ShanxiAutomatic sheet turnover machineHow do we choose according to our own needs?
release time:2024-05-10 11:19:29

Tower style residential buildings above; Residential units and corridors with twelve or more floors; Other Class II public buildings with a building height exceeding meters; High rise buildings with elevators exceeding meters in height; The functional fire elevator has a front room. The area of the independent fire elevator front room is: the front room area of the residential building is greater than square meters; The front room area of public buildings and high-rise factory (warehouse) buildings is greater than square meters. When the front room of the fire elevator is shared with the smoke proof staircase, its area is: the area of the shared front room in residential buildings is greater than square meters, and the area of the shared front room in public buildings and high-rise factory (warehouse) buildings is greater than square meters.Electrical components are roughly divided into screens, etc. It is the brain of the elevator and the central nervous system of the elevator. The movement, operation, and door opening and closing of the elevator are all controlled by it so it must be treated as a top priority in daily maintenance work. Do not short circuit the elevator circuit inside the screen during work. When the elevator door system malfunctions, someone shorts the elevator door for convenience in order to find the fault. This is very dangerous, and there are many accidents when shorting the door. Why? If a person opens the hall door and extends their head inward, the elevator happens to run up or down to this point, and the hall door is shorted,ShanxiUnloading hydraulic tipping machine, the elevator cannot stop, so an accident is highly likely to occur. So in our daily maintenance work,ShanxiAluminum alloy high-altitude lifting platform, we must not short-circuit the safety circuit. If it is necessary to short-circuit, we must identify which safety component has a problem and which safety component needs to be shorted. Moreover, after maintenance or urgent repairs are completed, we must promptly remove the short-circuit wire. Professional household elevator manufacturer, with a large quantity and excellent quality at a reasonable price. It is fire-resistant, waterproof, high-temperature resistant, sturdy and durable, safe and reliableShanxi,Household elevators have gradually become an essential vertical transportation tool for modern single family, duplex,ShanxiAluminum alloy movable lifting platform, multi story, villa and other residential buildings, practical and convenient, and even a beautiful scenery in the home.Measurement of elevator shafts in new construction projects under different on-site conditions: When the building design is not yet completed, the operator only needs to provide the user with the standard elevator layout of the required elevator specifications, and the user entrusts the design department to design the elevator shaft. When the architectural design has been completed, and the site has not yet been constructed, is under construction, or has been completed, it must be determined based on the current construction or measured dimensions. If the original civil design of the shaft needs to be modified, the user should entrust the architectural design department to make the shaft design modification based on the layout provided by the elevator.Tallaght,The front room of the fire elevator is equipped with Class B fireproof doors or fireproof rolling shutters with stopping function.When the normal power supply is cut off, the lighting inside the non fire elevator has no power while there is still lighting inside the fire elevator.Restore the command button function in the cabin for firefighters to operate.


ShanxiAutomatic sheet turnover machineHow do we choose according to our own needs?



Tower style residential buildings above; Residential units and corridors with twelve or more floors; Other Class II public buildings with a building height exceeding meters; High rise buildings with elevators exceeding meters in height; The functional fire elevator has a front room. The area of the independent fire elevator front room is: the front room area of the residential building is greater than square meters; The front room area of public buildings and high-rise factory (warehouse) buildings is greater than square meters. When the front room of the fire elevator is shared with the smoke proof staircase, its area is: the area of the shared front room in residential buildings is greater than square meters, and the area of the shared front room in public buildings and high-rise factory (warehouse) buildings is greater than square meters.The elevator stops on the first floor and the door does not move: the fire emergency landing function of the elevator is triggered by smoke or thermal sensors inside the building.  “& rdquo; Elevator shaft: The design conditions are provided by the user to the architectural design department. The architectural design department analyzes whether the on-site pit depth, top floor height, reaction force, etc. can meet the installation requirements of the elevator as well as which building structures are needed (such as smashing stairs or floors), and develops a renovation construction plan. If it is indeed necessary to change the elevator structure due to civil engineering conditions (such as car size, door opening width, etc.),Please note that there should be a space of over mm left on both sides of the escalator, and when arranged in parallel there is no restriction between the two escalators.During the use of elevators, some elevator users seek temporary workers or unqualified companies for elevator maintenance in order to reduce costs and save funds. Once safety issues arise, even the responsible unit cannot be found. If the maintenance is carried out by elevator manufacturers or qualified professional companies, on the one hand, the maintenance technology and quality are guaranteed, if any problems occur, someone is also responsible.The door closing button has no self maintenance function. During the designated maintenance period, the elevator components in operation are inspected, refueled, dust is removed, and safety devices are debugged. Including non-destructive testing and maintenance of elevator traction steel wire ropes.


ShanxiAutomatic sheet turnover machineHow do we choose according to our own needs?



The call button on each floor is no longer working, and the call is cut off.build,The call button on each floor is no longer working, and the call is cut off.If there is a reserved shaft in the villa residential area, the appropriate car model can be selected by comparing the width and depth of the elevator car based on the size, width, and depth of the shaft. If there is no reserved shaft, you can first choose the model of the elevator and create a new shaft based on the required reserved size space for different models.The speed limiter tensioning device and the steel belt tensioning device should be equipped with a safety switch.Shanxi,There are dedicated operation buttons for firefighters at appropriate positions at the entrance of the first floor elevator. The operation buttons are generally protected by glass sheets and have a red&# quo; mark in place; Dedicated to fire protection; Words such as.Attention: The elevator consists of two main parts: mechanical and electrical. If the elevator is not maintained on a daily basis, its safety cannot be guaranteed. If the elevator needs to be refueled without refueling, it will cause wear and tear on the mechanical components of the elevator, greatly shortening its service life and preventing normal use of the elevator.  “& rdquo; Elevator shaft: The design conditions are provided by the user to the architectural design department. The architectural design department analyzes whether the on-site pit depth, top floor height, as well as which building structures are needed (such as smashing stairs or floors), and develops a renovation construction plan. If it is indeed necessary to change the elevator structure due to civil engineering conditions (such as car size, door opening width, etc.), then consider the non-standard design of the elevator.


comment list
  • Gottwain

    The logistics of ShanxiAutomatic sheet turnover machine is a bit slow. Overall it's good, I hope I have a chance to cooperate next time

  • Teijin Cleaning Services

    The quality is very good, exactly the same as the seller’s description, very satisfied, really like it, completely exceeding expectations, the delivery speed is very fast, the packaging is very carefu

  • Nippon Fine Chemicals Co., Ltd.

    ShanxiAutomatic sheet turnover machineYes, give you a good comment

©2009-2024Industrial Microblog  Sitemap