RovaniemiExpanded shell hollow grouting anchor manufacturerPrinciples of industry distribution
release time:2024-04-25 03:05:41

The existence of grouting pipe mesh restricts the lateral movement of soil. The lateral sliding deformation of the soil is limited by friction and interlocking engagement between the grouting pipe and the sand particles and the passive resistance of the sand particles to the grouting pipe, forming a good interlocking effect, so that the soil has better overall shear strength and bending stiffness.It is required to ensure that at least one embedded reinforcement is firmly welded with the anchor ring of maolehan grouting pipe within every meter along the joint direction. The quality of XF type grouting pipe should be carefully checked. If deformation or inconsistent spacing between two steel beams is found, it should be repaired. If necessary, the steel beam spacing of maolehan grouting pipe shall also be adjusted according to the ambient temperature during installation. XF type grouting pipe device shall be slowly put into the groove, so that the center line of the joint coincides with the center line of the actual reserved joint, and the deviation shall not exceed mm. Meanwhile, the inner edge of the steel side beam shall be kept vertical. After the XF grouting pipe is in place, the top surface of its steel beam shall be adjusted according to the longitudinal, transverse slope and elevation to be ~ mm lower than the adjacent asphalt concrete pavement and shall not exceed the pavement elevation.Rovaniemi,[] Middle label: refers to flange, refers to fixed cutting device, refers to tightening blade device, refers to tightening blade nut, refers to cutting rotating device, refers to cutting blade, refers to pulley and refers to bearing. After the two pipes are connected by using the deformation of the grouting pipe, the kneading part of the joint is large at both ends and small in the center, so that the joint is stuck at one time,RovaniemiSupport small conduit, avoiding the possibility of loose union. The grouting pipe has proper, stable and excellent s in terms of tensile pull-out and torque resistance, and the protrusion is circular arc with small protrusion, which is useful to avoid collision with conduits, vibrators, etc.Haapsalu,The commonly used standard for grouting pipe is the inner diameter of -mm. The wall thickness of the pipe has little effect on the sound transmission, so there is generally no need to restrict the thickness of the pipe wall. However, from the perspective of saving steel consumption, it is OK if the pipe wall can bear the lateral pressure of new concrete, not necessarily the thicker the better.Appropriate measures shall be taken to prevent surface water, curing water and garbage from falling in. When necessary, a sump shall be set, which can be set in the basement according to the above method, or set outdoors as a temporary facility. Usually, we use the waterproof scheme between the grouting pipe and the water surface or before, and there are many methods for the grouting pipe to stop water in advance. It should be noted that the design unit should participate in the review of the construction organization design of the basement, so as to determine a complete implementation scheme of advanced water stop before the excavation of the foundation pit and the pouring of the cushion. Otherwise, which will affect the integrity and rationality of the whole water stop scheme.Answer: Yes, it can be protected. The piston rod can be protected by adding plastic hoses or bellows within the travel range.


RovaniemiExpanded shell hollow grouting anchor manufacturerPrinciples of industry distribution



It is applicable to the laying of buried pipes in gas pipeline projects, and is not applicable to the use of open pipes. The service life of pipes will be affected by the perennial ultraviolet corrosion of sunlight. How to use the grouting pipe after rusting will not affect its . The grouting pipe is a kind of rubber plate we often see. It is widely used and has a long service life. It has been praised and recognized by people. Next, I will introduce the relevant knowledge of the grouting pipe we produce in detail![] when the utility model is in use,RovaniemiGrouting hollow anchor manufacturer, the flange plate is used to fix the utility model and the flange plate of the underground grouting pipe, the bolt is rotated with a tool, the cutting blade is adjusted to a certain position by the screw on the bolt, and then the screw cap of the blade is rotated and tightened to make the cutting blade and the pulley contact the inner surface of the grouting pipe with a certain contact force, that is, neither loose nor tight. The cutting blade and the pulley are directly inserted into the concave groove of the rotating device through the slot, and the cutting rotating device is fastened and rotated by a wrench or a tooth wrench, and the pulley and the blade are driven to rotate by the rotation of the bolt, thereby rotating the casing. The pulley is located on the other side of the rotating device, corresponding to the blade. It is mainly used to reduce the friction between the rotating device and the casing wall, and fix the position of the blade in the casing, so as to prevent the blade on one side from shifting during cutting, failing to achieve the cutting purpose, so as to drive the pulley and blade to rotate. The cutting rotating device cuts the casing. When the casing is cut to a certain depth,When the grouting pipe is laid it shall be kept flat and tight without wrinkling, so that the grouting pipe has effective tension. After laying, it shall be rolled again with a clean steel wheel roller. Most urban roads use glass fiber grouting pipes with self-adhesive. The diameter of the glass fiber grouting pipe is . ~ times of the maximum particle size of the asphalt concrete surface aggregate. The ultimate tensile strength should be greater than kN / m, so as to give play to the anti reflection crack performance of the glass fiber grouting pipe. It can also ensure the shear resistance and adhesive force of the adhesive layer of the glass fiber grouting pipe.In limestone area the punching is not good, and it is difficult to sink the reinforcement cage. When the grouting pipe is deformed and blocked by unconventional means, the pipe is blocked due to the workers&#; carelessness and falling into small concrete blocks. The deformation and blockage of the grouting pipe bring great difficulties to the detection work, and even can not be detected. Therefore, when the grouting pipe is found blocked after the foundation pile is poured and before the inspection, effective measures should be taken to pass the pipe to ensure the smooth progress of ultrasonic inspection. Generally, there are three methods for passing the pipe: stabbing the grouting pipe with thick and long reinforcement, flushing and pigging with high-pressure water, and using a drill with a small drill to clean the hole.The grouting pipe with the grouting pipe as the core flexible element can be compensated in the axial, lateral and angular directions on the pipeline. From the perspective of its performance, but because it is limited by casing and other accessories, the user needs to indicate the displacement in several directions when selecting and ordering, so as to select correctly. The working principle of the grouting pipe is to use its own elastic deformation to compensate the axial, angular, lateral and combined displacement of the pipe due to thermal deformation, mechanical deformation and various mechanical vibrations. The compensation has the s of sealing, pressure resistance, temperature resistance, corrosion resistance, impact resistance, vibration reduction and noise reduction, which can reduce the deformation of the pipe and improve the service life of the pipe.


