Strong deformation resistance, not easy to crack, smooth stable and safe. Polyurethane material has stable porosity structure and basically closed pore structure. It not only has excellent thermal insulation performance, but also has good freeze-thaw resistance and sound absorption performance. Under normal service and maintenance conditions, the life expectancy of rigid foam polyurethane insulation can reach more than years. During the structural life period, it can reach the unit price of dry, wet or electric corrosion under normal service conditions, while the unit price of insect, fungus or algae foam material is higher than other traditional insulation materials,SvishtovFruit preservation cold storage, but heating will increase the cost and the cooling cost will be greatly reduced.The air conditioning warehouse is equipped with standby power supply. After eliminating the line and load problems, it is the maintenance of external irresistible power lines. If the refrigerated goods in the air conditioning warehouse are expensive or vulnerable to temperature changes, it can be considered to equip the air conditioning warehouse with standby power supply to ensure the operation of refrigeration equipment in the cold storage in a short time after power failure. Large air conditioning warehouses can be considered to be equipped with generator sets, Automatically switch the generator set for power generation after power failure for use. For example, dual mains power can be used.Install the library body. Generally, the warehouse body can be divided into small warehouse body and large warehouse body. The small warehouse body is basically a combined cold storage assembled with warehouse plate. The large warehouse body is mostly a civil cold storage. The assembled or constructed warehouse body is generally required to be flat, compact and solid, without hollow feeling, load-bearing, antifreeze, moisture-proof, etc.The cost is reasonable,The medical cold storage has been widely used in the industry. For the use of the medical cold storage project, we must combine the performance of the product and store it according to the temperature and humidity required by the product. The automatic temperature box also needs to be used outside the product cold storage. At the same time, the management personnel must be familiar with the operation steps of the medical cold storage project.The two sets of connectors between the cold storage shall be wedged tightly, and the two sets of connectors shall be fixed at the upper, outer and lower sides of the cracks in the cold storage respectively. The lower connector shall be as close as possible, so as to facilitate the use of concrete to cover the connector in the future.In order to maintain a constant low temperature in the cold storage, attention should be paid to the installation of cold storage panels in Guizhou: the floor, wall and flat roof of the cold storage are laid with a certain thickness of thermal insulation materials to reduce the incoming heat from the outside. In order to reduce the absorption of solar radiation, the surface of the external wall of the cold storage is painted white or light color. Therefore, cold storage building is different from general industrial and civil buildings, and has its unique structure. Cold storage buildings should prevent the entry of air and the diffusion of water vapor.
Simple refrigeration is based on the volatilization of refrigerant in the condenser of the cold storage, so as to cool the refrigerant, and then input the refrigerant into the box or building of the refrigeration equipment to cool the air according to the heat exchanger. This kind of refrigeration has slow cooling speed, large total heat conduction temperature difference and complex system software, so it can only be used in less places, such as brine ice making and cold storage with constant temperature requirements.Customer first,The combined cold storage does not cool or the cooling effect is poor. Check whether the condenser of the refrigerator is dirty. Whether frost is too thick on the evaporator in the warehouse. Check whether the refrigerant is leaking (apply soapy water to the pipeline connection, and if bubbles are generated,SvishtovConstruction and installation of cold storage, it indicates that the refrigerant is leaking). And ask the combined cold storage engineering personnel to supplement the refrigerant and deal with the leakage. Check whether the sealing of the combined cold storage door is intact and eliminate it. Whether the refrigerator of the combined cold storage works. Whether the parameter setting of the computer controller of the cold storage is correct, and reassemble the cold storage door for installation. Check whether the cooler in the cold storage fails and replace it. Whether there is enough clearance for stacking articles in the warehouse and dredge them.Before the warehouse is fixed with angle aluminum, it shall be sealed with glass glue and fixed with angle aluminum with solid pull Mao. The distance between pull rivets is mm. The distance between the upper and lower sides of the door is mm.Insufficient refrigeration dose and capacity in the system: there are two main reasons for insufficient refrigerant circulation,Svishtov, timely handle the overhaul and maintenance of the refrigeration compressor in the cold storage: generally, the refrigeration oil and drying filter shall be replaced times after the operation of the cold storage equipment. Replacement after half a year. Depending on the circumstances.When installing the polyurethane insulation board, the adhesion between the panel of the polyurethane insulation board and the thermal insulation material is short and often high.Install the electric control system. The electric control system of the cold storage mainly includes electric controller, electric door, lighting and other electrical equipment in the cold storage. The power supply of the cold storage is required to be stable phase line, and the power supply or backup power supply can be used as required. The circuit shall have reasonable discharge and corresponding protective measures.
It is still affordable to buy things online, SvishtovSmall fresh-keeping cold storage I signed for two days late, but the things are really good, and the boss is good. The speed of transportation is a
The logistics of SvishtovSmall fresh-keeping cold storage is a bit slow. Overall it's good, I hope I have a chance to cooperate next time
Happy cooperation and tight packaging. Let’s talk about business services: Like
Although SvishtovSmall fresh-keeping cold storage has not yet arrived, I am looking forward to it, and the inquiry is still in transit.
Good seller, thank you. My colleagues like SvishtovSmall fresh-keeping cold storage very much. Come again next time!
Let me evaluate this SvishtovSmall fresh-keeping cold storage, the price is good, the quality is good, the delivery is good, and the boss is good.