include granular slurry and chemical slurry. Granular slurry is mainly cement slurry, and chemical slurry includes silicate (water glass) and high slurry. Silicification method, alkali solution method, high chemical grouting method and cement grouting method.The secondary grouting pipe can only be grouted once and cannot be reused.

Ann BenSteel pipeEnterprises are full of challenges


The secondary grouting pipe can only be grouted once and cannot be reused.The grout stop plug grouting method is generally used for Rock Fissure Grouting. The grouting pipe is provided with a grout stop plug, which can close the upper part of the grouting section. The main construction steps are as follows: the grouting hole is drilled by a rotary drill. All grouting holes in the rock stratum are required to be drilled by coring in order to find out the and distribution of rock stratum fractures. The coring rate shall reach ~ % in the rock stratum and % in the broken rock stratum. The drilling cleaning fluid is mainly clean water. If the rock is broken and the hole collapse is serious,Energodar,● features: the grouting pipe is divided into secondary grouting pipe (ccll-y grouting pipe,Ann BenGrouting pipe, qdm-it grouting pipe, ccll-y full section grouting pipe) and repetitive grouting pipe (ccll-d grouting pipe, ccll-d full section grouting pipe)

comment list
©2009-2024Industrial Microblog  Sitemap