VasaElectric elevatorQuotation
release time:2024-04-25 19:03:15

Setting requirements: The spacing of wall brackets along the vertical direction should comply with the provisions of the user manual.Tank oil temperature protection: When the oil temperature in the tank exceeds the standard setting value, the oil temperature protection device sends a signal to suspend the use of the elevator. The elevator can only be started when the oil temperature dropsVasa,Fully autonomous lifting is widely used in various high-altitude work fields, such as factory maintenance, airport maintenance, street light maintenance, and so on; How to use electric elevators correctly to extend the service life of the equipment and be flexibleThe verticality of the guide rail frame should meet the requirements of the specifications.Lidkoping,Steel wire ropes, pulleys, and counterweight steel wire ropes shall comply with the following regulations: the characteristics of steel wire ropes shall comply with the requirements of General Purpose Steel Wire Ropes GB/T; Maintenance,VasaElectric rope climbing machine elevator, wear, deformation, and corrosion of steel wire ropesAcceptance: Concrete strength grade C, strength testing report.The distance between the electric hoist and overhead line in Electrical safety construction shall meet the specification requirements, otherwise protective measures shall be taken.


VasaElectric elevatorQuotation



The scissor type electric elevator is a widely used high-altitude operation special equipment. Its scissor mechanical structure ensures high stability of the lifting platform, and high bearing capacity, making the high-altitude operation range wider and suitable for multiple people to work simultaneously. It makes high-altitude operation more efficient and saferBefore use, we should observe whether there is any damage to the electric elevator. We can conduct a no-load test to raise and lower it. If there are any damaged parts they should be replaced in a timely manner to prevent major accidents.When the wall bracket cannot meet the requirements of the construction site,Setting requirements: For construction electric elevators with foundations installed on roof slabs, floors or other lower suspended structures, the bearing capacity of the foundation support structure should be checked. Click here to download the construction technical information for free. Basic drainage facilities should be installed.Braking. The brake limit switch for partial motion control of the electric hoist traction machine. Assembly that restricts the operation of the lift car when it is opened to a high or low position; If the limit switch controls the overtravel switch. When the car travels to a high or low position, it will take on the function of raising or lowering. In order to prevent the lift car from crashing or sinking, stage equipment should be dismantled with over travel switches that can cut off power and cannot be automatically reset, and installed in the machine room, rather than in the shaft; A buffer should be installed that can absorb the energy of the moving mechanism and reduce impact.With the continuous improvement of urbanization level in China, the number of high-rise buildings in urban areas has sharply increased and the height of buildings has also continued to grow. This has created a demand for high-altitude lifting platform vehicles. Therefore, in order to meet the needs of the domestic market and the public,When the distance between the outer edge of the construction electric elevator and the edge line of the external overhead power line cannot meet the requirements in the table above, effective protective measures should be taken.. The shutdown device (emergency stop switch) should be installed outside the ground protective fence; b) Pulley room (if any. Pulley room refers to a room where only pulleys or speed limiters and electrical equipment are installed; c) hanging cage top, ifThe entrance of each landing platform must be equipped with a landing door, which must open towards the landing platform side,VasaElectric water gate elevator, and the door bolt must be set on the side next to the construction electric elevator.Vasa,Installation verticality deviation guide rail frame erection height, h/mH≤ H& gt; verticality deviation/mm≤ (/h≤ ≤ ≤ ≤ pairs of steel wire rope construction electric elevators, the verticality deviation of the guide rail frame should not exceed (/) h.To ensure safe and reliable braking of the lifting platform and prevent accidents, a hydraulic control one-way valve, also known as a hydraulic lock, is added to ensure safe self-locking in the event of an accidental rupture of the hydraulic pipeline. An overload sound control alarm has been installed to distinguish between overload or equipment failure. Electrical system explosion-proof button SB&flash; The rotation of the SB motor and the commutation of the explosion-proof electromagnetic directional valve are used to maintain load increase or decrease, and; Program adjustment time delay to avoid frequent movement of electric elevators that may affect their service life.Mechanical devices controlled by cage movement should not be used to open or close the landing door.


comment list
©2009-2024Industrial Microblog  Sitemap