RovaniemiExpanded shell hollow grouting anchor manufacturerPrinciples of industry distribution



Can the stretching speed of grouting pipe be defined?Quality documents,The bi-directional tensile plastic mesh false roof used in underground coal mine with mine grouting pipe is specially designed and manufactured for the false roof support of underground coal mining face and roadway wall support. It is made of several high molecular polymers and filled with other modifiers through heating, extrusion, molding, punching stretching, it has light weight coiling and other processes. Compared with metal textile mesh and plastic woven mesh shaping, high strength, isotropy, and antistatic, It is a new type of mesh grouting pipe material for underground coal mine support engineering and civil engineering.:. High pressure jet grouting: the slurry is transported by a high-pressure pump, and generates a jet flow with huge kinetic energy through a special nozzle. It cuts the bottom layer, mixes with gravel and sand particles, and coagulates. This is called high-pressure jet grouting.The grouting pipe at the tensioning end has good anchoring energy and self anchoring energy. Grouting pipe is generally used for tensioning. The grouting pipe at the tensioning end is composed of four parts: clip, anchor plate, anchor base plate and spiral reinforcement. The clip is the key part of the anchoring system. It is two-piece and made of high-quality alloy steel.Rovaniemi,The use of grouting pipes has become indispensable in modern building construction, ranging from super high-rise and high-rise buildings to multi-storey buildings and indoor decoration construction. China has a longer history of using grouting pipes. Many of China&#;s ancient buildings have been listed as world-class material and cultural heritage, because China&#;s ancient buildings are very technical in construction. In China, before and in the early s, grouting pipes made of bamboo and wood were used in the construction of buildings. After the mounting bracket is welded on the surface of the grouting pipe, push the strain gauge in a stable and free state without bending and twisting; The mounting bracket and strain gauge shall be installed parallel to the support axis; When tightening the screw, pay attention to reasonably controlling the frequency of the strain gauge; The installation position of the strain gauge shall be selected at the position suitable for protection as far as possible.The following aspects shall be paid attention to during the construction of grouting pipe: when the construction personnel are binding reinforcement and erecting formwork, reliable fixation measures must be taken for the buried grouting pipe to avoid displacement during concrete pouring and ensure the correct position of the grouting pipe in the concrete. When fixing the grouting pipe, only the allowable part of the grouting pipe can be perforated, and the body part shall not be damaged. The grouting pipe shall be fixed according to the construction specifications required by the design. The common fixing methods are: using additional reinforcement; Fixed with special fixtures; Fix with lead wire and formwork. No matter what fixing method is adopted, the grouting pipe must be positioned accurately, without damaging the effective part of the grouting pipe, so as to facilitate concrete pouring and tamping. During the construction of the grouting pipe, there are many sharp stones and sharp edged reinforcement in the concrete, so when pouring, vibrating and positioning the grouting pipe, attention should be paid to the impact force of pouring and vibrating, so as to avoid piercing the grouting pipe due to excessive force.?The stability of the grouting pipe is one of the important factors to control the stability of the whole foundation pit. Its erection must be accurate and in place,RovaniemiLeading small conduit production, and prestress must be applied in strict accordance with the design requirements. In particular, attention should be paid to the stability of the diagonal bracing. During the diagonal bracing operation every link of the installation must be carefully operated. At the same time, the steel purlin must also ensure its stability, strength and deformation requirements during the production and installation process. In addition, During the whole construction process from foundation pit grouting pipe erection to removal, the grouting pipe must be strictly monitored to ensure its stability. How to improve the bearing capacity of piles with grouting pipes in bored piles, during the drilling process of large-diameter cast-in-place piles, the soil layer around the piles will become loose due to the agitation of the turning heads. In addition, the water immersion makes the soil layer that has started to loosen more loose. This problem can be effectively solved by grouting with grouting pipes. How to improve the bearing capacity of piles when grouting with grouting pipes?


comment list
  • New energy equipment

    RovaniemiExpanded shell hollow grouting anchor manufacturer It’s good, the price is right, friends also say it’s good, it’s worth it

  • Production and sales of ship accessories

    I didn’t expect online shopping to be so interesting. Under the guidance of the seller, I finally learned online RovaniemiExpanded shell hollow grouting anchor manufacturer, thank you!

  • Donggu Port Jiachuan Company

    Happy cooperation and tight packaging. Let’s talk about business services: Like

©2009-2024Industrial Microblog  Sitemap